Pages that link to "1G33-F052A"
Jump to navigation
Jump to search
The following pages link to 1G33-F052A:
Displayed 35 items.
- RS-16-196, Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix F - Fire Protection Safe Shutdown Analysis (← links)
- L-11-082, Submittal of Inservice Testing Programs (← links)
- U-604457, Third Ten-Year Interval Inservice Testing Program Plan Revision 9 (← links)
- U-604326, Third Ten-Year Interval Inservice Testing Program Plan Revision 7 (← links)
- U-603967, Submittal of Inservice Testing Program Plan for the Third Ten-Year Interval (← links)
- ML070930364 (← links)
- ML070920182 (← links)
- L-19-257, Submittal of Perry Nuclear Power Plant Inservice Testing Programs (← links)
- ML20065E934 (← links)
- ML20064K514 (← links)
- ML20059N220 (← links)
- ML20087J569 (← links)
- ML20077J969 (← links)
- ML20137A110 (← links)
- ML20148E977 (← links)
- ML20138Q983 (← links)
- ML20134G625 (← links)
- U-604555, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 0 (← links)
- ML20195H538 (← links)
- ML20206Q357 (← links)
- U-604633, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 1 (← links)
- ML20210T251 (← links)
- IR 05000461/1986052 (← links)
- ML20209H154 (← links)
- U-601141, Forwards Rev 4 to Pump & Valve Testing Program Plan, Per Ja Stevens 880121 Request for Addl Info Re Inservice Testing Program.Program Changes Due to Either Design Changes or Programmatic Improvements Listed in Attachment 4 (← links)
- U-601194, Forwards Response to Ja Stevens 880505 Questions on Inservice Testing (IST) Program,Summary of Changes to IST, Relief Requests & Rev 5 to Pump & Valve Testing Program Plan (← links)
- U-600487, Rev 1 to Clinton Power Station Inservice Insp - Pump & Valve Testing Program (← links)
- U-604703, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 2 (← links)
- ML22216A216 (← links)
- PY-CEI-NRR-0618, Submits Addl Relief Requests & Revs to 850821 & 860408 Relief Requests Re Pump & Valve Inservice Testing Program. ASME Section XI Program Upgraded to Comply W/Requirements of 1983 Edition W/Summer 1983 Addenda.Fee Paid (← links)
- PY-CEI-NRR-2352, Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs (← links)
- PY-CEI-NRR-0445, Forwards Seven Addl Relief Requests to Util Inservice Testing Program for Pumps & Valves.Requests Needed in Order to Maintain Sys/Component Operability.Minor Changes Summarized on Encl Index (← links)
- PY-CEI-NRR-2322, Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program (← links)
- PY-CEI-NRR-1368, Forwards Rev 3 to Pump & Valve Inservice Testing Program Plan (← links)
- U-604788, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 3 (← links)