Pages that link to "Pierce C R"
Jump to navigation
Jump to search
The following pages link to Pierce C R:
Displayed 33 items.
- ML14038A019 (← links)
- NL-16-0466, Edwin I. Hatch Nuclear Plant - Unit 1 Cycle 28 Core Operating Limits Report Version 1 (← links)
- NL-15-1898, Southern Nuclear Operating Co, License Amendment Request for Changes to Emergency Action Level Schemes to Adopt NEI 99-01, Rev. 6, and to Modify Radiation Monitors at Farley Nuclear Plant (← links)
- NL-16-0169, Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes Encl (← links)
- NL-15-0581, Vogtle, Units 1 and 2 - Transmittal of Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) (← links)
- NL-14-1075, E.I. Hatch, Units 1 and 2 - Technical Specifications. Part 3 of 4 (← links)
- NL-14-1075, E.I. Hatch, Units 1 and 2 - Technical Specifications. Part 2 of 4 (← links)
- NL-15-2034, E.I. Hatch, Units 1 and 2 - Response to Request for Additional Information Regarding Application for Amendment to Technical Specifications for Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Repo (← links)
- NL-15-1904, Vogtle, Units 1 and 2 - Supporting Documents for Upcoming SNC NRC Public Meeting Regarding the Resolution of GS1-191 (← links)
- NL-15-1535, Edwin I. Hatch, Unit 1 - License Amendment Request Concerning Safety Limit Minimum Critical Power Ratio (← links)
- NL-15-1392, Joseph M. Farley Nuclear Plant Units 1 and 2; Edwin I. Hatch Nuclear Plant Units 1 and 2; Vogtle Electric Generating Plant Units 1 and 2; Vogtle Electric Generating Plant Units 3 and 4 Standard Emergency Plan (← links)
- NL-15-1569, Vogtle Electric Generating Plant Units 1 & 2, Changes to Emergency Plan and ERDS Data Point Library (← links)
- NL-15-0577, Edwin I. Hatch, Units 1 and 2 - Transmittal of Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) (← links)
- NL-15-0803, J. M. Farley, E. I. Hatch and Vogtle - Submittal of Annual Radioactive Effluent Release Reports for 2014 (← links)
- NL-15-0520, Edwin I. Hatch, Unit 2 - VSP-SNC-HV1-15-013, Cycle 24 Core Operating Limits Report, Version 1, Enclosure 9 (← links)
- NL-15-0520, Edwin I. Hatch, Unit 2 - VSP-SNC-GEN-15-002, Cycle 23 Core Operating Limits Report, Version 2, Non-Proprietary, Enclosure 6 (← links)
- NL-15-0520, Edwin I. Hatch, Unit 1 - VSP-SNC-GEN-15-002, Cycle 27 Core Operating Limits Report, Version 2, Non-Proprietary, Enclosure 3 (← links)
- NL-15-0520, Edwin I. Hatch, Units 1 and 2 - Core Operating Limits Reports (Colrs) and Information Letter of Nfs Lead Test Assemblies (← links)
- NL-14-1385, Joseph M. Farley Nuclear Plant - Units 1 and 2 - Request for Technical Specification Amendment Adoption of Previously NRC-Approved Generic Technical Specification Changes and Other Changes (← links)
- NL-14-0753, Vogtle, Unit 1 - Cycle 19 Core Operating Limits Report (← links)
- NL-14-0659, Edwin I. Hatch, Units 1 & 2, Joseph M. Farley, Units 1 & 2, Vogtle, Units 1 & 2, Southern Nuclear Operating Company'S Submittal of Annual Radioactive Effluent Release Reports and Offsite Dose Calculation Manuals for 2013 (← links)
- NL-14-0383, Hatch, Unit 1, Cycle 27 Core Operating Limits Report, Information Letter on Nsf Channel Lead Test Assemblies (Ltas), and Information Letter on GNF-Ziron Cladding Material and Water Rod Material LTAs (← links)
- NL-14-0249, Joseph M. Farley, Unit 1, Updated Seismic Recommendation 2.3 Walkdown Report (← links)
- NL-14-0249, Joseph M. Farley Nuclear Plant, Unit 1 - Updated Seismic Recommendation 2.3 Walkdown Report (← links)
- NL-13-2521, Edwin I. Hatch, Units 1 and 2, ISI Program Alternative HNP-ISI-ALT-18, Version 1 (← links)
- NL-13-1555, Joseph M. Farley Unit 2, Updated Seismic Recommendation 2.3 Walkdown Report Requested by NRC Letter, Request for Information Re Recommendations 2.1, 2.3 & 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai Ichi Accident (← links)
- NL-13-1601, Joseph M. Farley, Units 1 and 2, Evacuation Time Estimate Update (← links)
- NL-13-1605, Vogtle, Units 1 and 2, Evacuation Time Estimate Update (← links)
- NL-13-1236, Vogtle, Unit 2 - Updated Seismic Recommendation 2.3 Walkdown Report Requested by NRC, Including SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. (← links)
- NL-13-1257, Farley, Units 1 and 2 - Southern Nuclear Operating Company Response to Request for Additional Information Regarding the Revision of the Condensate Storage Tank Level (← links)
- NL-16-0388, Draft License Amendment Request Regarding Alternative Source Team (← links)
- NL-16-2494, Edwin I. Hatch Nuclear Plant- Units 1 and 2 - Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights (← links)
- NL-14-1349, Edwin I. Hatch Nuclear Plant Units 1 and 2 License Amendment Request to Revise Technical Specifications Regarding Generic Letter 2008-01, Managing Gas Accumulation in Accordance with TSTF-523, Revision 2, Using the Consolidated Line Item (← links)