Letter Sequence Response to RAI |
|---|
|
Results
Other: L-PI-03-016, Response to Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events, ML013480323, ML020020074, ML020020108, ML020030002, ML020410002, ML020570514, ML021060641, ML021070317, ML021140405, ML021140426, ML021610096, ML021990405, ML022140006, ML022600292, ML023290377, ML023640310, ML031010026, ML032040412, ML050900176, ML051030051
|
MONTHYEARML0134803232002-01-0404 January 2002 Task Interface Agreement 2000-18, Design-Basis Assumptions for Non-Seismic Piping Failures at the Perry Plant Project stage: Other ML0200201082002-01-16016 January 2002 Opportunity for Comment on TIA 2001-04, Design-Basis Reliance on Non-Seismic and Non-Safety Related Equipment Project stage: Other ML0200300022002-01-16016 January 2002 Opportunity for Comment on TIA 2001-10, Design Basis Assumptions for Ability of Prairie Island, Units 2, Emergency Diesel Generators to Meet Single Failure Criteria for External Events Project stage: Other ML0200200742002-01-18018 January 2002 Opportunity for Comment on TIA 2001-02, Design Basis Assumptions for Non-Seismic Piping Failure Project stage: Other ML0204100022002-02-11011 February 2002 Report on the Status of Open TIAs Assigned to NRR Project stage: Other ML0208702382002-03-13013 March 2002 Response to Request for Additional Information (RAI) Regarding Technical Specification (TS) Change 01-10, One-Time Frequency Extension for Type a Test (Containment Integrated Leak Rate Test (Cilrt)) Project stage: Response to RAI ML0208003112002-03-18018 March 2002 Day Response to Order for Interim Safeguards Security Compensatory Measures Project stage: Request ML0210100662002-04-0909 April 2002 TSC 01-10 - TVA Response to RAI Project stage: Request ML0211404052002-04-11011 April 2002 Additional Information for Technical Specification (TS) Change 01-10, One-Time Frequency Extension for Type a Test (Containment Integrated Leak Rate Test (Cilrt)) Project stage: Other ML0210703172002-04-17017 April 2002 Memo to Raghavan from Manoly, Response to Task Interface Agreement (TIA 2001-15) for D. C. Cook, Units 1 and 2 Project stage: Other ML0210606412002-05-0101 May 2002 Task Interface Agreement (TIA) 2001-07 from Region III Regarding Quad Cities Maintenance Rule (MR) Issues Project stage: Other ML0205705142002-05-0606 May 2002 Response to Task Interface Agreement - TIA 2001-12, Licensing Bases for the Standby Liquid Control System Project stage: Other ML0212904652002-05-10010 May 2002 Meeting with Nuclear Management Company, LLC to Discuss the Aspects of Security Orders Project stage: Request ML0215504192002-05-10010 May 2002 Response to Draft NRR Position on TIA 2001-04, Design Basis Reliance on Non-Seismic and Non-Safety Related Equipment Project stage: Draft Other ML0215504132002-05-10010 May 2002 Response to Draft NRR Position on TIA 2001-02, Design Basis Assumptions for Non-Seismic Piping Failure Project stage: Draft Other ML0211404262002-05-24024 May 2002 Memo Re Response to Task Interface Agreement 2001-009 Regarding Potential Unisolable Reactor Coolant Leak Outside Containment Project stage: Other ML0509001762002-05-28028 May 2002 Fire Hazard Analysis for Fire Zone 98-J, Emergency Diesel Generator Corridor and Fire Zone 99-M, North Electrical Switchgear Room, Arkansas Nuclear One, Unit 1 Project stage: Other ML0214800332002-05-31031 May 2002 DC Cook, Units 1 & 2 - Request for Additional Information Regarding Containment Structure Conformance to Design-Basis Requirements Project stage: RAI ML0216100962002-06-11011 June 2002 Information Sent & Received by Electronic Mail Concerning Heavy Loads Request for Additional Infomration Project stage: Other 05000237/LER-2002-003, Manual Valve Failures Prevent the Cooling Water Flow to Control Room Refrigeration Condensing Unit2002-07-0808 July 2002 Manual Valve Failures Prevent the Cooling Water Flow to Control Room Refrigeration Condensing Unit Project stage: Request ML0220301902002-07-16016 July 2002 Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements Project stage: Response to RAI ML0220303702002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages A30.1 - A56.4 Project stage: Response to RAI ML0220304002002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages A57.1 - A80.10 Project stage: Response to RAI ML0220304152002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Engineering Report SE 99-5, Attachment 6 to AEP:NRC:2520, Pages 1 - B29.6 Project stage: Response to RAI ML0220304172002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages A81.1 - 1.2 Project stage: Response to RAI ML0220304462002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Pages B30.1 - B67.6 Project stage: Response to RAI ML0220304482002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Solvia Verification Manual, Attachment 6, Pages B68.1 - Attachment 7 Project stage: Response to RAI ML0220303342002-07-16016 July 2002 Attachment to Response to NRC Request for Additional Information Re Containment Structure Conformance to Design Basis Requirements. Attachment 5, Solvia Engineering Report SE 99-4 Project stage: Response to RAI ML0219904052002-07-18018 July 2002 Supplemental Fire Modeling for Fire Zone 98-J, Emergency Diesel Generator Corridor & Fire Zone 99-M, North Electrical Switchgear Room, Arkansas Nuclear One, Unit 1 Project stage: Other ML0224100432002-08-23023 August 2002 Supplement to Nuclear Regulatory Commission Request for Additional Information Regarding Containment Structure Conformance to Design Basis Requirements Project stage: Supplement ML0223805242002-08-23023 August 2002 License Amendment Request for One-Time Extension of Essential Service Water System Allowed Outage Time-Additional Information Project stage: Request ML0221400062002-08-29029 August 2002 Response to Task Interface Agreement (TIA 2001-02) &Tia 2001-04 Evaluation of Service Water System Design Basis Requirements Project stage: Other ML0224201372002-09-11011 September 2002 Cover Letter - Draft Response to Task Interface Agreement 2001-13 Concerning the Reactor Building Crane and Heavy Loads Project stage: Draft Other ML0226002922002-09-17017 September 2002 Memorandum Regarding Report on the Status of Open TIAs Assigned to NRR Project stage: Other ML0231000392002-11-11011 November 2002 Examples of Risk-Informed Licensing Actions for Acrs/Acnw Project stage: Request ML0236403102002-12-30030 December 2002 Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design-Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events Project stage: Other ML0510300512003-01-13013 January 2003 Response to Task Interface Agreement (TIA 2001 -15) Regarding Evaluation of Containment Structure Conformance to Design-basis Requirements Project stage: Other ML0232903772003-01-13013 January 2003 Task Interface Agreement (TIA 2001-15) Evaluation of Containment Structure Conformance to Design-Basis Requirement Project stage: Other ML0224200972003-02-21021 February 2003 Draft - NRR Response to TIA 2001-13, Backfitting Requirements for Dresden Units 2 & 3 Reactor Building Crane Project stage: Draft Other ML0310100262003-02-21021 February 2003 NRC Response to TIA 2001-13, Backfitting Requirements for Dresden Units 2 & 3 Reactor Building Crane Project stage: Other L-PI-03-016, Response to Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events2003-04-21021 April 2003 Response to Opportunity for Comment on Task Interface Agreement (TIA) 2001-10, Design Basis Assumptions for Ability of Prairie Island, Unit 2, Emergency Diesel Generators to Meet Single-Failure Criteria for External Events Project stage: Other ML0320404122003-09-0404 September 2003 Response to TIA 2001-10, Design Basis Assumptions for Ability of Emergency Diesel Generators to Meet Single Failure Criteria for External Events Project stage: Other ML0411204872004-04-13013 April 2004 License Amendment Request to Use Yield Strength Determined from Measured Material Properties for Reinforcing Bar in Structural Calculations for Control Rod Drive Missile Shields Project stage: Request 2002-05-28
[Table View] |
Similar Documents at Cook |
|---|
|
Text
Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1373 INDIANA MICHIGAN POWER July 16, 2002 AEP:NRC:2520 10 CFR 50.90 Docket No.:
50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 RESPONSE TO NUCLEAR REGULATORY COMMISSION REQUEST FOR ADDITIONAL INFORMATION REGARDING CONTAINMENT STRUCTURE CONFORMANCE TO DESIGN BASIS REQUIREMENTS (TAC NOS. MB3603 AND MB33604)
Reference:
Letter from J. F. Stang (NRC) to A. C. Bakken (I&M),
"Donald C. Cook Nuclear Plant, Units 1 and 2 - Request for Additional Information, Regarding Containment Structure Conformance to Design Basis Requirements (TAC Nos. MB3603 and MB3604)," dated May 31, 2002 This letter provides Indiana Michigan Power Company's (I&M) response to a Nuclear Regulatory Commission request for additional information (RAI) regarding conformance of the containment structures at Donald C. Cook Nuclear Plant to design basis requirements. The RAI was transmitted by the referenced letter.
The referenced letter documented I&M's agreement to provide its response to the RAI by July 2, 2002. In subsequent telephone discussions, I&M informed J. F. Stang, NRC, that the response would be submitted by July 16, 2002. to this letter provides the requested information. Attachments 2 through 6 provide additional documentation supporting the information provided in Attachment 1. Attachment 7 documents a new commitment contained in this letter.
A0`1
U. S. Nuclear Regulatory Commission AEP:NRC:2520 Page 2 Should you have any questions, please contact Mr. Gordon P. Arent, Manager of Regulatory Affairs, at (616) 697-5553.
Sincerely, S tA. Greenlee Director of Nuclear Technical Services JRW/jen Attachments:
- 1. Response to Nuclear Regulatory Commission Request for Additional Information Regarding Containment Structure Conformance to Design Basis Requirements
- 2. AEP Report No. NED-2001-010-REP, "Test Report for Reactor Reflective Insulation Crushing Experiments," dated May 2001
- 3. AEP Report No. NED-2001-011-REP, "The response of Reflective Insulation and HVAC Ducting to Design Basis Events," dated May 2001
- 4. Comparison of Selected Verification Problems - ADINA versus SOLVIA
- 5. Solvia Engineering Report SE 99-4, "SOLVIA Verification Manual Linear Examples"
- 6. Solvia Engineering Report SE 99-5, "SOLVIA Verification Manual Non-Linear Examples"
- 7. Comittments c:
K. D. Curry, w/o attachments J. E. Dyer MDEQ - DW & RPD, w/o attachments NRC Resident Inspector R. Whale, w/o attachments