Pages that link to "Stamp B"
← Stamp B
The following pages link to Stamp B:
Displaying 39 items.
- ML13071A479 (← links)
- ML14296A775 (← links)
- ML13191A875 (← links)
- L-2018-024, Turkey Point, Units 3 and 4 - Submittal of Summary of Changes to Radiological Emergency Plan Revision 63 (← links)
- ML18242A466 (← links)
- ML18043A167 (← links)
- L-2017-090, LER Special Report Regarding Accident Monitoring Instrumentation (← links)
- L-2019-016, 2018 Annual Report of Reactor Coolant Specific Activity Limits (← links)
- L-2019-017, Submittal of 2018 Annual Radioactive Effluent Release Report (← links)
- L-2019-053, License Amendment Request 269, Modify Reactor Trip System (RTS) Turbine Trip Instrumentation Requirements and Resolve Two Non-Conservative Requirements (← links)
- L-2019-135, Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications (← links)
- L-2019-163, Supplement to License Amendment Request 258, Revise Reactor Core Safety Limit to Reflect WCAP-17642-PA Revision 1 (← links)
- L-2018-024, Submittal of Summary of Changes to Radiological Emergency Plan Revision 63 (← links)
- ML18242A503 (← links)
- L-2019-188, CFR 50.59(d)(2) Summary Report of Changes, Test and Experiments October 29, 2017 to April 11, 2019 (← links)
- L-2019-192, License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements (← links)
- L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification (← links)
- L-2020-003, License Amendment Request 268, Request to Extend Containment Leakage Rate Test Frequency (← links)
- L-2020-033, 2019 Annual Report of Reactor Coolant Specific Activity Limits (← links)
- L-2020-064, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information (← links)
- ML20098F341 (← links)
- L-2020-053, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program (← links)
- L-2020-071, Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements (← links)
- L-2020-083, Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re (← links)
- L-2020-084, Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic (← links)
- ML20137R435 (← links)
- L-2020-106, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic (← links)
- L-2020-081, Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor (← links)
- ML20137R416 (← links)
- L-2020-032, 2019 Annual Radioactive Effluent Release Report (← links)
- 05000251/LER-2020-001, Automatic Reactor Trip Caused by Main Generator Lockout Due to Exciter Fault (← links)
- 05000250/LER-2020-001, Technical Specification Action Not Taken for Unrecognized Inoperable Reactor Protection System (RPS) and Engineered Safety Feature Actuation System (ESFAS) Instrument Channel Functional Units (← links)
- L-2019-203, License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors (← links)
- L-2019-189, Florida Power & Light Company (FPL) - Summary Report of Changes, Tests and Experiments for the Turkey Point Nuclear Plant Independent Spent Fuel Storage Installation (ISFSI) (← links)
- L-2019-127, Manual Reactor Trip Following Grid Disturbance (← links)
- L-2019-108, Preparation and Scheduling of Operator Licensing Examinations (← links)
- 05000250/LER-2018-001, Inoperable Containment Purge Exhaust Penetration (← links)
- 05000250/LER-2018-002, As-Found Cycle 29 Main Steam Safety Valve Setpoints Outside Technical Specification Limits (← links)
- 05000251/LER-2018-001, Inoperable Auxiliary Feedwater Steam Supply Flowpath (← links)