Pages that link to "RC-17-0135, Annual Commitment Change Summary Report"
Jump to navigation
Jump to search
The following pages link to RC-17-0135, Annual Commitment Change Summary Report:
Displayed 50 items.
- ML17310B068 (redirect page) (← links)
- RC-17-0135, V.C. Summer, Unit 1 - Annual Commitment Change Summary Report (redirect page) (← links)
- RC-17-0135 (redirect page) (← links)
- RC-17-0009, VC Summer Nuclear Station - Cancellation of Licensee Event Report (LER) 2016-005-00 Steam Propagation Barrier Degraded Due to Removal of Ventilation Duct Access Panel for Surveillance Activities (← links)
- RC-16-0147, VC Summer Nuclear Station, Unit 1, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Pursuant to Title 10 9f the Code of Federal Regulations 05.54(f) (← links)
- RC-15-0076, VC Summer 2015-301 Initial Exam Post Exam Comments (← links)
- RC-15-0055, V.C. Summer, Report of Status of Decommissioning Funding (← links)
- RC-14-0135, V. C. Summer Unit 1, Request for Information for NRC Problem Identification and Resolution Inspection (← links)
- RC-14-0084, Special Report 2014-003 for V.C. Summer, One or More Required Meteorological Monitoring Channels Being Inoperable for More than Seven (7) Days (← links)
- RC-14-0085, Special Report 2014-002 for V.C. Summer, Degraded Conditions Lasting Longer than Seven Days (← links)
- RC-14-0045, Guarantee of Payment of Deferred Premiums Annual 10 CFR 140.21(E) Report for Virgil C. Summer Nuclear Station (Vcsns), Unit 1 (← links)
- RC-14-0014, V. C. Summer, Unit 1, Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns (← links)
- RC-13-0170, Virgil S. Summer Nuclear Station (Vcsns), Unit 1, 10 CFR 50.59 Biennial Report (← links)
- RC-13-0136, Virgil C Summer, Unit 1 - NRC Request for Information Aircraft Impact Inspection and Request for Information (← links)
- RC-13-0037, Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years (← links)
- RC-12-0132, V. C. Summer, Unit 1, South Carolina Electric & Gas (SCE & G) Response to Request for Additional Information License Amendment Request - LAR 10-093912, Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (← links)
- RC-12-0110, Virgil C. Summer Nuclear Station Unit 1 - Request for Weld Recategorization and Use of Alternatives to ASME Code Inspection Interval for VCSNS Third Ten Year Inservice Inspection (RR-III-08) (← links)
- RC-11-0062, V. C. Summer, License Amendment Request - LAR 04-02961, License Amendment Request for Slave Relay Surveillance Testing (← links)
- RC-10-0002, Virgil C. Summer, Unit 1 - Supplemental Response to Request for Additional Information for License Amendment Request-LAR-04-02911(Alternative Source Term) (← links)
- RC-09-0159, Virgil C. Summer Nuclear Station, Unit 1 - Response to Request for Additional Information for License Amendment Request - LAR-04-02911 (Alternative Source Team) (← links)
- RC-09-0072, Virgil C. Summer, Unit 1, Submittal of Supplement Information to License Amendment Request LAR 04-02911 and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67 (← links)
- RC-09-0033, Virgil C Summer Nuclear Station - Guarantee of Payment of Deferred Premium Annual 10CFR140.21(e) Report (← links)
- RC-08-0043, V. C. Summer, Unit 1 - Transmittal of the 2007 Annual Operating Report (← links)
- RC-07-0169, Virgil Summer - 10 CFR 50.59 Biennial Report Covering the Period from October 1, 2005 Until October 1, 2007 (← links)
- RC-07-0074, V. C. Summer - Ninety-Day Response to GL 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. (← links)
- RC-07-0043, V.C. Summer Report of Status of Decommissioning Funding (RR-1950) (← links)
- RC-06-0202, V. C. Summer - ECCS Evaluation Model Revisions Report, Addresses the Effect of Using a Finer Break Spectrum (← links)
- RC-06-0173, V. C. Summer - LAR 05-2926, Implementation of WCAP-14333-P-A, Rev. 1, Probabilistic Risk Analysis of RPS and ESFAS Test Times and Completion Times - Summarized List of Commitments (← links)
- RC-05-0180, V. C. Summer License Amendment Request - LAR 05-3666, Alternate AC Power Supply Revision to Submitted Technical Specification Pages and Response to Verbal Request for Additional Information (← links)
- RC-06-0094, April 2006 Monthly Operating Report for Virgil C. Summer Nuclear Station (← links)
- RC-06-0073, March 2006 Monthly Operating Report for V.C. Summer Nuclear Station (← links)
- RC-01-0138, Transmittal of Revised Emergency Plan Procedures EPP-023, Rev. 12 & EPP-051, Rev. 6 for Virgil C. Summer Nuclear Station (← links)
- RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ (← links)
- RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error (← links)
- RC-16-0001, V.C. Summer, Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information (← links)
- RC-13-0123, V. C. Summer, Unit 1 - First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) (← links)
- RC-12-0153, South Carolina Electric & Gas (Sce&G) Company'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information (← links)
- RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error (← links)
- RC-17-0172, Notification of Personnel Changes (← links)
- RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds (← links)
- RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report (← links)
- RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 (← links)
- RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days (← links)
- RC-17-0106, Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 23 (← links)
- RC-17-0116, Special Report (Spr) 2017-009 Regarding Fire Barrier Assembly Not Being Restored to Operability within Seven Days After Declaration of Inoperability (← links)
- RC-17-0098, Completion of Expedited Seismic Evaluation Process Report Modifications (← links)
- RC-17-0093, License Amendment Request - LAR-15-01424 Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times, Response To. (← links)
- RC-17-0089, Focused Evaluation for External Flooding (← links)
- RC-17-0088, Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times - Response to Request for Additional Information (← links)