Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Wall Sections, as-built.Sheet 2". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19309C206  + (Waives 15 Day Waiting Period for Proposed License for Aldrich Chemical Co to Export Deuterium Oxide to Brazil)
  • ML19257A383  + (Waives 15-day Waiting Period Before Issuance of Export License Due to Urgent Requirements of Customer)
  • ML19210E017  + (Waives 15-day Waiting Period for Expeditious Handling of Request by Transnuclear,Inc to Export Cf-252 to Japan)
  • ML19257B453  + (Waives 15-day Waiting Period for Issuance of License Due to Urgent Requirement of Matl)
  • ML19309B327  + (Waives 15-day Waiting Period for License XB-1089)
  • ML19309B319  + (Waives 15-day Waiting Period for License XB-1090)
  • ML20214D309  + (Waives 15-day Waiting Period for PDR Posting to Enable Westinghouse to Ship Fuel Assembly Containing 420 Kg Depleted U to Canada for Thermal Stress Evaluation by 861124)
  • ML20214D335  + (Waives 15-day Waiting Period for Posting Issuance of License XSNM-2302 Since License Urgently Required.Export Initially Scheduled for Nov 14 But Lack of Required Assurances Prevented Issuance.Shipment Rescheduled for Nov 21)
  • ML20125C161  + (Waives Customary 15-day Waiting Period Before Issuance of License for Tube Div of Kawecki Berylco Industries,Inc to Export 100-ft Zircaloy II Seamless Tubing to Canada)
  • ML19344D567  + (Waives Customary 15-day Waiting Period for Issuance of License for Sandvik Special Metals Corp to Export 2,350 Pieces Zirconium 2.5% Niobium Seamless Tubing to Canada)
  • COM-028, Waives Customary 15-day Waiting Period for Westinghouse License XCOM-0282 Re Export of Components to France  + (Waives Customary 15-day Waiting Period for Westinghouse License XCOM-0282 Re Export of Components to France)
  • ML19242D678  + (Waives Provisions of 10CFR2.720(h)(2)(ii) Governing Discovery Re Written Interrogatories Served by Citizens Energy Forum & Potomac Alliance on Nrc,Regarding Proposed Amend to License NPF-4 to Permit Storage Pool Mod)
  • ML20197D193  + (Waives Right to Receipt of Written Notification by Govt of Latter Intent to Exercise Next Option Period Under Contract NRC-26-96-267)
  • ML14232A655  + (Waka Imamichi - Concerns from Indian Point Annual Assessment Meeting)
  • ML17055C374  + (Wake & Dispersion Models for EBR-II Bldg Complex)
  • ML20280A471  + (Wald- Nuclear Shake Cast)
  • ML073310705  + (Waldman, Et Al.: Biodiversity and Zoogeography of the Fishes of the Hudson River Watershed and Estuary)
  • ML24046A159  + (Walf Creek (50-482), Annual Fatigue Form for 2023 Report)
  • ML23019A169  + (Walk-In and Agenda for Meeting with the EPRI to Discuss Use of the Extremely Low Probability of Rupture Code for LOCA Frequency Estimates)
  • ML14164A048  + (Walk-through Retake Exam Administered 3/24-25/2014)
  • ML22116A191  + (Walkthrough Portion JPMs As-Administered)
  • ML20265E480  + (Wall Bumper (FW-103 & FW-104), as-built)
  • ML20266F396  + (Wall Detail Bow Washing Facility as Built Drawing)
  • ML20265B356  + (Wall Dowels SG 2 El 773 Ft, as-built.Sheet 1 of 1)
  • ML20260J258  + (Wall Elevation Lines DE & DG Embedments Diesel Generator Bldg)
  • ML20263T123  + (Wall Sections, as-built.Sheet 1)
  • ML20261D157  + (Wall Sections. Sheet 1)
  • ML092720430  + (Wall Storage-Tank Sleeves)
  • ML14357A007  + (Wallace and Associates, LLC Expiration Letter 1-1-2015)
  • ML18232A516  + (Walter Kidde Portable Equipment, Inc., Letter Transmitting Renewed Exempt Distribution License 32-23858-01E, Docket No. 03034526, Mail Control 608804)
  • ML18232A517  + (Walter Kidde Portable Equipment, Inc., Renewed Exempt Distribution License 32-23858-01E, Docket No. 03034526, Mail Control 608804)
  • ML061590264  + (Waltz Mill Facility - 2005 Annual Report)
  • ML25037A052  + (Wanda 2025 - Nuclear Data in the Regulatory Framework - USNRC)
  • ML12257A072  + (Wang and Reyes 2008 - Reclamation Managing Water in the West (Tracy Fish Facility Studies) Vol. 42)
  • ML19282B144  + (Wants Facility Const Stopped Because of Sanctity of Life)
  • ML20062G875  + (Wants Facility Stopped Now.Finds It Dangerous)
  • ML20062C664  + (Wants to Amend Caption of Motion Filed 781018 by State of or from Before the ASLB to Before the Aslab)
  • ML19206B394  + (Wants to Determine If double-ended Guillotine Break Inside Reactor Cavity Would Represent Risk to Public Health & Safety)
  • ML053490346  + (Ward Center for Nuclear Studies at Cornell University Research Reactor - Environmental Assessment)
  • ML061030405  + (Ward Center for Nuclear Studies at Cornell University Triga Reactor - Amendment 14 Regarding Decommissioning Plan Approval)
  • ML20246D643  + (Warm Prestress Modeling:Comparison of Models and Experimental Results)
  • ML20265D497  + (Warning Sign.Sheet 1 of 1)
  • ML20263R403  + (Warning System for Emergency Planning Zone:Standard Siren Mounting Detail)
  • ML19331A493  + (Warns of Adverse Effects of Delay in CP Issuance & Stresses That Delay Past Dec 1971 Will Jeopardize Entire Project. Identical to President Nixon Encl)
  • ML17164A420  + (Warren K. Brewer Affidavit and Attachment)
  • ML18200A211  + (Warrior Energy Services Corporation Dba Black Warrior Wireline Corporation; Cover Letter; Amendment 17, License 17-27707-01; Docket 030-35793; Control 602212)
  • ML20262A545  + (Washer.Sheet 1)
  • ENS 42962  + (Washington State Agreement State Report)
  • ML25197A700  + (Washington (1st) Part 37-71-73)
  • ML25197A702  + (Washington (2nd) Part 37-71-73)