Pages that link to "NL-21-1130, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1 R23"
Jump to navigation
Jump to search
The following pages link to NL-21-1130, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1 R23:
Displayed 50 items.
- ML13184A269 (← links)
- ML12314A419 (← links)
- ML12249A193 (← links)
- ML11101A083 (← links)
- NL-11-1004, Vogtle, License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3 and Make an Administrative Change to Technical Specification Surveillance Requirement 3. (← links)
- NL-10-1326, Southern Nuclear Operating Company - License Fees (← links)
- NL-10-1326, Vogtle, Units 1 and 2, Intent to Implement Risk Informed Technical Specification Task Force Initiative 4B as the Improved Standard Technical Specification Pilot Plant (← links)
- NL-10-0577, LER 10-S01-00 for Vogtle, Units 1 & 2 Regarding Supplemental Worker'S Unescorted Access Not Revoked in a Timely Manner (← links)
- NL-10-0166, Vogtle Electric Generating Plant, Unit 1 - Supplement to 1R14 Steam Generator Inspection Report - Tube Pull Examination Results (← links)
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan for Class 1, 2 and 3 Figures for Vogtle-2 Volume 8 (← links)
- ML093380123 (← links)
- NL-09-1510, Vogtle Electric Generation Plant, Unit 2 - 3rd Interval VOGTLE-2 ISI Plan, Version 3.0 (← links)
- ML093370313 (← links)
- NL-09-1510, Vogtle Electric Generating Plant, Unit 2 - Submittal of ISI Plan for Class 1, 2 and 3 Components for Third Inspection Interval, Volume 1, Version 3.0 (← links)
- ML093370312 (← links)
- NL-09-1510, Vogtle Electric Generation Plant, Unit 1 - Third 10-Year Interval ISI Plan, Version 3.0 (← links)
- ML093370311 (← links)
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan for Class 1, 2, and 3 Components for Vogtle-1 Third Inspection Interval Volume 2, Version 3.0 (← links)
- ML093370310 (← links)
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan Third Inspection Interval Volume 1, Version 3.0 (← links)
- ML093370309 (← links)
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Third 10-Year Interval ISI Plan (← links)
- NL-09-0430, Vogtle Electric Generating Plant, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1) (← links)
- NL-08-0869, Vogtle, Units 1 and 2 - Enclosure 7, Westinghouse Letter, CAW-08-2448, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice (← links)
- NL-08-0869, Vogtle, Units 1 and 2 - Enclosure 4, Westinghouse Letter, CAW-08-2449, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice (← links)
- NL-08-0818, Vogtle, Units 1 and 2 - Generic Letter 2004-02 Response Extension Request (← links)
- NL-08-0522, Vogtle, Units 1 and 2, Supplemental Information Related to License Amendment Request for an Interim Alternate Repair Criterion to Technical Specification 5.5.9, Steam Generator (SG) Program. (← links)
- ML080440419 (← links)
- NL-06-0990, Southern Nuclear Operating Company Response to NRC Questions Regarding the Vogtle Electric Generating Plant Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (← links)
- NL-05-0189, Part 2 to G20050387 - Briefing Package - Letter from Vogtle (← links)
- NL-18-1356, Core Operating Limits Report, Cycle 22, Version 1 (← links)
- NL-17-2128, Inservice Inspection Program Owner'S Activity Report for Outage 2R19 (← links)
- NL-17-1757, Core Operating Limits Report, Cycle 20, Version 1 (← links)
- NL-17-1641, Submittal of 1R20 Steam Generator Tube Inspection Report (← links)
- NL-17-1157, Transmittal of 1R20 ISI Report Summary (← links)
- NL-17-1063, Core Operating Limits Report, Cycle 21 Version 1 (← links)
- NL-16-2631, Exigent Request to Revise Technical Specifications LCO 3.7.9 for a One-Time Change to Support Unit 2 Nuclear Service Cooling Water Transfer Pump Repair (← links)
- NL-16-0929, Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (← links)
- NL-16-1737, Response to Request for Additional Information Regarding Request to Revise Technical Specifications LCO 3.7.9 for a One-Time Change to Support a Unit 2 Nuclear Service Cooling Water Transfer Pump Refurbishment (← links)
- NL-16-1246, Request to Revise Technical Specifications LCO 3.7.9 for a One-Time Change to Support a Unit 2 Nuclear Service Cooling Water Transfer Pump Refurbishment (← links)
- NL-16-1336, Proposed Alternative VEGP-ISI-ALT-12 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule (← links)
- NL-16-1134, Proposed Alternative VEGP-ISI-ALT-12 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule (← links)
- NL-16-0927, 2R18 Lnservice Inspection Report Summary (← links)
- NL-16-0597, Cycle 19 Core Operating Limits Report, Version 2 (← links)
- NL-16-0081, Submittal of 1R19 Inservice Inspection Report Summary (← links)
- NL-15-1777, Completion of Required Action for NRC Order EA-12-049 and EA-12-051 Mitigation Strategies for Beyond-Design-Basis External Events and Reliable Spent Fuel Pool Level Instrumentation (← links)
- NL-15-1602, Cycle 19 Core Operating Limits Report Version 2 (← links)
- NL-15-1476, Supplement to Response to Request for Additional Information on License Request for Residual Heat Removal Pump Motor (← links)
- NL-15-1425, Response to Request for Additional Information on License Amendment Request for Residual Heat Removal Pump Motor (← links)
- NL-15-0926, Request to Revise Technical Specification LCO 3.5.2 for a One-Time Change to Support a Unit 1 Residual Heat Removal Pump Motor Replacement (← links)