Pages that link to "RS-19-088, Response to Request for Additional Information Regarding Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed..."
Jump to navigation
Jump to search
The following pages link to RS-19-088, Response to Request for Additional Information Regarding Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed...:
Displayed 50 items.
- ML17178A076 (← links)
- RS-18-095, Response to Request for Additional Information Regarding Braidwood Station Fourth Lnservice Inspection Interval Relief Request 14R-03 (← links)
- RS-18-094, Response to Request for Additional Information Regarding Braidwood Station Fourth Lnservice Inspection Interval Relief Request 14R-06 (← links)
- RS-17-084, Response to Request for Additional Information for Byron Station and Braidwood Station Post Peening Relief Requests (← links)
- RS-16-175, High Frequency Supplement to Seismic Hazard Screening Report,Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 the Near Term-Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- RS-18-041, Response to Request for Additional Information Regarding Request for Relief (I4R-07) for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened ... (← links)
- RS-16-231, Revised Response to Request for Additional Information for License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-172, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪Sse with High Frequency Exceedances (← links)
- RS-16-222, Response to Request for Additional Information Related to License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-218, Response to Request for Additional Information License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-085, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪Sse with High Frequency Exceedances (← links)
- RS-16-083, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- NL-16-014, Response to Request for Additional Information Regarding IP2-ISI-RR-19 for Relief from System Test Requirements for Large Bore(≫ 1 Inch), ASME Code Class 1 Reactor Coolant Pressure Boundary (Rcpb), Process, Drain, Test, And.. (← links)
- BYRON 2015-0084, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report for Refueling Outage 18 (← links)
- RS-18-083, Response to Request for Additional Information Regarding Braidwood Station Fourth Inservice Inspection Interval Relief Request 14R-05 (← links)
- RS-17-091, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-17-093, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-17-036, Response to Request for Additional Information Regarding Relief Request I4R-10 (← links)
- RS-16-259, Response to Request for Additional Information for Relief Request I4R-10: Proposed Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval (← links)
- RS-16-171, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ 2xSSE with High Frequency Exceedances (← links)
- RS-16-213, Response to Request for Additional Information Regarding Relief Request 13R-17 to Extend the Reactor Pressure Vessel Inservice Inspection Interval (← links)
- RS-16-169, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (Partial Submittal - High Frequency Work Scope) (← links)
- RS-16-168, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- RS-16-195, Supplemental Information for the Fourth Inservice Inspection Interval Relief Request 14R-08 (← links)
- RS-16-122, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident (← links)
- RS-16-086, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- RS-16-112, Response to Request for Additional Information Regarding Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. (← links)
- RS-15-329, Response to Request for Additional Information Regarding Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. (← links)
- RS-15-319, Responds to Request for Additional Information Regarding Relief Request RP-1 Associated with the Fourth Inservice Testing Interval (← links)
- RS-15-282, Response to Request for Additional Information Regarding Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. (← links)
- RS-15-266, Response to Request for Additional Information Regarding Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. (← links)
- RS-18-099, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS ≫ 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- RS-17-138, Stations - Response to Request for Additional Information Related to License Amendment Request to Incorporate Changes Supported by TSTF-547, Clarification of Rod Position Requirements' (← links)
- RS-17-085, Response to Request for Additional Information Regarding Amendments to Remove Obsolete License and Technical Specification Items (← links)
- RS-16-079, Response to Request for Additional Information Regarding the Request for Exemption from 10 CFR 50.55a, Codes and Standards, Paragraph (h)(2), Protection Systems, Including Change to Request NRC Approval Under 10 CFR 50.55a.. (← links)
- RS-16-078, Clarification to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds (← links)
- RS-16-067, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds (← links)
- RS-16-045, Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds (← links)
- RS-16-039, Response to Request for Additional Information Regarding the Request for Exemption from 10 CFR 50.55a, Codes and Standards, Paragraph (h)(2), Protection Systems. (← links)
- RS-15-264, Response to Request for Additional Information Regarding the License Amendment Request to Install New Low Degraded Voltage Relays and Timers on the 4.16 Kv Engineered Safety Features (ESF) Buses (← links)
- RS-15-251, Response to Request for Additional Information Follow-Up Clarification Regarding License Amendment Request for Diesel Generator Load Rejection Surveillance Requirement (← links)
- RS-15-181, Response to Request for Additional Information Regarding License Amendment Request for Diesel Generator Load Rejection Surveillance Requirement (← links)
- RS-18-072, Response to Request for Additional Information Regarding 50.69 Amendment (← links)
- RS-17-092, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-16-170, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (Partial Submittal - High Frequency Work Scope) (← links)
- L-2019-071, Response to Request for Additional Information (RAI} Set 10 Subsequent License Renewal Application Safety Review Requests (← links)
- RS-19-051, Response to Request for Additional Information for the License Amendment Request to Utilize Tvel TVS-K Lead Test Assemblies (← links)
- RS-18-084, Response to Request for Additional Information Regarding Braidwood TORMIS Amendment Request (← links)
- RS-17-032, Response to Request for Additional Information Regarding the License Amendment Request to Utilize the TORMIS Computer Code Methodology (← links)
- RS-19-088 (redirect page) (← links)