ML20263C304
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
---|---|
TAC:42894, (Open) | |
Administration Results
Other: ML18053A345, ML19350C450, ML20002A565, ML20115A519, ML20263C286, ML20263C289, ML20263C292, ML20263C295, ML20263C298, ML20263C301, ML20263C304, ML20263C307, ML20263C309, ML20263C312 | |
MONTHYEARML20002A5651980-11-0404 November 1980
[Table View]Provides Addl Info Re IE Bulletin 80-11, Masonry Wall Design. Revised Log Sheets Describing Walls,Priority by Which Walls Will Be re-evaluated & Acceptance Criteria Encl. Final Rept Will Be Sent by 810302 Project stage: Other ML19350C4501981-03-0303 March 1981 Responds to IE Bulletin 80-11, Masonry Wall Design. Addl Time Will Be Required to Complete Mods to Masonry Walls & re-evaluations of Const Work.Current Status of re-evaluation & Const Efforts Discussed Project stage: Other ML20263C3041981-09-25025 September 1981 As-Built Modification Details:Walls T-1A,B,C & D Turbine Building. Sheet 2 of 2 Project stage: Other ML20263C3011981-09-25025 September 1981 As-Built Modification Details:Walls T-1A,B,C & D Turbine Building. Sheet 1 of 2 Project stage: Other ML20263C2981981-09-25025 September 1981 As-Built Modification Details:Walls T-32A,B,C & D Turbine Building. Sheet 2 of 2 Project stage: Other ML20263C3121981-10-0909 October 1981 As-Built Modification Details:Walls T-27A Thru F Turbine Building. Sheet 3 of 3 Project stage: Other ML20263C3091981-10-0909 October 1981 As-Built Modification Details:Walls T-27A Thru F Turbine Building. Sheet 2 of 3 Project stage: Other ML20263C3071981-10-0909 October 1981 As-Built Modification Details:Walls T-27A Thru F Turbine Building. Sheet 1 of 3 Project stage: Other ML20263C2951981-10-0909 October 1981 As-Built Modification Details:Walls T-32A,B,C & D Turbine Building. Sheet 1 of 2 Project stage: Other ML20263C2921981-11-23023 November 1981 Concrete Block Wall Modifications Turbine Building Plans, Sections & Details Project stage: Other ML20263C2861981-11-23023 November 1981 Conc Block Wall Modifications Primary Auxiliary Building Plan at El 21 Ft 6 Inches & Sections Project stage: Other ML20263C2891982-02-11011 February 1982 Concrete Block Wall Modifications Turbine Building Plans, Sections & Details Project stage: Other ML20027C4841982-09-28028 September 1982 Forwards Request for Addl Info to Complete Review of 801104 Response to IE Bulletin 80-11, Masonry Wall Design. Response Expected within 60 Days of Ltr Receipt Project stage: RAI ML20028G5331983-01-25025 January 1983 Summary of 830120 Meeting W/Utils,Bechtel,Franklin Research Ctr,Urs & Computech Engineering Svcs Re IE Bulletin 80-11, Masonry Wall Design. Addl Testing Not Warranted Project stage: Meeting ML18053A3451983-03-31031 March 1983 Tech Rept on Use of Joint Reinforcement in Block Masonry Walls Project stage: Other B11047, Advises That GE Cask IF-300 Will Be Utilized for Disposal of Thermal Shield.Three Shipments to Barnwell,Sc Disposal Site in Spent Fuel Railroad Transportation Cask Planned1984-02-24024 February 1984 Advises That GE Cask IF-300 Will Be Utilized for Disposal of Thermal Shield.Three Shipments to Barnwell,Sc Disposal Site in Spent Fuel Railroad Transportation Cask Planned Project stage: Request A03831, Forwards Partial Response to 840224 Request for Addl Info Re IE Bulletin 80-11, Masonry Wall Design. Response to Questions 3 & 4 Re Use of Increase Factors for Allowable Stresses & Arching Action Should Be Complete by Sept 19841984-05-11011 May 1984 Forwards Partial Response to 840224 Request for Addl Info Re IE Bulletin 80-11, Masonry Wall Design. Response to Questions 3 & 4 Re Use of Increase Factors for Allowable Stresses & Arching Action Should Be Complete by Sept 1984 Project stage: Request B11418, Forwards Response to 840224 Request for Addl Info on IE Bulletin 80-11 Re Masonry Wall Design.Complete Response to Question 4 Re Nonlinear Analysis Technique Provided1985-01-0404 January 1985 Forwards Response to 840224 Request for Addl Info on IE Bulletin 80-11 Re Masonry Wall Design.Complete Response to Question 4 Re Nonlinear Analysis Technique Provided Project stage: Request ML20115A5191985-03-22022 March 1985 Masonry Wall Design for Millstone Point Unit 2, Technical Evaluation Rept Project stage: Other 1982-09-28 |
ML20263C304 | |
Person / Time | |
---|---|
Site: | Millstone, Haddam Neck, 05000000 |
Issue date: | 09/25/1981 |
From: | NORTHEAST UTILITIES SERVICE CO. |
To: | |
Shared Package | |
ML20064D019 | List: |
References | |
REF-SSINS-6820, REF-SSINS-SSINS-6 25202-54064, IEB-80-11, TAC-42894, NUDOCS 8301040609 | |
Download: ML20263C304 (1) | |
Category:DRAWINGS
MONTHYEARML20266B9911997-11-14014 November 1997
[Table view]4.18KV One Line Diagram Bus 34A (3NNS-SWG-A).Sheet 3.Date Illegible ML20266B8831997-11-0505 November 1997 125V Misc DC One Line Diagram Battery NO.2.Sheet 1 ML20266B8431997-11-0505 November 1997 480V One Line Diagram (3NJS-US-7A & 3NJS-US-7B).Date Illegible ML20266B8381997-11-0505 November 1997 480V One Line Diagram (3EJS-US-2A & 3EJS-LS-3B).Date Illegible ML20266B8241997-11-0505 November 1997 4.16KV One Line Diagram Bus 34D (3ENS-SWG-B(-P)).Sheet 2 ML20266B8201997-11-0505 November 1997 4.16KV One Line Diagram Bus 34D (3ENS-SWG-B (-P)).Sheet 1. Date Illegible ML20266B9261997-10-0909 October 1997 4.16KV One Line Diagram Bus 34A&B (24INS-SWG-A&B) & Aac Diesel Gen (38GS-BG-A).Sheet 2 ML20266C9711997-09-10010 September 1997 Single Line Meter & Relay Diagram 4 16KV Buses 24A & 24B (A1 & A2) ML20266B5361997-08-27027 August 1997 Kv One Line Diagram Bus 34D 3ENS Swg 8 P.Sheet 2 ML20266B5001997-08-27027 August 1997 Piping & Instrumentation Diagram Reactor Plant Ventilation.Sheet 2 of 6 ML20266B7521997-08-13013 August 1997 Piping & Instrumentation Diagram Plant Drainage.Sheet 1 of 4 ML20266A3301997-06-30030 June 1997 Site Plan Drainage and Chemical Storage Plan.Sheet 6 of 6 ML20266A3251997-06-30030 June 1997 Site Plan Drainage and Chemical Storage Plan.Sheet 5 of 6 ML20266A3171997-06-30030 June 1997 Site Plan Drainage and Chemical Plan.Sheet 3 of 6 ML20266A3121997-06-30030 June 1997 Site Plan Drainage and Chemical Storage Plan.Sheet 2 of 6 ML20266A3071997-06-30030 June 1997 Site Plan Drainage and Chemical Storage Plan.Sheet 1 of 6 ML20266B5761997-06-25025 June 1997 Piping & Instrumentation Diagram Emergency Diesel Generator a Lube Oil & Cooling Water.Sheet 1 of 5 ML20266C9671997-06-0909 June 1997 Main Single Line Diagram ML20266D0231997-05-30030 May 1997 Piping & Instrumentation Diagram Containment & Enclosure Building Ventilation.Sheet 5 of 5 ML20266B9331997-05-27027 May 1997 480V MCC One Line Diag Crclt Water Pumphouse ML20266B7931997-05-23023 May 1997 4.16KV One Line Diagram Bus 348 (3NNS-SWG-3) S4 1.Sheet 1 of 1 ML20266B5311997-05-23023 May 1997 Kv One Line Diagram Bus 34D 3ENS Swg 8 P.Sheet 1 ML20266B5261997-05-23023 May 1997 Kv One Line Diagram Bus 34C 3ENS Swg a 0.Sheet 1 ML20266B8011997-05-23023 May 1997 4.16KV One Line Diagram Bus 34C (3ENS-SWG-A(-0)).Sheet 1 ML20266B5921997-05-13013 May 1997 Piping & Instrumentation Diagram Emergency Generator Fuel Oil System. Sheet 1 of 1 ML20266B8651997-05-0808 May 1997 480V MCC One Line Diag Control Bldg ML20266B8681997-05-0808 May 1997 125V DC One Line Diagram Batteries 301A-1 & 301A-2 ML20266B9431997-05-0808 May 1997 125V CC One Line Diagram Batteries 301B-1 & 301B-2 ML20266B5991997-05-0808 May 1997 V DC One Line Diagram Batteries 301A 1 & 301A 2 ML20266B6041997-05-0808 May 1997 V DC One Line Diagram Batteries 301B 1 & 301B 2 ML20266B8731997-05-0808 May 1997 125V DC One Line Diagram Batteries 3C:B-1 & 301B-2 ML20266B8051997-05-0808 May 1997 Piping & Instrumentation Diagram Reactor Plant Ventilation. Sheet 1 of 6 ML20266B7121997-05-0606 May 1997 Piping & Instrumentation Diagram Service Water.Sheet 3 of 4 ML20266B4971997-05-0303 May 1997 Piping & Instrumentation Diagram Reactor Plant Ventilation.Sheet 1 of 6 ML20266B8971997-05-0101 May 1997 120V Misc AC One Line Diagram.Sheet 5 ML20266C9921997-05-0101 May 1997 Piping & Instrumentation Diagram Emergency Diesel Generator H-7A Lube Oil,Air & Jacket Water Cooling.Sheet 2 of 5 ML20266C9961997-05-0101 May 1997 Piping & Instrumentation Diagram Emergency Diesel Generator H-7B Lube Oil,Air & Jacket Water Cooling.Sheet 3 of 5 ML20266A3211997-04-30030 April 1997 Site Plan Drainage and Chemical Storage Plan.Sheet 4 of 6 ML20266B5841997-04-23023 April 1997 Piping & Instrumentation Diagram Emergency Diesel Generator B Lub Oil & Cooling Water.Sheet 3 of 5 ML20266B6111997-04-21021 April 1997 V Distribution Pnl One Line Diag Emergency Diesel Generator 3EGS PNL1A 3EGS PNL1B ML20266B7151997-04-19019 April 1997 Piping & Instrumentation Diagram Service Water.Sheet 4 of 4 ML20266B5801997-04-10010 April 1997 Piping & Instrumentation Diagram Emergency Diesel Generator a Starting Air System.Sheet 2 of 5 ML20266B5861997-04-10010 April 1997 Piping & Instrumentation Diagram Emergency Diesel Generator B Starting Air System.Sheet 4 of 5 ML20266B8471997-04-0707 April 1997 480V MCC One Line Diag ESF Building 1.Sheet 1 ML20266B9291997-04-0707 April 1997 480V MCC One Line Diag Auxillary Bldg.Sheet 3 ML20266B8581997-04-0707 April 1997 480V MCC One Line Diag Rod Control Area.Sheet 1 ML20266B5531997-04-0707 April 1997 V MCC One Line Diag Dsl Encl & Aux Blr a ML20266B8541997-04-0707 April 1997 480V MCC One Line Diag Turbine Bldg.Sheet 2 ML20266B8511997-04-0707 April 1997 480V MCC Oneline Diag ESF Building.Sheet 2 ML20266B8611997-04-0707 April 1997 480V MCC One Line Diag Rod Control Area.Sheet 2 1997-09-10 Category:DRAWINGS-STRUCTURAL & CIVIL-APPLICANT'S MONTHYEARML20259G2681989-04-28028 April 1989
[Table view]Screenwell House Fire Area Boundaries. Sheet 8 of 8.No Rev Date ML20259G2631989-04-28028 April 1989 Reactor Containment Auxiliary Feedwater Pump Room & Cable Vault - Fire Area Boundaries. Sheet 7 of 8.No Rev Date ML20259G2591989-04-28028 April 1989 Primary Auxiliary Waste Disposal & Health Physics Bldgs Fire Area Boundaries. Sheet 6 of 8.No Rev Date ML20259G2521989-04-28028 April 1989 Cable Spreading Area & Turbine Building - Fire Area Boundaries. Sheet 4 of 8.No Rev Date ML20265D9301988-04-26026 April 1988 Steam Generator Weld Designations SG 1, as-built ML20265D9341988-04-26026 April 1988 Steam Generator No 2 Inservice Inspection Program, as-built ML20265D9251988-04-26026 April 1988 Steam Generator Weld Designations SG 2, as-built ML20259G2471988-02-29029 February 1988 Turbine & Service Buildings El 21 Ft 6 Inches Fire Area Boundaries Haddam Connecticut. Sheet 3 ML20259G2561988-02-29029 February 1988 Primary Aux & Diesel Gen 22 Ft Fire Boundaries Haddam Connecticut. Sheet 5 ML20259G2421988-02-29029 February 1988 Turbine Bldg Elev 37 Ft 6 Inches and Elev 41 Ft 6 Inches. Sheet 2 ML20259G2371988-02-29029 February 1988 Turbine & Service Bldgs EL.59 Ft 6-INCH Fire Area Boundaries Haddam Connecticut. Sheet 1 ML20266J6301987-05-0404 May 1987 LPSI TIE-CONNECTION to HPSI Pump Suction (Pumps P-15-1A,-1B). Sheet 115 ML20266F3171987-03-27027 March 1987 Switchgear Building Steel Framing Roof Plan El 58 Ft-6 Inches. Sheet 2 ML20266F3131987-03-27027 March 1987 Switchgear Building Steel Framing Floor El 27 Ft-6 Inches & 41 Ft-6 Inches. Sheet 1 ML20266F3261987-02-27027 February 1987 Switchgear Building Embeds & Misc Details. Sheet 4 ML20266F2401987-02-27027 February 1987 Plan - Plant Column Grid ML20266F3201987-02-27027 February 1987 Switchgear Building Embeds & Misc Details. Sheet 3 ML20266F3081987-02-27027 February 1987 Structural Steel Standard Details. Sheet 3 ML20266F3031987-02-27027 February 1987 Structural Steel Standard Details. Sheet 2 ML20266F2981987-02-27027 February 1987 Structural Steel Standard Details. Sheet 1 ML20266F2921987-02-27027 February 1987 Switchgear Building Wall Elevation Reinforcing - Embeds & Details. Sheet 8 ML20266F2871987-02-27027 February 1987 Switchgear Building Wall Elevations - Col 14 1/4 & 14 1/2 Reinforcing - Embeds & Details. Sheet 7 ML20266F2821987-02-27027 February 1987 Switchgear Building Wall Elevations - Col 13 1/2 & 14 3/4 Reinforcing - Embeds & Details. Sheet 6 ML20266F2771987-02-27027 February 1987 Switchgear Building Wall Elevation - Col Ga Reinforcing - Embeds & Details. Sheet 5 ML20266F2721987-02-27027 February 1987 Switchgear Building Wall Elevation - Col Gd Reinforcing - Embeds & Details. Sheet 4 ML20266F2671987-02-27027 February 1987 Switchgear Bldg Conc Floor Plans El 41 Ft-6 Inches & El 68 Ft-6 Inches. Sheet 3 ML20266F2621987-02-27027 February 1987 Switchgear Bldg Conc Floor Plans El 13 Ft-6 Inches & El 27 Ft-6 Inches. Sheet 2 ML20266F2571987-02-27027 February 1987 Switchgear Building Sheet Piling Plan - Sections & Details. Sheet 1 ML20266F2501987-02-27027 February 1987 Concrete Standard Details. Sheet 1 ML20266F2451987-02-27027 February 1987 Switchgear Building Plan-Finish Grading & Drainage Drywells. Sheet 1 ML20266F3301987-02-27027 February 1987 Switchgear Building Stairs Plans,Sections & Details. Sheet 1 ML20259B1721985-03-15015 March 1985 Slab Expansion Joint Details Vibration JOINT-SPLIT Sleeve & Grout Retaining Plate Details Steel Tank Fdns & Footing Notes Typical Electric Conduit Reinforcement. Sheet 5 ML20266F0471984-03-27027 March 1984 Fuel Pool Liner Embeds - Weld Identification Nos - Reactor Bldg 1. Sheet 1 ML20265E4981983-12-28028 December 1983 Concrete Details for Tornado Protection, as-built.Sheet 2 ML20265E5021983-10-0505 October 1983 Interior Conc OUTLINE-EL 48 FT-6 Inches Reactor Containment, as-built ML20263Q3401983-08-0404 August 1983 Masonry Wall Modifications Wall 103 & 170, as-built ML20263Q3421983-08-0404 August 1983 Masonry Wall Modifications Wall 2 & 133, as-built ML20266F0231983-05-16016 May 1983 Fuel Pool Liner Wall Plate - Weld Identification Nos - Reactor Bldg 1. Sheet 4 ML20266F0421983-05-16016 May 1983 Fuel Pool Liner Floor Plate - Weld Identification Nos - Reactor Bldg 1. Sheet 2 ML20266F0381983-05-16016 May 1983 Fuel Pool Liner Wall Plates - Weld Identification Nos - Reactor Bldg 1. Sheet 3 ML20266E9671983-05-0303 May 1983 Fuel Pool Liner Embeds & Plates Identification Nos - Fuel Building. Sheet 10 ML20266E9891983-04-21021 April 1983 Fuel Pool Liner Embeds & Plates Identification Nos - Fuel Building. Sheet 8 ML20266E9511983-04-21021 April 1983 Fuel Pool Liner Embeds & Plates Identification Nos - Fuel Building. Sheet 4 ML20266E9941983-04-21021 April 1983 Fuel Pool Liner Embeds & Plates Identification Nos - Fuel Building. Sheet 1 ML20266E9721983-04-21021 April 1983 Fuel Pool Liner Embeds & Plates Identification Nos - Fuel Building. Sheet 9 ML20266E9451983-04-21021 April 1983 Fuel Pool Liner Embeds & Plates Identification Nos - Fuel Building. Sheet 14 ML20266F0291983-04-21021 April 1983 Fuel Pool Liner Embeds & Plates Identification Nos - Fuel Building. Sheet 11 ML20266E9991983-04-21021 April 1983 Fuel Pool Liner Embeds & Plates Identification Nos - Fuel Building. Sheet 7 ML20266F0051983-03-22022 March 1983 Fuel Pool Liner Wall Plate Sections - Weld Id Nos - Reactor 1. Sheet 6 ML20266E9771983-03-22022 March 1983 Fuel Pool Liner Embeds & Plates Identification Nos - Fuel Building. Sheet 2 1989-04-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20263C304&oldid=3215489"