The following pages link to TXX-6435, Discusses Completion Dates for Corrective Actions Re Several Items Reported Prior to Jul 1986 Per 10CFR50.55(e).Info Re Completion Dates for Encl List of Deficiencies Will Be Submitted When Available:
Displayed 2 items.
- ML20214A072 (redirect page) (← links)
- TXX-6435 (redirect page) (← links)
- IR 05000445/1987036 (← links)
- TXX-6673, Supplemental Deficiency Rept CP-85-11 Re Drawing Requirement That No Tube Fittings Be Installed Between Two 45 Degree Bends in Instrumentation Tubing.Initially Reported on 850410.Installations Will Be Reinspected (← links)
- TXX-6713, Final Supplemental Deficiency Rept CP-85-40 Re Adequacy of Flux Mapping Seal (Fms) Table Restraints Under Seismic Loads.Initially Reported on 851126.Unit 1 Fms Mods Complete. Unit 2 Mods Scheduled for Completion by 880515 (← links)
- TXX-6711, Supplemental Final Deficiency Rept CP-80-09 Re Component Supports of Diesel Generator Auxiliary Piping Sys.Initially Reported on 810729.All Rework of Train Diesel Generator Pipe Supports for Both Units Completed (← links)
- TXX-6661, Final Deficiency Rept CP-84-28 Re Rosemount Transmitters W/Leakage Path Between Sensor Module & Housing.Initially Reported on 841119.Affected Transmitters Repaired,Reworked & Reinstalled.Supporting Documentation Available at Site (← links)
- TXX-6584, Supplemental Part 21 & Deficiency Rept CP-84-08 Re Curtain Fire Dampers Installed W/O Specified Gap Between Moveable Curtains & Structure.Initially Reported on 840309.Essential Dampers Replaced to Meet Requirements.Next Rept by 880131 (← links)
- TXX-6668, Supplemental Deficiency Rept CP-82-07 Re Defective Governor Drive Couplings on Diesel Generators.Initially Reported on 820908.Complete Unit 2 Couplings Will Be Installed After Oil Flush & Turning of Engine.Next Rept by 871229 (← links)
- TXX-6922, Supplemental Deficiency Rept CP-82-09 Re Solid State Protection Sys Undetectable Failure.Initially Reported on 821130.Test Procedures Revised to Incorporate facility-specific Requirements Recommended by Westinghouse (← links)
- TXX-6828, Supplemental Deficiency Rept CP-85-13 Re Failures Existing in Esfas.Initially Reported on 850415.Rev of Test Procedures Not Required Due to Deficiency Resolved by Westinghouse Submittal of Hardware Mods.Circuit Installation Completed (← links)
- TXX-6831, Supplemental Final Deficiency Rept CP-85-14 Re Uninvolved Employee That Identified Unauthorized Repairs Made to Hanger.Initially Reported on 850419.Rework for Pipe Support Completed on 860113 & Cable Tray Supports on 860320 (← links)
- TXX-6660, Supplemental Deficiency Rept CP-82-06 Re Linear Indications Identified in Structural Steel Members of Emergency Diesel Generator Auxiliary Skid.Initially Reported on 840110.Train B Generator Skid Being Replaced.Final Rept by 871118 (← links)
- TXX-6526, Interim Deficiency Rept CP-83-08 Re Control Valve Brackets. Initially Reported on 830324.Reevaluation of Commitment to Replace Brackets Underway.Next Rept Expected by 880114 (← links)
- TXX-6657, Supplemental Deficiency Rept CP-82-15 Re Defective Piston Skirt Castings on Diesel Generators.Initially Reported on 840130.Skirt Castings in Process of Being Replaced. Completion Expected by 880331 (← links)
- TXX-6435, Discusses Completion Dates for Corrective Actions Re Several Items Reported Prior to Jul 1986 Per 10CFR50.55(e).Info Re Completion Dates for Encl List of Deficiencies Will Be Submitted When Available (← links)
- TXX-8876, Supplemental Deficiency Rept CP-85-12 Re Auxiliary Feedwater Pressure Control.Initially Reported on 850415.Safety-related Air Supply to Min Flow Recirculation Line Control Valve Added on to Each Motor Driven Auxiliary Feedwater Pump (← links)
- TXX-8843, Supplemental Deficiency Rept CP-85-027 Re Seismic Category I Bldgs.Initially Reported on 851217.Debris Removal & Actual Widening of Gap.Corrective Actions for Unit 1 Currently Scheduled for Completion by 881001 & for Unit 2 by 900101 (← links)
- TXX-8852, Supplemental Deficiency Rept CP-85-49 Re Unevaluated Fluid Transient in Steam Supply Line for Turbine Driven Auxiliary Feedwater Pump (Tdafp).Initially Reported on 851220.TDAFP Will Be Tested W/Revised Piping Configuration (← links)
- TXX-8811, Final Deficiency Rept CP-87-133 Re High Energy Line Break Analysis.Initially Reported on 871218.Mods Required Will Be Identified & Scheduled for Implementation in General Const Schedule by 880811 (← links)
- TXX-8836, Supplemental Deficiency Rept CP-84-29 Re Safe Shutdown Analysis Evaluations.Initially Reported on 841105. Installation of 1-hr Fire Barrier Matl Being Accomplished Per Drawing ECE-M1-1700.Completion Expected by 881001 (← links)