Pages that link to "05000295/LER-1977-001"
Jump to navigation
Jump to search
The following pages link to 05000295/LER-1977-001:
Displayed 41 items.
- 05000295/LER-2007-001 (← links)
- 05000295/LER-1997-008, Forwards LER 97-008-00 Which Repts Condition That Resulted in Condition of Npp.Listed Commitments Included in Rept (← links)
- 05000295/LER-1997-007, Forwards LER 97-007-00 Re Automatic Actuation of Esf. Submitted Table Identifies Actions Committed to by Util (← links)
- 05000295/LER-1997-006, Forwards LER 97-006-00 Reporting an Event or Condition That Is Prohibited by Tss.Commitments Made in Rept,Listed (← links)
- 05000295/LER-1997-002, Forwards LER 97-002-00.Commitments Made by Util Listed (← links)
- 05000295/LER-1978-078, Forwards LER 78-078/01L-0 (← links)
- 05000295/LER-1978-084, Forwards LER 78-084/03L-0 (← links)
- 05000295/LER-1997-012, Forwards LER 97-012-00,which Documents 970423 Event That Occurred at Zion Generating Station.Commitments Made by Util,Listed (← links)
- 05000295/LER-1997-009, Forwards LER 97-009-00 IAW 10CFR50.73(A)(2)(i)(B) Which Requires Listed Corrective Actions (← links)
- 05000295/LER-1997-010, Forwards LER 97-010-00 IAW 10CFR50.73(a)(2)(i)(B).Corrective Actions Listed (← links)
- 05000295/LER-1981-002, Forwards Updated LER 81-002/03X-1 (← links)
- 05000295/LER-1978-082, Forwards LER 78-082/03L-0 (← links)
- 05000295/LER-1997-022, Forwards LER 97-022-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 1.Commitments Made within Ltr,Encl (← links)
- 05000295/LER-1996-007, Forwards LER 96-007-01 Which Is Being Submitted to Update Safety Analysis & CA Taken Re Event That Occurred at Zion Nuclear Power Station,Unit 1.Commitments Made within Ltr, Encl (← links)
- 05000295/LER-1997-001, Forwards LER 97-001-01,which Clarifies Info on Root Cause,Safety Analysis & Event Description.Corrective Actions Updated to Show Status of Items (← links)
- 05000295/LER-1994-005, Forwards LER 94-005-01 Per 10CFR50.73(a)(2)(iv),which Requires 30 Day Written Rept When Any Event or Condition Resulted in Manual or Automatic Actuation of Any ESF, Including Rps.Commitments,Encl (← links)
- 05000295/LER-1997-026, Forwards LER 97-026-00,per 10CFR50.73(a)(2)(i)(B) Which Requires 30-day Written Rept.Commitments Associated W/Correspondence,Encl (← links)
- 05000295/LER-1997-025, Forwards LER 97-025-00,re Event Which Occurred at Zion Nuclear Power Station.Commitments Made within Ltr Aslo Encl (← links)
- 05000295/LER-1978-087, Forwards LER 78-087/01T-0 (← links)
- 05000295/LER-1978-088, Forwards LER 78-088/03L-0 (← links)
- 05000295/LER-1978-085, Forwards LER 78-085/03L-0 (← links)
- 05000295/LER-1978-089, Forwards LER 78-089/01T-0 (← links)
- 05000295/LER-1978-086, Forwards LER 78-086/03L-0 (← links)
- 05000295/LER-1997-011, Forwards LER 97-011-02,re Two Supplements Mistakenly Sent to Nrc.Questions or Comments Should Be Addressed to R Godley.Commitments Listed (← links)
- 05000295/LER-1997-005, Forwards LER 97-005-01,which Requires Thirty Day Written Rept Following Any Operation Prohibited by Plants Tss. Attachment a Provides Commitments Associated with Correspondence (← links)
- 05000295/LER-1997-024, Forwards LER 97-024-00,per 10CFR50.73(a)(2)(i)(B). Commitments Made by Util,Encl (← links)
- 05000295/LER-1997-023, Forwards LER 97-023-00,per 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util,Encl (← links)
- 05000295/LER-1997-021, Forwards LER 97-021-00 Which Requires 30 Day Written Rept When Any Operation or Condition Is Prohibited by Ts,Per 10CFR50.73(a)(2)(ii) (← links)
- 05000295/LER-1989-008, Forwards LER 89-008-00 Re Room Cooler Svc Water Supply Discrepancy Discovered on 890609 (← links)
- 05000295/LER-1997-015, Forwards LER 97-015-01,per 10CFR50.73(a)(2)(iv),which Requires Written Rept When Any Event Occurs That Resulted in Manual or Automatic Actuation of Any Esg.No Commitments Were Made within Rept (← links)
- 05000295/LER-1997-020, Forwards LER 97-020-00 Per 10CFR50.73(a)(2)(ii) & 10CFR50.72(b)(2)(i).Util Is Unclear Whether Plant Is within or Outside Design Basis,Therefore Event Assumed Reportable. Commitments Made by Util,Encl (← links)
- 05000295/LER-1997-004, Forwards LER 97-004-01,which Clarifies Info on Event Description,Root Cause & Safety Analysis.Cas Have Been Updated.No Commitments Have Been Made (← links)
- 05000295/LER-1997-016, Forwards LER 97-016-00 Re Failure to Recognize That 125 Vdc Buses Were Inoperable During Inter Unit cross-tie.Event Investigation Is Ongoing & Corrective Actions Will Be Provided in Supplemental LER (← links)
- 05000295/LER-1997-018, Forwards LER 97-018-01,which Clarifies Info on Event Description,Root Causes & Safety Analysis.Corrective Actions Have Also Been Updated.Commitments Made within Ltr,Encl (← links)
- 05000295/LER-1997-017, Forwards LER 97-017-01,which Clarifies Info on Event Description,Root Causes & Analysis.Cas Have Been Updated. Attachment a Provides Commitments Associated W/ Correspondence (← links)
- 05000295/LER-1997-019, Forwards LER 97-019-00 Re Failure to Test Safety Related Logic Circuits Required by Tech Specs.Attachment a Provides Commitments Associated W/Correspondence (← links)
- 05000295/LER-1985-035, Special Rept Re Failure to Notify NRC of Quarterly Release of Radioactive Matl in Excess of 2.5 Ci Per Unit on 840513. Failure to Submit Rept Documented in LER 85-035-00 & Insp Repts (← links)
- 05000295/LER-1982-023, Forwards LER 82-023/03L-0 (← links)
- 05000295/LER-1982-022, Forwards LER 82-022/03L-0 (← links)
- 05000295/LER-1982-021, Forwards LER 82-021/03L-0 (← links)
- 05000295/LER-1982-020, Forwards LER 82-020/03L-0 (← links)