Pages that link to "Greger R"
← Greger R
The following pages link to Greger R:
Displaying 23 items.
- IR 05000272/1980003 (← links)
- PNO-III-88-037, on 880412,approx 1,000 Gallons of Radioactive Water Drained from RHR Sys Piping Into Equipment Room.Spill Occurred When RHR Valves Returned to Normal Positions After Leak Rate Testing.Cleanup of Rooms & Equipment Initiated (← links)
- PNO-III-88-034, on 880406,up to 68 Workers Received Minor Exposures to Airborne Radioactivity,Principally I-131,during Steam Generator Tube Plugging Activities.Cause Under Investigation.Respirators Required to Enter Containment (← links)
- PNO-III-83-112, on 831102-03,airborne Iodine Releases Occurred Inside Containment,During SG Replacement Work. Whole Body Counting Will Be Performed to Evaluate Personal Uptakes.Two Regions Based Specialists Dispatched to Site (← links)
- PNO-III-83-103, on 831021,empty Sf Cast Arrived at West Valley,Ny from Point Beach Nuclear Plant,W/Three Small Areas of Contamination in Excess of Us DOT Limit of 22,000 Disintegrations Per Minute Per 100 Square Centimeters (← links)
- PNO-III-87-046, on 870228,radwaste Shipment Driver Arrested for Driving While Intoxicated After Truck Slid Off Roadway While Being Parked.Replacement Driver Sent.Truck Surveyed & Escorted Back to Plant Site (← links)
- PNO-III-88-090, on 881031,5,000 Gallons of Liquid Radwaste Leaked Through Failed Seal on Radwaste Evaporator HX in Radwaste Bldg.Util Drained Water Out of Radwaste Room & Decontaminated Affected Areas.No Liquid Entered Drain Sewer (← links)
- ML20203P593 (← links)
- ML20247D168 (← links)
- PNO-III-87-147, on 871202,licensee Reported That About 20 Gallons of Waste Sludge Overflowed from Tank & Reached Onsite Basin.Caused by Failure of Level Alarm on Tank, Permitting Spill to Occur.State of Il & EPA Notified (← links)
- PNO-III-89-015, on 890224,senior Reactor Operator Site Access Suspended After Urine Test Showed Evidence of Marijuana. Licensee Reviewing Individual Work Activities to Determine If Review of Prior Activities Warranted (← links)
- PNO-III-86-098, on 860911,small Unplanned Release of Radioactive Noble Gas Detected in Auxiliary Bldg & Control Room.Caused by Malfunctioning Level Indicator on Spent Resin Storage Tank.Gas Cleared by Ventilation Sys (← links)
- ML20062G040 (← links)
- PNO-III-90-067, on 901003,small Unplanned Release of Noble Gases Occurred While Personnel Collecting Gas Sample from Vol Control Tank.Release Apparently Occurred as Result of Seal Failure on Gas Analyzer Sample Pump (← links)
- ML20058F471 (← links)
- ML20058F464 (← links)
- IR 05000440/1982007 (← links)
- PNO-III-93-019, on 930326,ROs Manually Scrammed Reactor Because of Break in 30-inch Fiber Glass,Underground Svc Water Line Outside Plant,Which Caused Flooding.Broken Line Was Isolated by Shutting Off Svc Water Pumps (← links)
- PNO-III-90-009, on 900220,security Guard Accidentally Fired Shotgun Inside Security Patrol Vehicle,Damaging Floor.No One Injured.Guard Suspended,Pending Further Investigation. No Evidence of Substance Abuse Noted by Behavioral Analysis (← links)
- PNO-III-89-074, on 890403,technician Handled Fuel Fragment While Performing Survey & Decontamination Activities.Event Reported on 891115.Technician Received Highly Localized Dose to Portion of Hand.Region III Will Conduct Insp in Dec (← links)
- ML19308C463 (← links)
- ML19289G113 (← links)
- PNO-III-89-026, on 890409 & 10,circuit Breakers on Cd Diesel Generator Invertor Verified to Be in Closed Position. Licensee Investigation Concluded That Neither Mechanical Failure or Electrical Fluctuations Caused Breakers to Open (← links)