NL-15-0520, Edwin I. Hatch, Unit 2 - VSP-SNC-HV1-15-013, Cycle 24 Core Operating Limits Report, Version 1, Enclosure 9

From kanterella
Jump to navigation Jump to search
Edwin I. Hatch, Unit 2 - VSP-SNC-HV1-15-013, Cycle 24 Core Operating Limits Report, Version 1, Enclosure 9
ML15078A233
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/13/2015
From: Pierce C R
Southern Co, Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15078A228 List:
References
NL-15-0520 VSP-SNC-HV1-15-013
Download: ML15078A233 (49)


Text

{{#Wiki_filter:Edwin I. Hatch Nuclear Plant Unit 1 Cycle 27 Core Operating Limits Report Version 2 Unit 2 Cycle 23 Core Operating Limits Report Version 2 Unit 2 Cycle 24 Core Operating Limits Report Version 1 Information Letter of NSF Lead Test Assemblies Enclosure 9 HNP Unit 2 Cycle 24 Version 1 Core Operating Limits Report NON-PROPRIETARY INFORMATION ENCLOSURE 2 VSP-SNC-HV1-15-013 Edwin I. Hatch Nuclear Plant Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information INFORMATION NOTICE This is a non-proprietary version of Enclosure I of VSP-SNC-HVI-15-013, which has the proprietary information removed. Portions of the document that have been removed are indicated by white space inside open and closed bracket as shown here [[ I]. SOUTHERN NUCLEAR OPERATING COMPANY EDWIN I. HATCH NUCLEAR PLANT Unit 2 Cycle 24 CORE OPERATING LIMITS REPORT Version 1 Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35201 Non-Proprietary Information Non-Proprietary Information Edwin I. Hatch Nuclear Plant Unit 2 Cycle 24 Core Operating Limits Report TABLE OF CONTENTS Section Title Page 1.0 Introduction 1 2.0 APLHGR Limits 3 3.0 MCPR Operating Limits 7 4.0 LHGR Limits 29 5.0 PBDA Amplitude Setpoint 38 6.0 References 39 Non-Proprietary Information Plant Hatch Core Operating Unit 2 Cycle 24 Non-Proprietary Information Limits Report TABLES Table No. Title Page 1-1 Main Turbine Bypass System Operability 1 1-2 Equipment-Out-of-Service Limitations 2 3-1 Exposure Definitions 9 3-2 Flow-Dependent MCPR Operating Flexibility Options 10 3-3 Power-Dependent MCPR Operating Flexibility Options 10 3-4 Power-Dependent Multiplier Flexibility Options 10 3-5 Rated-Power MCPR Operating Flexibility Options 11 3-6A TLO MCPR Limits for Main Turbine Pressure 12 Regulator System Status in TLCO 3.3.13.c 3-6B SLO MCPR Limits for Main Turbine Pressure 12 Regulator System Status in TLCO 3.3.13.c 4-1 LHGR Limits versus Peak Pellet Exposure 29 4-2 Flow-Dependent LHGR Operating Flexibility Options 30 4-3 Power-Dependent LHGR Operating Flexibility Options 30 5-1 OPRM Setpoint 38 ii Version 1 Plant Hatch Core Operating Unit 2 Cycle 24 Non-Proprietary Information Limits Report FIGURES Figure No. Title Page 2-1A GE14C Flow-Dependent APLHGR 4 Multiplier (MAPFACF) versus Core Flow 2-1B GNF2 Flow-Dependent APLHGR 5 Multiplier (MAPFACF) versus Core Flow 2-2 APLHGR Limit versus Average Planar 6 Exposure 3-1 Flow-Dependent MCPR Limit (MCPRF) 13 versus Core Flow 3-2A Power-Dependent MCPR Limit (MCPRp) 14 versus Core Power from 24% to 45% of Rated Core Power 3-2B Power-Dependent MCPR Limit (MCPRp) 15 versus Core Power from 24% to 45% of Rated Core Power (Main Turbine Bypass System Inoperable and/or Main Turbine Pressure Regulator System in TLCO 3.3.13.c)3-3A Power-Dependent MCPR Multiplier (Kp) 16 versus Core Power 3-3B Power-Dependent MCPR Multiplier (Kp) 17 versus Core Power (High Pressure Feedwater Heaters Out of Service)3-3C Power-Dependent MCPR Multiplier (Kp) 18 versus Core Power (Main Turbine Pressure Regulator System in TLCO 3.3.13.c)3-4A-1 TLO MCPR Limits versus Average Scram 19 Time 3-4A-2 TLO MCPR Limits versus Average Scram 20 Time (EOC-RPT Out of Service)iii Version 1 Plant Hatch Core Operating Unit 2 Cycle 24 Non-Proprietary Information Limits Report Figure No. Title Page 3-4A-3 TLO MCPR Limits versus Average Scram 21 Time (Main Turbine Bypass System Inoperable) 3-4A-4 TLO MCPR Limits versus Average Scram 22 Time (EOC-RPT Out of Service and Main Turbine Bypass System Inoperable) 3-4A-5 TLO MCPR Limits versus Average Scram 23 Time (Main Turbine Pressure Regulator System in TLCO 3.3.13.c)3-4B-1 SLO MCPR Limits versus Average Scram 24 Time 3-4B-2 SLO MCPR Limits versus Average Scram 25 Time (EOC-RPT Out of Service)3-4B-3 SLO MCPR Limits versus Average Scram 26 Time (Main Turbine Bypass System Inoperable) 3-4B-4 SLO MCPR Limits versus Average Scram 27 Time (EOC-RPT Out of Service and Main Turbine Bypass System Inoperable) 3-4B-5 SLO MCPR Limits versus Average Scram 28 Time (Main Turbine Pressure Regulator System in TLCO 3.3.13.c)4-1A GE14C Flow-Dependent LHGR Multiplier 31 (LHGRFACF) versus Core Flow 4-1B GNF2 Flow-Dependent LHGR Multiplier 32 (LHGRFACF) versus Core Flow 4-1C GNF2 Flow-Dependent LHGR Multiplier 33 (LHGRFACF) versus Core Flow (Main Turbine Bypass System Inoperable) 4-2A Power-Dependent LHGR Multiplier 34 (LHGRFACp) versus Core Power iv Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information Figure No.4-2B Title Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power (High Pressure Feedwater Heaters Out of Service)GE14C LHGR versus Peak Pellet Exposure GNF2 LHGR versus Peak Pellet Exposure 35 4-3A 4-3B 36 37 V Version 1 Non-Proprietary Information Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information

1.0 INTRODUCTION

The Core Operating Limits Report (COLR) for Plant Hatch Unit 2 Cycle 24 is prepared in accordance with the requirements of Technical Specification 5.6.5. The core operating limits presented herein were developed using NRC-approved methods (References 1 through 6). Results from the reload analyses for the fuel in Unit 2 Cycle 24 are documented in References 3 through 5.The following core operating limits are included in this report: a. Average Planar Linear Heat Generation Rate (APLHGR) -Technical Specification 3.2.1 b. Minimum Critical Power Ratio (MCPR) -Technical Specification 3.2.2 c. Linear Heat Generation Rate (LHGR) -Technical Specification 3.2.3 Also included in this report is the maximum allowable scram setpoint for the Period Based Detection Algorithm (PBDA) in the Oscillation Power Range Monitor (OPRM).Based upon the reload analysis for this cycle, the following operability requirement is defined for Unit 2 operation. TABLE 1-1 Main Turbine Bypass System Operability System Operability Requirement Main Turbine Bypass System Operable At least two bypass valves must be (Technical Specification 3.7.7) operable-1 I 1 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information From a fuel thermal limits perspective, the following limitations are placed on Unit 2 operation. TABLE 1-2 Equipment-Out-of-Service Limitations Equipment I Condition Limitation e CTP must be _ 2000 MWth Single-Loop Operation (SLO)

  • Core Flow must be < 56% of Rated High Pressure Feedwater Heaters Out of Service No Core Operating Limits available and Main Turbine Pressure Regulator System in (Technical Specifications RAS TLCO 3.3.13.c simultaneously 3.2.2. and 3.2.3 must be entered)2 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 2.0 APLHGR LIMITS (Technical Specification 3.2.1)For both two loop operation (TLO) and single loop operation (SLO), the APLHGR limit for each six inch axial segment of each fuel assembly in the core is the applicable fuel-type-specific APLHGR limit in Figure 2-2 multiplied by the fuel-type-specific flow-dependent multiplier, MAPFACF, taken from either: a. Figure 2-1A for GE14C fuel OR b. Figure 2-11B for GNF2 fuel.3 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 1.0 U-0.AD 0.9 0.86-J 0.6 I,.-J 0.6 0 0._M 0.5 0.4 110 Core Flow (%of Rated)Operating Conditions F SLO / TLO MAPFACF 30:_< F 61 TLO 0.86 61 <F TLO 1.00 30 _ F SLO 0.80 F = Percent of Rated Core Flow FIGURE 2-1A GE14C Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 4 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 1.0 0.LL'0 0.9 M 0.8 0.7 C* 0.6 a.0 C 0.5 0.4 FT LO_4 4 4 4 4 4 4-I-I-i-I-I-i-I-SLO 30 40 50 60 70 80 90 100 110 Core Flow (%of Rated)Operating Conditions F SLO / TLO MAPFACF 30_<F TLO 1.00 305 F SLO 0.80 F = Percent of Rated Core Flow FIGURE 2-1B GNF2 Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 5 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information Average GE14C Planar APLHGR Exposure Limit (GWd/ST) (kW/ft)0.00 12.82 14.51 12.82 19.13 12.82 57.61 8.00 63.50 5.00 Average GNF2 Planar APLHGR Exposure Limit (GWd/ST) (kW/ft)0.00 13.78 17.15 13.78 60.78 6.87 63.50 5.50 14.0 13.0 12.0 11.0 10.0 9.0 8.0 7.0 6.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0 70 Average Planar Exposure (GWd/ST)5.0 4.0.0 FIGURE 2-2 APLHGR Limit versus Average Planar Exposure 6 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 3.0 MCPR OPERATING LIMITS (Technical Specification 3.2.2)The MCPR operating limits (OLMCPR) for each fuel type are a function of core power, core flow, average scram time, number of operating recirculation loops, EOC-RPT system status, operability of the main turbine bypass system, status of the high pressure feedwater heaters, the status of the main turbine pressure regulator system, and cycle exposure.

Cycle exposures are defined in Table 3-1.The OLMCPRs for both two loop operation (TLO) and single loop operation (SLO) are determined as follows: a. For 24% _< power < 45%, the greater of either: 1) The flow-dependent MCPR limit, MCPRF, as determined by Table 3-2, OR 2) The power-dependent MCPR limit, MCPRp, as determined by Table 3-3.b. For power _ 45%, the OLMCPRs are the greater of either: 1) MCPRF, as determined by Table 3-2, OR 2) The product of the power-dependent multiplier, Kp, as determined by Table 3-4, and the rated-power OLMCPR, as determined by Table 3-5.These limits apply to all modes of operation with feedwater temperature reduction, as well as operation with normal feedwater temperatures. In the 3-4A and 3-4B figures, Option A scram time OLMCPRs correspond to t = 1.0, where -c is determined from scram time measurements performed in accordance with Technical Specifications Surveillance Requirements 3.1.4.1 and 3.1.4.2. Option B values correspond to T = 0.0. For scram times between Option A and Option B, the rated-power OLMCPR corresponds to T. If T has not been determined, Option A limits must be used.7 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information The average scram time of the control rods, t, is defined as: Tave -TB= 0, OR , whichever is greater.TA -TB where: TA = 1.08 sec (Technical Specification 3.1.4, Table 3.1.4-1, scram time limit to notch 36).TB + ji1.65 -a1 where: jt = 0.822 sec (mean scram time used in the transient analysis). a = 0.018 sec (standard deviation of ji).N 1 = total number of active rods measured in Technical Specifications Surveillance Requirement 3.1.4.1.n = number of surveillance tests performed to date in the cycle.Ni = number of active control rods measured in the ith surveillance test.-1=1r Tave -wErN, i=1 where: Ti =average scram time to notch 36 of all rods in the ith surveillance test.8 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information TABLE 3-1 Exposure Definitions Exposure Label Cycle Exposure Definition BOC Beginning of Cycle 0 MWd/ST Exposure MOC1 First Middle of Cycle EOR -7945 MWd/ST Exposure MOC2 Second Middle of Cycle EOR -4945 MWd/ST Exposure Projected end of rated power with all control rods out at EOR End of Rated Exposure rated core flow and rated feedwater temperature EOC End of Cycle Exposure Exposure at cycle shutdown 9 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information TABLE 3-2 Flow-Dependent MCPR Operating Flexibility Options MCPRF Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine High Pressure Figure#System In Bypass System Pressure Regulator Feedwater Heaters Service Operable* System Status In Service Yes/No Yes/No TLCO 3.3.13.a or b Yes/No 3-1 Yes/No Yes/No TLCO 3.3.13.c Yes 3-1 Yes/No Yes/No TLCO 3.3.13.c No Not Licensed TABLE 3-3 Power-Dependent MCPR Operating Flexibility Options MCPRp from > 24% to < 45% Power Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine High Pressure Figure #System In Bypass System Pressure Regulator Feedwater Service Operable* System Status Heaters In Service Yes/No Yes TLCO 3.3.13.a or b Yes/No 3-2A Yes/No No TLCO 3.3.13.a or b Yes/No 3-28 Yes/No Yes/No TLCO 3.3.13.c Yes 3-28 Yes/No Yes/No TLCO 3.3.13.c No Not Licensed TABLE 3-4 Power-Dependent Multiplier Flexibility Options Kp for Power > 45% of Rated Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine High Pressure Figure #System In Bypass System Pressure Regulator Feedwater Heaters Service Operable* System Status In Service Yes/No Yes/No TLCO 3.3.13.a or b Yes 3-3A Yes/No Yes/No TLCO 3.3.13.a or b No 3-31 Yes/No Yes/No TLCO 3.3.13.c Yes 3-3C Yes/No Yes/No TLCO 3.3.13.c No Not Licensed* At least two bypass valves must be operable 10 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information TABLE 3-5 Rated-Power MCPR Operating Flexibility Options Rated-power OLMCPRs Equipment TLO SLO In/Out of Service Equipment In Service 1 Figure 3-4A-1 Figure 3-4B-1 EOC-RPT Out of Service 1 Figure 3-4A-2 Figure 3-4B-2 Main Turbine Bypass Figure 3-4A-3 Figure 3-4B-3 System Inoperable 1 EOC-RPT Out of Service &Main Turbine Bypass Figure 3-4A-4 Figure 3-4B-4 System Inoperable 1 Main Turbine Pressure Regulator System in TLCO Table 3-6A Table 3-6B 3.3.13. c 2 1. High Pressure Feedwater Heaters In or Out of Service 2. High Pressure Feedwater Heaters Out of Service in combination with Main Turbine Pressure Regulator system status in TLCO 3.3.13.c is not a licensed condition. 11 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information TABLE 3-6A TLO MCPR Limits for Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c Exposure Range Additional Equipment BOC -MOC1 MOC1 -MOC2 MOC2-EOC Out of Service / Inoperable None Figure 3-4A-5 Figure 3-4A-5 Figure 3-4A-5 EOC-RPT Out of Service Figure 3-4A-5 Figure 3-4A-5 Figure 3-4A-2 Main Turbine Bypass System Figure 3-4A-5 Figure 3-4A-5 Figure 3-4A-3 Inoperable EOC-RPT Out of Service & Main Turbine Bypass System Inoperable Figure 3-4A-5 Figure 3-4A-4 Figure 3-4A-4 TABLE 3-6B SLO MCPR Limits for Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c Y Exposure Range Additional Equipment BOC -MOC1 MOC1 -MOC2 MOC2 -EOC Out of Service / Inoperable None Figure 3-4B-5 Figure 3-48-5 Figure 3-4B-5 EOC-RPT Out of Service Figure 3-4B-5 Figure 3-4B-5 Figure 3-4B-2 Main Turbine Bypass System Figure 3-4B-5 Figure 3-4B-5 Figure 3-4B-3 Inoperable EOC-RPT Out of Service & Main Turbine Bypass System Inoperable Figure 3-48-5 Figure 3-48-4 Figure 3-4B-4 12 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information Q.-,m._J 0P 1.61 1.5 Maxim urn Flow 107%" 1.4 1.3 1.2 1.1 30 40 50 60 70 80 90 100 110 Core Flow (%of Rated)MCPRF(TLO) = A + B*F MCPRF(SLO) = MCPRF(TLO) + 0.03 Flow A B 30:5 F < 80 1.7294 -0.00598 805 F < 90 1.4830 -0.00290 90 < F 1.2220 0.00000 F = Percent of Rated Core Flow FIGURE 3-1 Flow-Dependent MCPR Limit (MCPRF) versus Core Flow 13 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 2.8 2.CL 2.4.E-J 2.2 IN 2.0 0 0.1.8 1.6 45 Core Power (% of Rated)MCPRp(TLO) = A + B*P MCPRp(SLO) = MCPRp(TLO) + 0.03 F P A B F5 <60 24 < P < 28 2.1900 0.00000 F > 60 24 _< P < 28 3.3900 -0.03000 All 28 _< P < 45 2.6671 -0.01882 P = Percent of Rated Core Power F = Percent of Rated Core Flow FIGURE 3-2A Power-Dependent MCPR Limit (MCPRp) versus Core Power from 24% to 45% of Rated Core Power 14 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 2.8 2.6 ZA 2.2 CL 2.2 IS 2.0")L 20.1.8 1.6 45 Core Power(% of Rated)MCPRp(TLO) = A + B*P MCPRp(SLO) = MCPRp(TLO) + 0.03 F P A B F -<60 24_< P < 28 3.1000 -0.03250 F > 60 24_ P < 28 3.3900 -0.03000 All 28 _< P < 45 2.6671 -0.01882 P = Percent of Rated Core Power F = Percent of Rated Core Flow FIGURE 3-2B Power-Dependent MCPR Limit (MCPRp) versus Core Power from 24% to 45% of Rated Core Power (Main Turbine Bypass System Inoperable and/or Main Turbine Pressure Regulator in TLCO 3.3.13.c)15 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 1.3 1.2 (D a)0.(L 1.0 45 50 55 60 65 70 75 80 85 90 95 100 Core Power(%of Rated)Kp A + B*P P A B 45 < P < 60 1.6700 -0.00867 60_< P < 85 1.3708 -0.00368 85< P 1.3870 -0.00387 P = Percent of Rated Core Power FIGURE 3-3A Power-Dependent MCPR Multiplier (Kp) versus Core Power 16 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 1.3* 1.2 o1.1 0 M-.45 50 55 60 65 70 75 80 85 90 95 100 Core Power(% of Rated)K-- A + B*P P A B 45 _ P < 60 1.6700 -0.00867 60!5 P < 85 1.3012 -0.00252 85 _ P 1.5800 -0.00580 P = Percent of Rated Core Power FIGURE 3-3B Power-Dependent MCPR Multiplier (Kp) versus Core Power (High Pressure Feedwater Heaters Out of Service)17 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 1.3=1.2 a.S CL 1.1 0 1.0 45 50 55 60 65 70 75 80 85 90 95 100 Core Power(% of Rated)Kp A + B*P P A B 45:_ P < 60 1.5320 -0.00560 60!5 P < 85 1.3808 -0.00308 85 P 1.3870 -0.00387 P = Percent of Rated Core Power FIGURE 3-3C Power-Dependent MCPR Multiplier (Kp) versus Core Power (Main Turbine Pressure Regulator System in TLCO 3.3.13.c)18 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information E_a-C-, 1 70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 E 1.52 1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 1.0 Exposure Range OLMCPR(TLO) t= 0.0 t= 1.0 BOC -MOCl 1.39 1.39 MOC1 -MOC2 1.39 1.48 MOC2 -EOC 1.43 1.54 FIGURE 3-4A-1 TLO MCPR Limits versus Average Scram Time 19 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 4 E n.1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1 1.52 I C.)1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Exposure Range OLMCPR(TLO) _ _ _=_0.0 _= 1.0 BOC -MOC1 1.39 1.44 MOC1 -MOC2 1.39 1.52 MOC2-EOC 1.47 1.60 FIGURE 3-4A-2 TLO MCPR Limits versus Average Scram Time (EOC-RPT Out of Service)20 Version 1 Plant Hatch Unit 2 Cycle 24 Core .Operating Limits Report Non-Proprietary Information 1.1.1.1.1.1.1.1.-J 0.C) 1 70 68 66 64 62 60.4. 4 *4* 4 .4.4 I t .4~ 4 4 4 + 4 4 .4 t 4-

  • 4 4 + 4 t I t 4. 4 ~4. t .4. 4 t I t 4 4. .4 4. .4 4 58 _______56 ____________

54 _______52 ______50 MC-O 48 ______46 ___________ 44 ______42 ______ ______40 ______ ______ ______38 o- o 36 _____ _____ _____1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 E 1.52 0.C.)1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Exposure Range OLMCPR(TLO) = 0.0 r=1.0 BOC -MOCl 1.39 1.39 MOC1 -MOC2 1.39 1.49 MOC2-EOC 1.44 1.55 FIGURE 3-4A-3 TLO MCPR Limits versus Average Scram Time (Main Turbine Bypass System Inoperable) 21 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information w E-J 0~0 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36_____MOC2 -EOC OCI Moc-Moc IIF---=---..- -MOC1 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 E 1.52 a.U 1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Exposure Range OLMCPR(TLO) T_= 0.0 _ _ _= 1.0 BOC -MOCi 1.39 1.48 MOC1 -MOC2 1.43 1.56 MOC2-EOC 1.50 1.64 FIGURE 3-4A-4 TLO MCPR Limits versus Average Scram Time (EOC-RPT Out of Service and Main Turbine Bypass System Inoperable) 22 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information E a.1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 Boc -EO 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 E 1.52 M (,)1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 4- + t + 4 + 4 +4- F + F + 4 + 4 +4- 1 .1- 4 + 4 .4- 4 4-0.0 0.1 .0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Exposure Range OLMCPR(TLO) BO-=C0.0 = 1.0 BOC -EOC 1.43 1.54 FIGURE 3-4A-5 TLO MCPR Limits versus Average Scram Time (Main Turbine Pressure Regulator System in TLCO 3.3.13.c)23 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information E a.1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1 1.46 MOC2-EOC .1.46 1.44 1.442" BOC -MOd1 1.42 _____1.40 1.38 1.36 1.70 1.68 1 66 1.64 1.62 1.60 1.58 1.56 1.54 -,J 1.52 a.1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Exposure Range OLMCPR(sLo) = 0.0 r=1.0 BOC -MOCl 1.45 1.45 MOC1 -MOC2 1.45 1.51 MOC2 -EOC 1.46 1.57 FIGURE 3-4B-1 SLO MCPR Limits versus Average Scram Time 24 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 1.70 I.E 1[. 1.1.70 1.68 1.66 1.64 1.62 1 60 1.56 1.56 1.54 E 1.52 w 1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 0.5 0.6 0.7 0.8 0.9 1.0'V Exposure Range OLMCPR(SLO) =_0.0 _ = 1.0 BOC -MOCl 1.45 1.47 MOC1 -MOC2 1.45 1.55 MOC2-EOC 1.50 1.63 FIGURE 3-4B-2 SLO MCPR Limits versus Average Scram Time (EOC-RPT Out of Service)25 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information C.)1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 E 1.52 cc 1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 Exposure Range OLMCPR(sLo) = 0.0 _ _ = 1.0 BOC -MOCi 1.45 1.45 MOC1 -MOC2 1.45 1.52 MOC2-EOC 1.47 1.58 FIGURE 3-4B-3 SLO MCPR Limits versus Average Scram Time (Main Turbine Bypass System Inoperable) 26 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 4 1 .1.1.58 1.56 1.54 .E 1.52 wl ()1.50 1.48 1.46 1.44 1.42 1.40 1.38 1.36 0.7 Exposure Range OLMCPR(sLo) _=0.0 = 1.0 BOC -MOC1 1.45 1.51 MOCI -MOC2 1.46 1.59 MOC2-EOC 1.53 1.67 FIGURE 3-4B-4 SLO MCPR Limits versus Average Scram Time (EOC-RPT Out of Service and Main Turbine Bypass System Inoperable) 27 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information E a-(-1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.50 ___1.48 _1.46 1.44 1.42 1.40 1.36 1.36 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.1.70 1.68 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 44 L)1.50 1.48 1.46 1.44 1.42 1.40 1.36 1.36 0 Exposure Range OLMCPR(sLo) S =O0.0 =1.0 BOC -EOC 1.46 1.57 FIGURE 3-4B-5 SLO MCPR Limits versus Average Scram Time (Main Turbine Pressure Regulator System in TLCO 3.3.13.c)28 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 4.0 LHGR LIMITS (Technical Specification 3.2.3)For both two loop operation (TLO) and single lop operation (SLO), the LHGR limit for each six inch axial segment of each fuel rod in the core is the applicable rated-power, rated-flow LHGR limit taken from Table 4-1 multiplied by the smaller of either: a. The flow-dependent multiplier, LHGRFACF, as determined by Table 4-2, OR b. The power-dependent multiplier, LHGRFACp, as determined by Table 4-3.Table 4-1 shows the exposure-dependent LHGR limits for all fuel types in the core, as a function of initial gadolinium concentration in a six inch segment of a fuel rod. For exposures between the values shown in Table 4-1, the LHGR limit is based on linear interpolation. For illustration purposes, Figures 4-3A and 4-3B show the LHGR limits for fuel segments with the lowest (UO 2) and highest (U0 2+Gd 2 O 3) initial Gd concentrations. TABLE 4-1 LHGR Limits versus Peak Pellet Exposure Rod Pellet Pellet Pellet Pellet Pellet Pellet Segment Maximum Exposure Power at Exposure Power at Exposure at Fuel Initial Power Knee I Knee 2 Knee 2 EOL EOL Type Wt-% Gd20, (kWlft) (GWdIST) (kWlft) (GWdlST) (kWlft) (GWdlST)GE14C GNF2 BOL = Beginning of Life (zero exposure)EOL = End of Life (maximum licensed pellet exposure)29 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information TABLE 4-2 Flow-Dependent LHGR Operating Flexibility Options LHGRFACF Equipment In or Out of Service Fuel Type EOC-RPT Main Turbine Main Turbine High Pressure Figure #System In Bypass System Pressure Regulator Heaters In Service Operable* System Status Service GE14C Yes/No Yes/No TLCO 3.3.13.a or b Yes/No 4-1A GE14C Yes/No Yes/No TLCO 3.3.13.c Yes 4-1A GE14C Yes/No Yes/No TLCO 3.3.13.c No Not Licensed GNF2 Yes/No Yes TLCO 3.3.13.a or b Yes/No 4-1B GNF2 Yes/No Yes TLCO 3.3.13.c Yes 4-1B GNF2 Yes/No No TLCO 3.3.13.a or b Yes/No 4-1C GNF2 Yes/No No TLCO 3.3.13.c Yes 4-1C GNF2 Yes/No Yes/No TLCO 3.3.13.c No Not Licensed TABLE 4-3 Power-Dependent LHGR Operating Flexibility Options LHGRFACp Equipment In or Out of Service Fuel Type EOC-RPT Main Turbine Main Turbine High Pressure Figure #System In Bypass System Pressure Regulator Heaters In Service Operable* System Status Service GE14C/GNF2 Yes/No Yes/No TLCO 3.3.13.a or b Yes 4-2A GE14C/GNF2 Yes/No Yes/No TLCO 3.3.13.c Yes 4-2A GE14C/GNF2 Yes/No Yes/No TLCO 3.3.13.a or b No 4-2B GE14C/GNF2 Yes/No Yes/No TLCO 3.3.13.c No Not Licensed* At least two bypass valves must be operable 30 Version 1 Plant Hatch Unit 2 Cycle 24 Non-Proprietary Information Core Operating Limits Report 1.0 C.)U 0.9 0.8 0.7 0. 0.6.2 U- 0.5 0.4 30 40 50 60 70 80 90 Core Flow (%of Rated)100 110 LHGRFACF = A + B*F Operating Conditions Values of Variables F SLO / TLO A B 30 < F < 50.70 SLO / TLO 0.4574 0.006758 50.70 < F < 80.29 TLO 0.4574 0.006758 50.70 -F SLO 0.8000 0.000000 80.29< F TLO 1.0000 0.000000 F = Percent of Rated Core Flow FIGURE 4-1A GE14C Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 31 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 1.0 U 0.9"r.I L- 0.8 0.4 CD 0.7 ,-J S0.6 a.0 w. 0.5 0.4 30 40 50 60 70 80 90 100 110 Core Flow (%of Rated)LHGRFACF = A + B*F Operating Conditions Values of Variables F SLO / TLO A B 30!< F < 50 SLO / TLO 0.20000 0.01190 50 < F < 50.7 SLO / TLO 0.45667 0.00677 50.7 < F < 80 TLO 0.45667 0.00677 50.7 < F SLO 0.80000 0.00000 80 < F < 90 TLO 0.98200 0.00020 905 F TLO 1.00000 0.00000 F = Percent of Rated Core Flow FIGURE 4-1B GNF2 Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 32 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 1.0 U 0.9 0-j 0.8 0.7--I 0.6 LL 0.5 0.4 30 40 50 60 70 80 90 100 110 Core Flow (%of Rated)LHGRFACF = A + B*F Operating Conditions Values of Variables F SLO / TLO A B 30 _ F < 50 SLO / TLO 0.380 0.0049 50_5F<60 SLO/TLO -0.210 0.0167 605 F < 61.2 SLO / TLO 0.390 0.0067 61.2:5 F < 90 TLO 0.390 0.0067 61.2 < F SLO 0.800 0.0000 90 < F < 100 TLO 0.930 0.0007 100 F TLO 1.000 0.0000 F = Percent of Rated Core Flow FIGURE 4-1C GNF2 Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow (Main Turbine Bypass System Inoperable) 33 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 1.1-~1.0 0.9 0.7 r 0.8 07 w.J 0. 0.0.5 0.4 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 100 Core Power(% of Rated)LHGRFACP = A + B*P Operating Conditions Values of Variables P F A B 24:_ P < 28 F > 60 0.50500 0.001250 24:_ P < 28 F_< 60 0.41500 0.005000 28 _ P All 0.47760 0.005224 P = Percent of Rated Core Power F = Percent of Rated Core Flow FIGURE 4-2A Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power 34 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 1,11.0 090.8 C, 0.7 CL ,.J 0.6 0 I.0.5 0.4 24 28 32 36 40 44 48 52 .56 60 64 68 72 76 80 84 88 92 96 100 Core Power(% of Rated)LHGRFACP = A + B*P Operating Conditions Values of Variables P F A B 24:_ P < 28 F > 60 0.50500 0.00125 24:_ P < 28 F5 _60 0.41500 0.00500 28!_ P < 52 All 0.47817 0.00521 52 _ P < 80 All 0.74900 0.00000 80 _< P All -0.25500 0.01255 P = Percent of Rated Core Power F = Percent of Rated Core Flow FIGURE 4-2B Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power (High Pressure Feedwater Heaters Out of Service)35 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information Lowest Initial Gd Concentration Peak Pellet Exposure LHGR (GWd/ST) (kW/ft)~_~~rr Highest Initial Gd Concentration Peak Pellet Exposure LHGR (GWd/ST) (kW/ft)~-FIGURE 4-3A GE14C LHGR versus Peak Pellet Exposure 36 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information Lowest Initial Gd Concentration Peak Pellet Exposure LHGR (GWd/ST) (kW/ft)[[L 1]FIGURE 4-3B GNF2 LHGR versus Peak Pellet Exposure 37 Version 1 Plant Hatch Unit 2 Cycle 24 Core Operating Limits Report Non-Proprietary Information 5.0 PBDA AMPLITUDE SETPOINT The amplitude trip setpoint in the Period Based Detection Algorithm in the OPRM system shall not exceed the value reported in the Table below. This applies to instruments 2C51K615 A, B, C, and D.TABLE 5-1 OPRM Setpoint I OLMCPR OPRM Set oint_ 1.39 1.12 38 Version 1 Plant Hatch Core Operating Unit 2 Cycle 24 Non-Proprietary Information Limits Report

6.0 REFERENCES

1. "General Electric Standard Application for Reactor Fuel," NEDE-2401 1-P-A-20, December 2013, and the US Supplement, NEDE-24011-P-A-20-US, December 2013.2. GNF letter VSP-SNC-HV1-14-107-R1, "Hatch 2 C24 FBIR & SRLR," V. S. Perry to S. Hoxie-Key, January 28, 2015.3. Global Nuclear Fuel Document 000N9122, "Supplemental Reload Licensing Report for Edwin I. Hatch Nuclear Power Plant Unit 2, Reload 23 Cycle 24," Revision 0, January 2015.4. Global Nuclear Fuel Document 000N9123, "Fuel Bundle Information Report for Hatch 2, Reload 23 Cycle 24," Revision 0, November 2014.5. SNC Nuclear Fuel Document NF-14-020 "Hatch-2 Cycle 24 Reload Licensing Analysis Report," Version 1, December 2014.6. GNF Document DB-0012.05, "Fuel Rod Thermal-Mechanical Performance Limits for GE14 and GNF2," Revision 4, April 2014.39 Version 1}}