ML20263C301
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
|---|---|
TAC:42894, (Open) | |
Administration Results
Other: A03831, Forwards Addl Info Re IE Bulletin 80-11, Masonry Wall Design, in Response to NRC 840224 Request.Final Response to Question 4 Will Be Provided by 850103, ML17195A505, ML18053A345, ML19350C450, ML20002A565, ML20115A519, ML20263C286, ML20263C289, ML20263C292, ML20263C295, ML20263C298, ML20263C301, ML20263C304, ML20263C307, ML20263C309, ML20263C312 | |
MONTHYEARML20002A5651980-11-0404 November 1980
[Table View]Provides Addl Info Re IE Bulletin 80-11, Masonry Wall Design. Revised Log Sheets Describing Walls,Priority by Which Walls Will Be re-evaluated & Acceptance Criteria Encl. Final Rept Will Be Sent by 810302 Project stage: Other ML19350C4501981-03-0303 March 1981 Responds to IE Bulletin 80-11, Masonry Wall Design. Addl Time Will Be Required to Complete Mods to Masonry Walls & re-evaluations of Const Work.Current Status of re-evaluation & Const Efforts Discussed Project stage: Other ML20263C3041981-09-25025 September 1981 As-Built Modification Details:Walls T-1A,B,C & D Turbine Building. Sheet 2 of 2 Project stage: Other ML20263C3011981-09-25025 September 1981 As-Built Modification Details:Walls T-1A,B,C & D Turbine Building. Sheet 1 of 2 Project stage: Other ML20263C2981981-09-25025 September 1981 As-Built Modification Details:Walls T-32A,B,C & D Turbine Building. Sheet 2 of 2 Project stage: Other ML20263C3121981-10-0909 October 1981 As-Built Modification Details:Walls T-27A Thru F Turbine Building. Sheet 3 of 3 Project stage: Other ML20263C3091981-10-0909 October 1981 As-Built Modification Details:Walls T-27A Thru F Turbine Building. Sheet 2 of 3 Project stage: Other ML20263C3071981-10-0909 October 1981 As-Built Modification Details:Walls T-27A Thru F Turbine Building. Sheet 1 of 3 Project stage: Other ML20263C2951981-10-0909 October 1981 As-Built Modification Details:Walls T-32A,B,C & D Turbine Building. Sheet 1 of 2 Project stage: Other ML20263C2861981-11-23023 November 1981 Conc Block Wall Modifications Primary Auxiliary Building Plan at El 21 Ft 6 Inches & Sections Project stage: Other ML20263C2921981-11-23023 November 1981 Concrete Block Wall Modifications Turbine Building Plans, Sections & Details Project stage: Other ML20263C2891982-02-11011 February 1982 Concrete Block Wall Modifications Turbine Building Plans, Sections & Details Project stage: Other ML20027C4841982-09-28028 September 1982 Forwards Request for Addl Info to Complete Review of 801104 Response to IE Bulletin 80-11, Masonry Wall Design. Response Expected within 60 Days of Ltr Receipt Project stage: RAI ML20028G5331983-01-25025 January 1983 Summary of 830120 Meeting W/Utils,Bechtel,Franklin Research Ctr,Urs & Computech Engineering Svcs Re IE Bulletin 80-11, Masonry Wall Design. Addl Testing Not Warranted Project stage: Meeting ML18053A3451983-03-31031 March 1983 Tech Rept on Use of Joint Reinforcement in Block Masonry Walls Project stage: Other ML17195A5051983-06-30030 June 1983 Evaluation of Arching Theory in Unreinforced Masonry Walls in Nuclear Power Plants Project stage: Other B11047, Advises That GE Cask IF-300 Will Be Utilized for Disposal of Thermal Shield.Three Shipments to Barnwell,Sc Disposal Site in Spent Fuel Railroad Transportation Cask Planned1984-02-24024 February 1984 Advises That GE Cask IF-300 Will Be Utilized for Disposal of Thermal Shield.Three Shipments to Barnwell,Sc Disposal Site in Spent Fuel Railroad Transportation Cask Planned Project stage: Request ML20084R8501984-05-11011 May 1984 Forwards Partial Response to 840224 Request for Addl Info Re IE Bulletin 80-11, Masonry Wall Design. Response to Questions 3 & 4 Re Use of Increase Factors for Allowable Stresses & Arching Action Should Be Complete by Sept 1984 Project stage: Request A03831, Forwards Addl Info Re IE Bulletin 80-11, Masonry Wall Design, in Response to NRC 840224 Request.Final Response to Question 4 Will Be Provided by 8501031984-11-0202 November 1984 Forwards Addl Info Re IE Bulletin 80-11, Masonry Wall Design, in Response to NRC 840224 Request.Final Response to Question 4 Will Be Provided by 850103 Project stage: Other B11418, Forwards Response to 840224 Request for Addl Info on IE Bulletin 80-11 Re Masonry Wall Design.Complete Response to Question 4 Re Nonlinear Analysis Technique Provided1985-01-0404 January 1985 Forwards Response to 840224 Request for Addl Info on IE Bulletin 80-11 Re Masonry Wall Design.Complete Response to Question 4 Re Nonlinear Analysis Technique Provided Project stage: Request ML20115A5191985-03-22022 March 1985 Masonry Wall Design for Millstone Point Unit 2, Technical Evaluation Rept Project stage: Other 1983-01-25 |
| ML20263C301 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Haddam Neck, 05000000 |
| Issue date: | 09/25/1981 |
| From: | NORTHEAST UTILITIES SERVICE CO. |
| To: | |
| Shared Package | |
| ML20064D019 | List: |
| References | |
| REF-SSINS-6820, REF-SSINS-SSINS-6 25202-54064, IEB-80-11, TAC-42894, NUDOCS 8301040604 | |
| Download: ML20263C301 (1) | |