Pages that link to "ML20212A038"
Jump to navigation
Jump to search
The following pages link to ML20212A038:
Displayed 25 items.
- ML20054L796 (← links)
- ML20083B675 (← links)
- ML20081G093 (← links)
- ML20099A710 (← links)
- ML20116B852 (← links)
- ML20116B849 (← links)
- ML20137S312 (← links)
- ML20140D015 (← links)
- ML20138B860 (← links)
- ML20155A453 (← links)
- ML20202E669 (← links)
- DCL-89-117, Special Rept:On 890406,main Steam Line Radiation Monitor 1RM-71 Alarmed & Declared Inoperable.Caused by Failure of Detector Tube.Tube Replaced.Monitor Returned to Svc on 890418 (← links)
- DCL-86-355, Special Rept 86-03:on 861202,plant Vent high-range Monitor Failed in high-range.Replacement Detector Ordered & Scheduled to Arrive on 870108 (← links)
- DCL-87-027, Special Rept 87-01:on 870126,plant Action Request Initiated After Intermittent Sys Failure Alarms Received on Train B of Reactor Vessel Level Indication Sys (Rvlis).Cause Under Investigation.Effort to Restore Train B of RVLIS Continuing (← links)
- ML20210S627 (← links)
- DCL-86-106, Special Rept SR 86-02:on 860331,main Steam Line Radiation Monitor RM-71 Inoperable for More than 7 Days.Caused by Failed Power Supply & Log Rate Circuit Boards.Alternate Radiation Monitoring Methods Established (← links)
- DCL-86-088, Special Rept SR 86-01:on 860315,all Monitor Channels on Primary Meteorological Tower Incapacitated Due to Lightning. Temp Channels Required Replacement.On 860317,spare Processor Failed.Replacement Expected by 860402 (← links)
- DCL-86-012, Special Rept SR 85-09:on 851223,during Mode 1,diesel Generator 1-1 Failed to Start During Performance of Surveillance Test.Caused by Failure of 125-volt Dc Converter That Powers tach-pak.Converter Replaced.Procedures Revised (← links)
- DCL-86-312, Rev 1 to Special Rept SR 85-09:on 851223,w/unit in Mode 1, Diesel Generator Failed to Start During Performance of Surveillance Test.Caused by Dc Converter Failing to Operate Manually.Converter Replaced (← links)
- DCL-96-155, Revised Special Rept SR 95-05:on 950806,EDG 1-2 to Achieve Rated Output Frequency within TS Limits.Caused by Degraded Electronic Governor Performance.Replaced Electronic Governor Motor Operated Potentiometer & Electronic Governor (← links)
- DCL-84-377, Special Rept 84-14:on 841102,Unit 1 18-month Fire Barrier Insp Identified Six Conduits & One Cable Penetration Not Sealed in Accordance W/Installation Procedure DCP 2.Fire Watch Established.Related Correspondence (← links)
- DCL-84-306, Special Rept 84-10:on 840728,addition of Cool Feedwater to Steam Generators Resulted in Decrease in Reactor Coolant Temp to Low Setpoint.At Same Time,Hi Steam Flow Bistables Tripped for Surveillance Testing (← links)
- DCL-84-079, Special Rept 84-02:on 840123,fire Water Pump 1 Declared Inoperable After Pump Motor Circuit Breaker Tripped. Caused by Frequent Motor Starts in Short Time Period. Surveillance Test Conducted & Pump Returned to Svc (← links)
- DCL-84-042, Ro:On 831230,conduit Installed Through Fire Barrier Wall in Cable Spreading Room.On 840107,four Fire Doors Removed & Replaced W/Heavy Duty Fire Doors.On 840109,fire Barrier Penetrations Nonfunctional Due to Mods (← links)
- DCL-84-026, Ro:On 831215,fire Barrier Wall Between Containment Penetration Area & Auxiliary Bldg Removed.Wall Replaced W/Concrete Barrier for Addl Strength in Event of Steam Pipe Leak Prior to Operation (← links)