Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 57283 + (Unplanned Contamination Involving Melting of Source)
- ENS 54461 + (Unplanned Contamination on Pet Ct Scanner Mobile Unit)
- ENS 55326 + (Unplanned Contamination to an Individual)
- 05000456/FIN-2010004-03 + (Unplanned Cooling Water Flow Reduction during Essential Service Water IST Surveillance)
- ML20245E631 + (Unplanned Criticality Event at U.S. Power Reactors Similar to That at Oskarshamn Unit 3 on 890730)
- ML20034H658 + (Unplanned DG auto-start on Undervoltage Following Unexpected Trip of Shutdown Bus Feeder Breaker During Maint)
- ENS 41168 + (Unplanned Diesel Generator Start on a Valid Bus Undervoltage Signal)
- ENS 42157 + (Unplanned Diesel Generator Starts on a Vaild Bus Undervoltage Signal)
- 05000280/FIN-2011003-01 + (Unplanned Dilution of Unit 2 RCS)
- ENS 44105 + (Unplanned Dose to Fetus)
- ENS 53092 + (Unplanned Emergency Core Cooling System (Eccs) Injection During a Planned Safety Injection Test)
- ENS 45367 + (Unplanned Emergency Diesel Auto Start During Surveillance Testing)
- 05000323/LER-2005-002, Unplanned Emergency Diesel Generator Auto-Start During Testing Due to Personnel Error in Relay Testing + (Unplanned Emergency Diesel Generator Auto-Start During Testing Due to Personnel Error in Relay Testing)
- ENS 45848 + (Unplanned Emergency Diesel Generator Start Due to Loss of a 4160 V Bus)
- ENS 52681 + (Unplanned Emergency Diesel Generator Start Due to Loss of a 4160 V Bus)
- ENS 41129 + (Unplanned Emergency Diesel Start)
- ML061070139 + (Unplanned Environmental Tritium Releases Root Cause Report 428868)
- BSEP-95-0386, Unplanned Esfa + (Unplanned Esfa)
- ENS 57565 + (Unplanned Explosion and Contamination)
- ENS 54950 + (Unplanned Fire and Dose to the Public)
- ENS 50748 + (Unplanned Fire in Building 110 R&D Laboratory Ventilation Hood)
- 05000366/LER-2004-002, Unplanned Group 2 PCIS Isolation from a Water Level Transient Following Manual Reactor Scram + (Unplanned Group 2 PCIS Isolation from a Water Level Transient Following Manual Reactor Scram)
- 05000353/FIN-2017004-01 + (Unplanned HPCI Inoperability Due to Isolating All Suction Sources During Post-Maintenance Te s t i n g)
- ENS 54188 + (Unplanned High Pressue Coolant Injection Inoperability)
- 05000354/FIN-2009003-02 + (Unplanned High Pressure Coolant Injection Unavailabilty Due to Troubleshooting)
- 05000341/LER-2021-002-01, Unplanned Inoperability of High Pressure Coolant Injection System Due to an Inverter Circuit Failure + (Unplanned Inoperability of High Pressure Coolant Injection System Due to an Inverter Circuit Failure)
- 05000341/LER-2021-002, Unplanned Inoperability of High Pressure Coolant Injection System Due to an Inverter Circuit Failure + (Unplanned Inoperability of High Pressure Coolant Injection System Due to an Inverter Circuit Failure)
- 05000315/FIN-2014005-02 + (Unplanned Inoperability of the AB Fuel Oil Storage Tank during Maintenance)
- 05000331/LER-2005-004, Unplanned Inoperability of the High Pressure Coolant Injection Pump + (Unplanned Inoperability of the High Pressure Coolant Injection Pump)
- ENS 45284 + (Unplanned Inoperability of the High Pressure Core Spray System)
- Information Notice 1997-36, Unplanned Intakes by Worker of Transuranic Airborne Radioactive Materials and External Exposure Due to Inadequate Control of Work + (Unplanned Intakes by Worker of Transuranic Airborne Radioactive Materials and External Exposure Due to Inadequate Control of Work)
- Information Notice 1992-75, Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants + (Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants)
- ENS 46578 + (Unplanned Iodine-131 Dose to an Embryo)
- ENS 48784 + (Unplanned Iodine-131 Dose to an Embryo)
- ENS 46157 + (Unplanned Iodine-131 Dose to an Embryo)
- ENS 50130 + (Unplanned Isolation of Reactor Building Ventilation Radiation Monitor)
- 05000263/LER-2006-001, Unplanned LCO Due to Emergency Filter Flexible Connector Failure + (Unplanned LCO Due to Emergency Filter Flexible Connector Failure)
- 05000387/LER-2023-002, Unplanned Lnoperability of the High Pressure Coolant Injection (HPCI) System Due Failure of the HPCI Turbine Stop Valve to Fully Close, Most Likely Due to Internal Corrosion and + (Unplanned Lnoperability of the High Pressure Coolant Injection (HPCI) System Due Failure of the HPCI Turbine Stop Valve to Fully Close, Most Likely Due to Internal Corrosion And.)
- 05000263/FIN-2008002-03 + (Unplanned Loss of 345kV Power Source)
- 05000263/LER-2002-004, Unplanned Loss of Both Trains of Control Room Ventilation During Auto Start Testing Due to Timing Circuit Relay Failure + (Unplanned Loss of Both Trains of Control Room Ventilation During Auto Start Testing Due to Timing Circuit Relay Failure)
- ENS 49191 + (Unplanned Loss of Communications Due to Offsite Fiber Optic Cable Damage)
- ENS 51955 + (Unplanned Loss of Emergency Assessment Capability)
- ENS 53143 + (Unplanned Loss of Emergency Response Equipment Due to Loss of Plant Computer)
- ENS 52937 + (Unplanned Loss of Emergency Response Equipment)
- ENS 53118 + (Unplanned Loss of Emergency Response Equipment)
- ENS 53656 + (Unplanned Loss of Emergency Response Equipment)
- ENS 53105 + (Unplanned Loss of Multiple Radiation Monitors During Maintenance)
- 05000275/FIN-2011003-03 + (Unplanned Loss of Preferred Offsite Power Due to the Failure to Follow Work Instructions)
- 05000275/FIN-2011003-02 + (Unplanned Loss of Preferred Offsite Power Due to Less than Adequate Work Planning)
- ENS 51343 + (Unplanned Loss of Primary and Backup Meteorological Instrumentation)