Pages that link to "Babcock & Wilcox"
Jump to navigation
Jump to search
The following pages link to Babcock & Wilcox:
Displayed 50 items.
- ENS 49243 (← links)
- ML14342A916 (← links)
- ML14030A368 (← links)
- ML13038A114 (← links)
- ML080590247 (← links)
- ML18109A077 (← links)
- ML18095A011 (← links)
- ML17290A003 (← links)
- TSTF-16-01, Technical Specifications Task Force - Updated TSTF Membership and Distribution (← links)
- TSTF-13-06, Updated TSTF Membership and Distribution (← links)
- TSTF-11-01, Updated TSTF Membership and Distribution (← links)
- TSTF-09-28, Technical Specifications Task Force (Tstf), Updated TSTF Membership and Distribution (← links)
- TSTF-09-22, Comment (2) of the Technical Specification Task Force on Proposed Model Safety Evaluation for Plant-Specific Adoption of Technical Specification Task Force Traveler (Tft) 513, Revision 2, Revise PWR Operability Requirements and Actions fo (← links)
- TSTF-09-04, Technical Specifications Task Force (TSTF) - Changes to the TSTF Membership and Updated Distribution List (← links)
- ML073240092 (← links)
- ML073240071 (← links)
- ML073240066 (← links)
- ML073240063 (← links)
- TSTF-18-07, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 (← links)
- TSTF-18-04, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. (← links)
- TSTF-17-17, Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program (← links)
- TSTF-17-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements. (← links)
- TSTF-17-07, Transmittal of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (← links)
- TSTF-16-02, Technical Specifications Task Force - Response to NRC Request for Additional Information Regarding TSTF-542, Revision 1, Reactor Pressure Vessel Water Inventory Control and Submittal of Revision 2 (← links)
- TSTF-13-12, Comment (1) by Robert Slough, Otto Gustafson, Richard Loeffler and Wendy Croft on Proposed Safety Evaluation for Plant-Specific Technical Specifications Task Force Traveler TSTF-523 (Generic Letter 2008-01) (← links)
- TSTF-13-02, Submittal of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation. (← links)
- TSTF-11-05, Withdrawal of TSTF-508, Revision 1, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation. (← links)
- TSTF-10-21, Invitation to Participate in Industry Workshop on TSTF-493, Clarify Application of Setpoint Methodology for LSSS Functions (← links)
- TSTF-10-08, Response to Request for Additional Information and Revision to TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (← links)
- TSTF-10-13, Change in Fee Exemption for TSTF-513 & TSTF-514 (← links)
- TSTF-10-07, Transmittal of TSTF-493, Revision 4, Errata, Clarify Application of Setpoint Methodology for LSSS Functions. (← links)
- TSTF-10-04, Transmittal of TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. (← links)
- TSTF-10-02, Transmittal of TSTF-521, Revision 0, Exclusion of Time Constants from Channel Operation Tests in Specifications 3.3.1 and 3.3.2 (← links)
- TSTF-09-25, Transmittal of Revised Risk-Informed End State Travelers: TSTF-422, TSTF-423, TSTF-431, and TSTF-432 (← links)
- TSTF-09-20, Transmittal of TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 (← links)
- TSTF-09-16, Technical Specifications Task Force - Withdrawal of TSTF-507, Revision 0, CLIIP Traveler to Increase Standardization (← links)
- TSTF-09-08, Transmittal of TSTF-510, Revision 0, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. (← links)
- TSTF-09-09, Letter from Technical Specifications Task Force to J. E. Dyer, CFO, Dated March 26, 2009, Request for Fee Exemption for TSTF-510 Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. (← links)
- TSTF-09-07, Industry Plan to Resolve TSTF-493, Clarify Application of Setpoint Methodology for LSSS Functions (← links)
- TSTF-09-02, Transmittal of TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (← links)
- TSTF-09-06, Notification of Industry Guidance Regarding Commitment in TSTF-372-A, Revision 4, Addition of LCO 3.0.8, Inoperability of Snubbers. (← links)
- TSTF-09-03, Transmittal of TSTF-513, Revision 1, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation and TSTF-514, Revision 0, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation (← links)
- TSTF-08-21, Transmittal of TSTF-513, Revision 0, Revise Operability Requirements and Actions for RCS Leakage Instrumentation. (← links)
- TSTF-08-14, Response to Request for Additional Information on TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360. (← links)
- TSTF-07-27, Response to NRC Request for Additional Information Regarding TSTF-498, Revision 0, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461), Dated June 13, 2007 (← links)
- TSTF-07-24, TSTF-431, Revision 2, Change in Technical Specifications End States (BAW-2441). (← links)
- TSTF-07-22, TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control. (← links)
- TSTF-07-21, Response to NRC Request for Additional Information Regarding TSTF-431, Revision 1, Change in Technical Specifications End States (BAW-2441), Dated May 3, 2007 (← links)
- TSTF-07-20, Request to Restart Review of TSTF-446, Revision 2, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791). (← links)
- TSTF-07-17, TSTF-487, Revision 1, Relocate DNB Parameters to the Colr. (← links)