Pages that link to "Mckeon R"
← Mckeon R
Jump to navigation
Jump to search
The following pages link to Mckeon R:
Displayed 40 items.
- ML18033A269 (← links)
- ML18033A268 (← links)
- NRC-95-0068, Provides Rev to Response to NOV 94-11 Re Violations Noted in Rept 50-341/94-11.Corrective Actions:Corrected Locking Discrepancy on E11-F018D (← links)
- ML20086U378 (← links)
- 05000341/LER-1995-006, Forwards LER 95-006 Re Main Turbine Trip Due to False Overspeed During Mechanical Overspeed Test (← links)
- ML20083K955 (← links)
- NRC-95-0034, Submits Response to Insp follow-up 95002-01 & 95002-02 That Concerns Use of Ref Curves on SR Pumps to Determine If Pump Hydraulic Performance Was Acceptable (← links)
- NRC-95-0029, Lists Total Amount of Property Damage & Decontamination Coverage in Effect at Facility (← links)
- NRC-95-0039, Submits Recent Changes to ERDS Data Point Library,Per NUREG-1394,rev 1 (← links)
- NRC-95-0028, Monthly Operating Rept for Feb 1995 for Fermi 2 (← links)
- NRC-95-0008, Informs That Util Intends to Implement Formal Industry Position on Severe Accident Mgt Approved by Nuclear Energy Inst,Nuclear Strategic Issues Advisory Committee on 941104 (← links)
- 05000341/LER-1995-001, Forwards LER 95-001 Re Reportable Event That Occurred on 950211.Listed Commitments Made in Ler,Including Clarification of Procedure Requirements to Distinguish Between Use of Test Equipment & Actual Acquisition (← links)
- NRC-95-0016, Monthly Operating Rept for Jan 1995 for Fermi 2 (← links)
- NRC-94-0120, Forwards Rev 0 to Fermi 2 COLR Cycle 5 (← links)
- NRC-94-0094, Discusses Extension for Completion of GL 89-10, Safety- Related MOV Testing & Surveillance Activities at Facility (← links)
- NRC-94-0108, Forwards Test Rept Re Results of Special Control Ctr HVAC Fan Pressure Test (← links)
- NRC-94-0102, Provides Status of Detroit Edison Initiatives on Pressure Locking & Thermal Binding of Gate Valves (← links)
- NRC-94-0103, Provides Response to NRC Administrative Ltr 94-12, Operator Licensing Natl Exam Schedule (← links)
- NRC-94-0098, Forwards Nonproprietary Documents Re Turbine Generator Repairs & Restart from Fourth Refueling Outage (← links)
- NRC-95-0105, Revises 950929 Request for Discretionary Enforcement W/ Respect to Requirements of TS Action Statement 3.8.1.1.d & TS 4.0.3,documenting That Addl auto-connected Loads Affected by Incomplete Surveillance Requirements (← links)
- NRC-96-0007, Provides Response to Requested 180-day Actions Required by GL 95-07, Pressure Locking & Thermal Binding of Safety- Related Power-Operated Gate Valves (← links)
- NRC-95-0113, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-341/95-12.Corrective Actions:Procedure 35.309.001 Has Been Revised to Include Sufficient Level of Detail to Specify Appropriate Manner to Perform Test on Charger (← links)
- NRC-95-0135, Forwards Info to Supplement RAI Re Relief Request PR-7-R1 for IST of RHR Svc Water Pumps (← links)
- NRC-95-0123, Forwards Rev 1 to Radiological Emergency Response Preparedness Plan & RERP Implementing Procedures (← links)
- 05000341/LER-1995-007, Forwards LER 95-007-00 Re Failure to Meet TS Surveillance Requirements Related to EDG Output Breaker re-closure Circuitry,Initiated Following Load Shed (← links)
- NRC-95-0106, Provides Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves (← links)
- NRC-95-0092, Monthly Operating Rept for Sept 1995 for Fermi 2 (← links)
- NRC-95-0045, Annual Radiological Environ Operating/ Monitoring Rept (← links)
- NRC-96-0066, Provides Documentation of Util Responses to NRC Questions Asked During 960530 Telcon Re Combustion Tg 11 Unit 1 Reliability & Sys Refurbishment (← links)
- NRC-96-0069, Modifies Proposed TS Change Involving EDG Action Statements 3.8.1.1.b & 3.8.1.1.d & SR (← links)
- NRC-95-0102, Forwards Rev 7a to Fermi 2 Ufsar. Rev 7a Incorporate Changes to QA Program as Result of NRC Approval of TS Amend 104,including Revised Pages to Retract Refs to Plant Mod Not Yet Implemented & Page Inadvertently Omitted from Rev 7 (← links)
- NRC-95-0067, Provides Response to NRC Re Violations Noted in Insp Rept 50-341/95-08.Corrective actions:FIP-ASI-01, Internal Audits & Surveillance, Was Reviewed (← links)
- NRC-95-0062, Forwards Response to NRC Re Unresolved Items & Insp follow-up Item Noted in Insp Rept 50-341/95-04. Corrective Actions:Eop Flowchart for Hydrogen & Oxygen Control Will Be Revised (← links)
- NRC-95-0035, Annual Nonradiological Environ Operating Rept 1994. W/ & Two Oversize Encl (← links)
- NRC-95-0033, Forwards Response to Re Violations Noted in Insp Rept 50-341/95-03.Corrective Actions:Set multi-discipline Task Force to Evaluate Repetitive Failures of Ite MCC Auxiliary Contacts & Barton Differential Pressure Switches (← links)
- NRC-95-0019, Forwards Response to NRC Re Violations Noted in Insp Rept 50-341/95-02.Corrective Actions:Valves Disassembled & Inspected Per Procedure 47.000.13, Pep Check Valve Insp Procedure (← links)
- NRC-94-0144, Updates Util ,Informing That Actions Required by 931228 CAL Completed & That Fermi 2 Being Prepared to Restart & Informs That Restart Certification Program for Cycle 5 Operation Essentially Completed (← links)
- NRC-95-0069, Forwards Monthly Operating Rept for Jul 1995 for Fermi Unit 2.Rept Includes Operating Data Rept,Average Daily Unit Power Level & Summary of Unit Shutdowns & Power Reductions Identified in RG 1.16 & Fermi Unit 2 TS 6.9.1.6 (← links)
- ML20058D814 (← links)
- NRC-93-0102, Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Jul- 1992-June 1993 (← links)