Pages that link to "NRC 11921"
Jump to navigation
Jump to search
The following pages link to NRC 11921:
Displayed 50 items.
- ML15335A279 (← links)
- ML15223A323 (← links)
- ML102780486 (← links)
- ML102500294 (← links)
- ML101550255 (← links)
- TSTF-12-17, Comment (2) of Robert Slough, Roy A. Browning, Otto W. Gustafson & Wendy E. Croft on Federal Register Notice, NRC Position on the Relationship Between General Design Criteria and Technical Specification Operability. (← links)
- TSTF-12-05, Transmittal of Report TSTF-GG-05-01, Revision 1, Writer'S Guide for Plant-Specific Improved Technical Specifications. (← links)
- TSTF-11-10, Comment (1) of Norman J. Stringfellow, Et. Al., on Behalf of Technical Specifications Task Force, Response to Federal Register Notice, Notice of Opportunity for Public Comment on the Proposed Model Safety Evaluation for Plant-Specific Ado (← links)
- TSTF-10-01, Technical Specifications Task Force (TSTF) Position Regarding Required Action Completion (← links)
- TSTF-09-24, Technical Specification Task Force Recommended Changes to Be Incorporated in Revision 4 of the Standard Technical Specifications, NUREG-1430 Through 1434 (← links)
- TSTF-07-28, Comment (1) of the Technical Specification Task Force Response on August 16, 2007 Federal Register Notice, Notice of Opportunity to Comment on Model Safety Evaluation on Technical Specification Improvement to Revise Control Rod Notch. (← links)
- TSTF-06-21, Comment (1) of Technical Specification Task Force (TSTF) Re Technical Specification Improvement for Combustion Engineering Plants to Risk-Inform Requirements Regarding Conditions Leading to Exigent Plant Shutdown Using the Consolidated Li (← links)
- TSTF-06-10, Comment (1) Submitted by Technical Specification Task Force in Response to the 05/03/2006 Federal Register Notice, Notice of Opportunity to Comment on Model Safety Evaluation & Model License Amendment Request on Technical Specification Im (← links)
- TSTF-05-14, Writer'S Guide for Plant-Specific Improved Technical Specifications, TSTF-GG-05-01 (← links)
- TSTF-06-04, Technical Specification Task Force (TSTF) Response to the December 14, 2005 Technical Specification Improvement for Boiling Water Reactors Plants to Risk-Inform Requirements Regarding Selected Required Action End States Using the Consolid (← links)
- TSTF-05-13, Technical Specification Task Force (TSTF) Response to May 25, 2005 Notice of Opportunity to Comment on Model Safety Evaluation on Technical Specification Improvement Re Revision to the Completion Time in STS 3.6.1.3, Primary Containment I (← links)
- TSTF-16-08, Withdrawal of TSTF-553, Revision 0, Add Action for Two Inoperable Creatcs Trains. (← links)
- TSTF-16-09, Technical Specifications Task Force - Revision 3 of TSTF-551, Revise Secondary Containment Surveillance Requirements. (← links)
- TSTF-16-07, Technical Specifications Task Force - Revision 2 of TSTF-551, Revise Secondary Containment Surveillance Requirements. (← links)
- TSTF-15-12, Technical Specifications Task Force - Response to NRC Request for Additional Information Regarding TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements. (← links)
- TSTF-15-08, Technical Specifications Task Force - Transmittal of TSTF-529, Revision 3, Clarify Use and Application Rules. (← links)
- TSTF-15-07, Transmittal of TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements. (← links)
- TSTF-15-05, Withdrawal of TSTF-531, Revision 1, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2. (← links)
- TSTF-14-18, Transmittal of TSTF-551, Revision 0, Address Transient Secondary Containment Conditions (← links)
- TSTF-14-15, Withdrawal of TSTF-540, Revision 0, Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6) (← links)
- TSTF-14-03, Response to NRC Request for Additional Information Regarding TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373 (← links)
- TSTF-14-06, Transmittal of TSTF-547, Revision 0, Clarification of Rod Position Requirements (← links)
- TSTF-14-04, Request to Begin Review Prior to NRC Decision on Fee Waiver for TSTF-542, Revision 0, Reactor Pressure Vessel Water Inventory Control. (← links)
- TSTF-14-02, Transmittal of TSTF-529, Revision 2, Clarify Use and Application Rules. (← links)
- TSTF-14-01, Withdrawal of TSTF-538, Revision 0, Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c. (← links)
- TSTF-13-15, Transmittal of TSTF-542, Revision 0, Reactor Pressure Vessel Walter Inventory Control (← links)
- TSTF-13-09, Transmittal of TSTF-545, Revision 0, TS Inservice Testing (IST) Program Removal. (← links)
- TSTF-13-13, Withdrawal of TSTF-536, Revision 0, Resolve CE Digital TS Inconsistencies Regarding CPCs and Ceacs. (← links)
- TSTF-13-12, Transmittal of TSTF-541, Revision 0, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed (← links)
- TSTF-13-11, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation Corrected Pages (← links)
- TSTF-13-05, Transmittal of TSTF-536, Revision 0, Resolve CE Digital TS Inconsistencies Regarding CPCs and Ceacs (← links)
- TSTF-13-01, Response to NRC Request for Additional Information Regarding TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2 (← links)
- TSTF-13-03, Transmittal of TSTF-529, Revision 1, Clarify Use and Application Rules (← links)
- TSTF-12-15, Response to NRC Request for Additional Information Regarding TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation. (← links)
- TSTF-12-11, Transmittal of TSTF-540, Revision 0, Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6) (← links)
- TSTF-12-10, Comment (1) of the Technical Specifications Task Force on the Federal Register Notice Regarding TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month (← links)
- TSTF-12-08, Transmittal of TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation (← links)
- TSTF-12-07, Transmittal of TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2 (← links)
- TSTF-12-04, Transmittal of TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373 (← links)
- TSTF-12-06, Transmittal of TSTF-538, Revision 0, Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c. (← links)
- TSTF-12-01, Transmittal of TSTF-454, Revision 2, Extend PCIV Completion Times (NEDC-33046). (← links)
- TSTF-11-22, Comment (2) of the TSTF on Notice of Opportunity for Public Comment on the Proposed Model Safety Evaluation for Plant Specific Adoption of Technical Specifications Task Force Traveler TSTF-505 (← links)
- TSTF-11-19, Proposed Model Application for TSTF-432, Revision 1, Change in Technical Specifications End States (WCAP-16294). (← links)
- TSTF-11-17, Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. (← links)
- TSTF-11-15, Transmittal of TSTF-529, Revision 0, Clarify Use and Application Rules (← links)