Pages that link to "ML20236T954"
Jump to navigation
Jump to search
The following pages link to ML20236T954:
Displayed 12 items.
- PNO-III-97-046, on 970516,WI Energy Co & Northern States Power Co Announced They Were Terminating Plans for Proposed Merger of Two Companies Into New Co,Primergy Corp.Utils Attributed Decision to Changing Regulatory Policies (← links)
- PNO-III-97-043, on 970509,licensee Began Shutting Down Reactor Pending Replacement of Strainers on Suction Lines from Pressure Suppression Pool (Torus) to Various Eccs. Decision to Shutdown & Replace Strainers Made by Licensee (← links)
- PNO-III-86-002, on 860117,bomb Threat Received at Trouble Ctr by Unidentified Man.Security & Wright County Sheriff Dept Notified.Security Searched Area.No Bomb Found (← links)
- PNO-III-85-075, on 850825,Minneapolis Emergency Ctr Received Bomb Threat at Plant from Unidentified Caller.Util Notified. Owner Controlled Area & Internal Areas Searched.No Bomb Discovered (← links)
- PNO-III-85-085, on 850921,unidentified,apparently Intoxicated Man Called in Bomb Threat to Util Ofc.Plant Officials & Security Notified.No Bomb Found (← links)
- PNO-III-75-016, on 740630,util Reported That Insp Conducted for 10 Spent 7x7 Fuel Assemblies Which Had Been Previously Identified as Fuel Leakers.Preliminary Results Indicate Longitudinal Cracks in Clad (← links)
- ML20151X686 (← links)
- PNO-III-87-082, on 870616,licensee Declared Unusual Event After Concluding That Problems W/Electric Ground Fault Protection Sys Could Result in Common Mode Failure.Licensee Installed 14 Jumpers Around Questionable Detection Devices (← links)
- ML20248H632 (← links)
- PNO-III-86-123, on 861027,television Station Received Anonymous Call Re Obstruction of Burlington Northern Railroad Track Which Serves as Route for Reactor Spent Fuel Shipment.Barricade Found & 39-ft Section of Track Missing (← links)
- PNO-III-86-123A, on 861030,Governor as Earl of State of Wi Requested That NRC Delay Rail Shipments of Spent Fuel from Plant to Ref GE Facility,Pending Federal Railway Admin Insp of Route & Investigation of Possible Sabotage (← links)
- PNO-III-84-103A, on 841129,handle on 1 of 18 Final Bundles in 1F-300 rail-mounted Spent Fuel Cask Discovered Bent. Caused by Incorrect Seating of Lid.All Fuel Elements Will Be Fully Seated in Cask Basket Before Lid Installed (← links)