Pages that link to "SR-4.3.1.2"
Jump to navigation
Jump to search
The following pages link to SR-4.3.1.2:
Displayed 50 items.
- 05000443/FIN-2014003-03 (← links)
- 05000443/FIN-2012005-03 (← links)
- IR 05000443/2014003 (← links)
- IR 05000443/2012005 (← links)
- ML15265A224 (← links)
- LR-N15-0178, Hope Creek - License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System Upgrade (← links)
- L-2017-002, License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 (← links)
- ML052270429 (← links)
- ML050550300 (← links)
- ML041540457 (← links)
- ML20065J082 (← links)
- HNP-03-006, Request for License Amendment - Response Time Testing Elimination Supplemental Information (← links)
- HNP-02-162, Request for License Amendment, Response Time Testing Elimination Supplemental Data, Additional Information (← links)
- HNP-02-141, Request for License Amendment - Response Time Testing Elimination Supplemental Information (← links)
- HNP-02-113, Request for License Amendment, Response Time Testing Elimination (← links)
- ML20058H222 (← links)
- W3F1-2020-0017, Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification (← links)
- ML021120232 (← links)
- ML020580696 (← links)
- ML20087E831 (← links)
- ML20086K510 (← links)
- ML20073C325 (← links)
- ML20073C318 (← links)
- ML20073C313 (← links)
- ML20104A434 (← links)
- ML20097F915 (← links)
- NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals (← links)
- ML20107F054 (← links)
- ML20072F366 (← links)
- ML20127J292 (← links)
- ML20153E874 (← links)
- ML20203C527 (← links)
- NRC-98-0040, Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 (← links)
- ML20217N605 (← links)
- ML21350A426 (← links)
- L-2022-000, License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response (← links)
- ML22041A010 (← links)
- ML22160A365 (← links)
- ML22242A002 (← links)
- JSP-609-91, Application for Amend to License NPF-62,changing Tech Specs to Incorporate reliability-based Improvements to Instrumentation Action Statements & Surveillance Test Intervals Per BWR Owners Group Topical Repts (← links)
- U-602297, Application for Amend to License NPF-62,proposing Changes to Ts,Eliminating Requirement to Perform Manual Testing of solid-state Logic Independently from self-test Sys (← links)
- RBG-39894, Application for Amend to License NPF-47,revising TS for Removal of Component Lists,Per Generic Ltrs 91-01 & 91-08 (← links)
- PY-CEI-NRR-2013, Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 (← links)
- PY-CEI-NRR-1890, Application for Amend to License NPF-58 Re one-time Extension of Performance Intervals for Certain TS Surveillance Requirements (← links)
- LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle (← links)
- 05000424/LER-1987-082, :on 871017,insp of Breaker Installed in Main Reactor Trip Breaker Cubicle B Indicated That Weld on Breaker Pole Shaft Lacked Proper Fusion.Caused by Procedural Inadequacy.Procedure Revised Re Response Time (← links)
- ML20246N432 (← links)
- ML20245F251 (← links)
- ML20237D149 (← links)
- ML20236R142 (← links)