TAC:42894
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Results
Other: ML18053A345, ML19350C450, ML20002A565, ML20115A519, ML20263C286, ML20263C289, ML20263C292, ML20263C295, ML20263C298, ML20263C301, ML20263C304, ML20263C307, ML20263C309, ML20263C312 | |
From | |
MONTHYEARML20002A5651980-11-0404 November 1980
[table view]Provides Addl Info Re IE Bulletin 80-11, Masonry Wall Design. Revised Log Sheets Describing Walls,Priority by Which Walls Will Be re-evaluated & Acceptance Criteria Encl. Final Rept Will Be Sent by 810302 ML19350C4501981-03-0303 March 1981 Responds to IE Bulletin 80-11, Masonry Wall Design. Addl Time Will Be Required to Complete Mods to Masonry Walls & re-evaluations of Const Work.Current Status of re-evaluation & Const Efforts Discussed ML20263C3041981-09-25025 September 1981 As-Built Modification Details:Walls T-1A,B,C & D Turbine Building. Sheet 2 of 2 ML20263C3011981-09-25025 September 1981 As-Built Modification Details:Walls T-1A,B,C & D Turbine Building. Sheet 1 of 2 ML20263C2981981-09-25025 September 1981 As-Built Modification Details:Walls T-32A,B,C & D Turbine Building. Sheet 2 of 2 ML20263C3121981-10-0909 October 1981 As-Built Modification Details:Walls T-27A Thru F Turbine Building. Sheet 3 of 3 ML20263C3091981-10-0909 October 1981 As-Built Modification Details:Walls T-27A Thru F Turbine Building. Sheet 2 of 3 ML20263C3071981-10-0909 October 1981 As-Built Modification Details:Walls T-27A Thru F Turbine Building. Sheet 1 of 3 ML20263C2951981-10-0909 October 1981 As-Built Modification Details:Walls T-32A,B,C & D Turbine Building. Sheet 1 of 2 ML20263C2921981-11-23023 November 1981 Concrete Block Wall Modifications Turbine Building Plans, Sections & Details ML20263C2861981-11-23023 November 1981 Conc Block Wall Modifications Primary Auxiliary Building Plan at El 21 Ft 6 Inches & Sections ML20263C2891982-02-11011 February 1982 Concrete Block Wall Modifications Turbine Building Plans, Sections & Details ML20027C4841982-09-28028 September 1982 Forwards Request for Addl Info to Complete Review of 801104 Response to IE Bulletin 80-11, Masonry Wall Design. Response Expected within 60 Days of Ltr Receipt ML20028G5331983-01-25025 January 1983 Summary of 830120 Meeting W/Utils,Bechtel,Franklin Research Ctr,Urs & Computech Engineering Svcs Re IE Bulletin 80-11, Masonry Wall Design. Addl Testing Not Warranted ML18053A3451983-03-31031 March 1983 Tech Rept on Use of Joint Reinforcement in Block Masonry Walls B11047, Advises That GE Cask IF-300 Will Be Utilized for Disposal of Thermal Shield.Three Shipments to Barnwell,Sc Disposal Site in Spent Fuel Railroad Transportation Cask Planned1984-02-24024 February 1984 Advises That GE Cask IF-300 Will Be Utilized for Disposal of Thermal Shield.Three Shipments to Barnwell,Sc Disposal Site in Spent Fuel Railroad Transportation Cask Planned A03831, Forwards Partial Response to 840224 Request for Addl Info Re IE Bulletin 80-11, Masonry Wall Design. Response to Questions 3 & 4 Re Use of Increase Factors for Allowable Stresses & Arching Action Should Be Complete by Sept 19841984-05-11011 May 1984 Forwards Partial Response to 840224 Request for Addl Info Re IE Bulletin 80-11, Masonry Wall Design. Response to Questions 3 & 4 Re Use of Increase Factors for Allowable Stresses & Arching Action Should Be Complete by Sept 1984 B11418, Forwards Response to 840224 Request for Addl Info on IE Bulletin 80-11 Re Masonry Wall Design.Complete Response to Question 4 Re Nonlinear Analysis Technique Provided1985-01-0404 January 1985 Forwards Response to 840224 Request for Addl Info on IE Bulletin 80-11 Re Masonry Wall Design.Complete Response to Question 4 Re Nonlinear Analysis Technique Provided ML20115A5191985-03-22022 March 1985 Masonry Wall Design for Millstone Point Unit 2, Technical Evaluation Rept 1982-09-28 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:42894&oldid=5022144"