Questions Answers Results Other: 05000206/LER-1988-009, :on 880526,potential Diesel Loads in Excess of Regulatory Commitments.Caused by Calculation Errors & Inadequate Understanding of Loads on Diesel Generator. Personnel Trained in Proper Methodology, 05000206/LER-1988-009-01, :on 880526,determined That Max Electrical Load Imposed on Diesel Generators in Excess of Tech Spec 4.4 Limit.Cause Under Investigation.Members Involved Have Reviewed Event & Received Training, ML13316A938, ML13316B046, ML13322A027, ML13322A030, ML13324A861, ML13330B319, ML13330B351, ML13330B354, ML13330B356, ML13331B056, ML13331B057 | |
| From | |
MONTHYEARML13324A8611986-05-19019 May 1986
[table view]Forwards Results of Insps Performed on Emergency Diesel Generator 1 on Nov 1985 - Feb 1986,per Tdi Diesel Generator Owners Group Feb 1985 Rept Recommendation.Rept on Emergency Diesel Generator 2 Will Be Submitted by 860613 ML13316A9351986-07-0303 July 1986 Forwards Amend 95 to License DPR-13 & Safety Evaluation. Amend Modifies Tech Specs to Incorporate Load Limitations for Emergency Diesel Engine Testing & Monthly Surveillance Test Conditions ML13316A9381986-07-0303 July 1986 Amend 95 to License DPR-13,modifying Tech Specs to Incorporate Load Limitations for Emergency Diesel Engine Testing & Monthly Surveillance Test Conditions ML13316A9391986-07-0303 July 1986 Safety Evaluation Supporting Amend 95 to License DPR-13 ML13330B3191988-05-27027 May 1988 Forwards Sixth Edition of Integrated Implementation Schedule (Iis) Per License Condition 3.J,providing Update on Changes & Progress Re Mods Scheduled for Cycle X.Schedule Rev for Cycle XI & Later Outages Planned for Next IIs Edition ML13322A0271988-06-17017 June 1988 Rev 2 to Design Calculation for Emergency Diesel Generators Loading DC 1809 IR 05000206/19880131988-06-22022 June 1988 Insp Repts 50-206/88-13,50-361/88-11 & 50-362/88-11 on 880410-0521.No Violations Noted.Major Areas Inspected: Operational Safety Verification,Evaluation of Plant Trips & Events & Monthly Surveillance & Maint Activities 05000206/LER-1988-009-01, :on 880526,determined That Max Electrical Load Imposed on Diesel Generators in Excess of Tech Spec 4.4 Limit.Cause Under Investigation.Members Involved Have Reviewed Event & Received Training1988-06-27027 June 1988
1988-06-27 | |