Other: 05000266/LER-1981-009, Forwards LER 81-009/01T-0, 05000266/LER-1981-009-01, /01T-0:on 810714,per IE Bulletin 80-11 Analyses, Contractor Reported That Four Control Room & Two Battery Room Walls Did Not Meet Revised Criteria for Seismic Event. Caused by Reanalysis Per Revisions.Supports Installed, ML19312F018, ML19327A057, ML19351F304, ML20005B269, ML20010G974, ML20010G981, ML20010G988, ML20010G992, ML20010G998, ML20011A461, ML20011A463, ML20011A466, ML20011A469, ML20011A476, ML20011A483, ML20011A484, ML20011A488, ML20030B585, ML20030B590, ML20030B594, ML20053A618, ML20054F570 | |
| From | |
MONTHYEARML19327A0571980-07-18018 July 1980
[table view]Responds to IE Bulletin 80-11, Masonry Wall Design. Fifty- Two Masonry Walls or Blockouts Whose Failure Could Affect safety-related Equipment Identified.Walls Will Be Upgraded or Verified as to Required Design Loadings ML19351F3041980-12-26026 December 1980 Suppl 800718 Response to IE Bulletin 80-11 Re Masonry Wall Design.Wall Omitted from First Analysis Will Be Reanalyzed Using Criteria of ML20005B2691981-06-19019 June 1981 Trip Rept of 810608-12 Site Visit to Conduct Annual Plant Visit & Audit Masonry Wall Site ML20011A4881981-06-30030 June 1981 Masonry Test Procedures for Point Beach Nuclear Power Plant. Responses Encl ML20236Y4401981-07-0101 July 1981 Summary of Site Audit & 810609-11 Meeting W/Util Re Response to IE Bulletin 80-11 on Masonry Walls.Lists of Attendees & Action Items Resulting from Meeting Encl ML20009D5301981-07-17017 July 1981 Forwards Masonry Test Procedures for Point Beach Nuclear Power Plant, in Response to Questions Raised at 810609-11 Meeting W/Nrc Re Onsite Review & Audit of Util Responses to IE Bulletin 80-11 05000266/LER-1981-009-01, /01T-0:on 810714,per IE Bulletin 80-11 Analyses, Contractor Reported That Four Control Room & Two Battery Room Walls Did Not Meet Revised Criteria for Seismic Event. Caused by Reanalysis Per Revisions.Supports Installed1981-07-28028 July 1981 /01T-0:on 810714,per IE Bulletin 80-11 Analyses, Contractor Reported That Four Control Room & Two Battery Room Walls Did Not Meet Revised Criteria for Seismic Event. Caused by Reanalysis Per Revisions.Supports Installed 05000266/LER-1981-009, Forwards LER 81-009/01T-01981-07-28028 July 1981 Forwards LER 81-009/01T-0 ML20011A4841981-07-31031 July 1981 Modal Contribution to Dynamic Analysis Results ML20030B5851981-08-14014 August 1981 Forwards Responses to Action Items 8,15,18,19 & 20 Formulated During NRC 810609-11 Onsite Review & Audit of Util Responses to IE Bulletin 80-11, Masonry Wall Design ML20010G4041981-08-27027 August 1981 Summary of 810825 Meeting W/Util & Consultants Re Masonry Wall Prism Sample Mod ML20030B5941981-08-31031 August 1981 Out-of-Plane Drift Effect on Wall 19/9 ML20030B5901981-08-31031 August 1981 Assessment of Reinforcement on Capacity & Behavior of Masonry Walls ML19312F0181981-09-15015 September 1981 Concrete Block & Prism Testing ML20011A4661981-09-30030 September 1981 Evaluation of Allowable Tensile Stresses Normal to Bed Joint ML20010G9811981-09-30030 September 1981 Justification of Using Plate Solution for Wall 3-1/1 ML20010G9741981-09-30030 September 1981 Evaluation of Single Wythe Assumption to Represent Multiple Wythe Walls ML20011A4761981-09-30030 September 1981 Evaluation of Single Wythe Assumption to Represent Multiple Wythe Walls ML20010G9981981-09-30030 September 1981 Comparison Between Finite Element Plate Analysis & One Way Beam Action ML20010G9921981-09-30030 September 1981 Procedure to Account for Out-of -Plane Interstory Drift Effects on Masonry Wall Evaluation ML20011A4631981-09-30030 September 1981 Evaluation of Allowable In-Plane Shear Stresses & Strains ML20010G9881981-09-30030 September 1981 Evidence of Voting on Bssc Ballot Item 5A/46 ML20011A4831981-09-30030 September 1981 Procedure to Account for Out-of-Plane Interstory Drift Effects on Masonry Wall Evaluation ML20011A4691981-09-30030 September 1981 Compressive Strength of Prisms & Concrete Blocks ML20011A4611981-10-0707 October 1981 Forwards Addl Info in Response to IE Bulletin 80-11 Re Masonry Walls ML20053A9871982-05-11011 May 1982 Forwards Results from Review of Responses to IE Bulletin 80-11, Masonry Wall Design. Bulletin Fully Implemented for Facility Subj to Review & Acceptance of Confirmatory Plate Analysis ML20053A6181982-05-18018 May 1982 Forwards Technical Evaluation Rept Re Masonry Wall Design, Inadvertently Omitted from .W/O Encl ML20054F5701982-06-11011 June 1982 Forwards Addl Info Re Safety Evaluation Concerning Implementation of IE Bulletin 80-11, Masonry Wall Design. Results of Confirmatory Plate Analysis After Mods on Walls 19,111-1,111-3N,113 & 114 Encl 1981-07-31 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:42896&oldid=3222359"