Pages that link to "Holden J"
← Holden J
Jump to navigation
Jump to search
The following pages link to Holden J:
Displayed 50 items.
- ML18101B367 (← links)
- ML18101B342 (← links)
- 05000302/LER-1994-006, Forwards Corrected Page One of LER 94-006-06 Which Had Typo in Block 7, Rept Number (← links)
- 05000302/LER-1996-003, Submits LER 96-003-00 Re GL 96-01 Testing Deficiencies.Fpc Review & Corrective Action Expected Prior to Startup from Current Outage R-1.Suppl Reporting Related Logic Sys Testing Deficiencies Expected by 970630 (← links)
- 05000302/LER-1997-003, Forwards LER 97-003-03 Re GL 96-01 Testing Deficiencies (← links)
- ML20141D931 (← links)
- ML20140H538 (← links)
- ML20140A599 (← links)
- ML20137N763 (← links)
- ML20137G166 (← links)
- ML20136A673 (← links)
- ML20199B738 (← links)
- ML20198T361 (← links)
- ML20198J781 (← links)
- ML20198J750 (← links)
- 3F0698-27, Responds to NRC Re Violations Noted in Insp Rept 50-302/98-04.Corrective Actions:Individuals Involved W/ Review of Precursor Card (Pc) Documenting Eight Apparent Discrepancies Were Counseled on Processing Manual Pcs (← links)
- 3F0598-01, Application for Amend to License DPR-72,proposing Changes to FSAR to Include Description of Use of GL 87-11, Relaxation in Arbitrary Intermediate Pipe Rupture Requirements & NUREG/CR-2913,as Part of Licensing & Design Basis (← links)
- 3F0598-19, Provides NRC W/Current Status of Technical Support Ctr Const Project (← links)
- 3F0898-11, Forwards Response to Violations Noted in Insp Rept 50-302/98-05.Corrective actions:long-term Impact of Continuing to Accrue Addl Unavailability Due to Surveillance Performances Was Evaluated (← links)
- 3F0798-07, Forwards Rev 25,vols 1-4,to Crystal River Unit 3 FSAR, Incorporating Exception to 10CFR50.4(b)(6) as Stated in .W/Summary of Changes & Summary of SEs Performed During Submittal Period (← links)
- 3F0798-20, Forwards Crystal River Unit 3 Emergency Action Level Basis Document, Rept Applied Methodology That Is Consistent W/ NUMARC/NESP-007,Rev 2.Commitments Made by Util,Encl (← links)
- 3F0798-18, Submits Response to GL 98-01 Yr 2000 Readiness of Computer Systems at Npps. Util Is Pursuing Y2K Program Similiar to Nei/Nusmg 97-07, Nuclear Util Yr 2000 Readiness. Final Response to GL 98-01 Will Be Submitted by 990701 (← links)
- 3F0698-10, Informs That Submission of LAR to Resolve USQ Re Max Design Load on Motor for motor-driven Emergency Feedwater Pump (EFP-1),is No Longer Necessary.Util Plans to Install diesel- Driven EFP-3 to Replace Current SR Functions of EFP-1 (← links)
- 3F0798-02, Provides Notification That Two Related NRC Commitments Are Being Combined & Revised & That Due Date for New Commitment Is Being Extended,In Response to Violations Noted in Insp Rept 50-302/97-12 (← links)
- 3F0698-32, Responds to NRC 980326 Request for Addl Info Re Reactor Pressure Vessel Integrity at Unit 3.Calculation of Adjusted Ref Temp Evaluated W/O Consideration of Atypical Weld (← links)
- 3F0598-02, Responds to NRC Re Violations Noted in Insp Rept 50-302/98-03.Corrective Actions:Counseled Personnel Involved in Event,Restored Nuclear Applications Software (Nas) & Nas Monitor to Svc & Installed Password Protection for Nas Pc (← links)
- 3F0897-09, Provides Response to Request for Addl Info Re TS Change Request Notice 211,Rev 0.Attachment a Provides List of Regulatory Commitments Made in Submittal (← links)
- 3F0398-26, Responds to NRC Re Violations Noted in Insp Rept 50-302/98-01.Corrective Actions:Switching & Tagging Qualifications Were Removed & Appropriate Disciplinary Action Taken for Individual Performing Improper Action (← links)
- 3F0498-18, Provides Advanced Notification of FPC Plans Re Construction Project to Add Three Floors to Existing Tsc/Osc.Compensatory Measures Will Be Employed to Ensure Continued Timely Activation of Tsc/Osc & Dispatch of Emergency Teams (← links)
- 3F1097-24, Informs NRC That No Addl Operator Actions Have Been Identified That Represent USQs Beyond Actions Described in TS Change Request Notice 210 Associated W/Mitigation of SBLOCA Conditions.Types of Operator Actions,Listed (← links)
- 3F1099-01, LAR 253,rev 0 to License DPR-72,incorprating Requirements from Biological Opinion Issued by Natl Marine Fisheries Svc (← links)
- 3F0398-18, Responds to NRC Re Violations Noted in Insp Rept 50-302/97-12.Corrective Actions:Review of EOPs Was Conducted to Identify Actions to Be Performed by Support Organizations (← links)
- 3F0997-27, Provides Description of HPI Sys Modifications to Improve Small Break LOCA Margins,Consistent W/Commitments Made in .Commitments Made by Util,Encl (← links)
- 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 (← links)
- 3F0498-15, Forwards Response to Violations Noted in Insp Rept 50-302/98-02.Corrective Actions:Listing of Plant Equipment Utilized for in-plant Actions,By Tag Number Equipment Noun Name & Plant Location,Compiled from Review of Each EOP (← links)
- 3F0398-10, Forwards Revised Response to NRC Re Violations Noted in Insp Rept 50-302/97-17.Corrective Actions:Revised B EDG Functional Test Procedure Safety Assessment & Revised MAR 96-11-02-01 Functional Test Procedure TP-1 (← links)
- 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl (← links)
- 3F1097-37, Provides Info Re Insp of High Pressure Injection/Makeup Line Nozzles at Crystal River Unit 3 as Identified in Item 31 of Attachment B to (← links)
- 3F1097-02, Supplemental Response to Responding to Violations Noted in Insp Rept 50-302/96-09,providing Results of Evaluation Completed on 970930 & Proposed Corrective Actions for Identified Discrepancies (← links)
- 3F1097-27, Provides Response to NRC Request for Addl Info Re TS Change Request Notice 209,Rev 1 for Unit 3.Commitment Made in Submittal Identified in Attachment B (← links)
- 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 (← links)
- 3F1097-14, Forwards Rev 1 to Pressure/Temp Limits Rept, Per Requirements of TS 5.6.2.19.Rept Revised to Provide Consistency W/Normal & Emergency Plant Operating Procedures. TR BAW-2241P Has Been Submitted for Review.Commitments,Encl (← links)
- 3F1097-07, Forwards Response to Violations Noted in Insp Rept 50-302/97-11.CAs:Health Physics Personnel Assigned Responsibility for Providing Ventilation for OTSG Work Were Counseled for Failing to Secure Temporary Purge Fans (← links)
- 3F0999-06, Rev 1 to LAR 249,dtd 990505,application for Amend to License DPR-72,revising Once Through Steam Generator Tube Surveillance Program (← links)
- 3F0997-02, Forwards Summary of Plant App R Restart Design Items Covered Under Restart Item D-11,in Response to 970707 Rai.Schedule Shows That Most App R Related Construction Will Be Completed by Last Half of Nov 1997 (← links)
- 3F0997-30, Forwards Suppl Info to TS Change Request Notice 210 Re Proposed Changes to TS & Other Aspects of Licensing & Design Basis,To Address Mods & Procedure Changes Required to Mitigate Consequences of Certain SBLOCA (← links)
- 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented (← links)
- 3F0997-31, Forwards EOP EOP-02, Vital Sys Status Verification, in Response to Rai, Re TS Change Request 210 (← links)
- 3F0997-28, Responds to Restart Issue Identified in Integrated Performance Assessment Process Final Assessment Rept 50-302/96-201 Re Boron Precipitation Following Design Basis LOCA (← links)
- 05000302/LER-1997-016, Revises Commitment Contained in Re LER 97-016-00. Revision Does Not Represent Substantial Change in Corrective Action Planned by FPC (← links)