On November 26, 2017, at 1225 Eastern Standard Time (EST), the Watts Bar Nuclear Plant (
WBN) Unit 2 experienced an unplanned
ECCS discharge to the Unit 2
Reactor Coolant System (
RCS) while de-pressurized, in Mode 5, with the Pressurizer vented to the Pressurizer Relief Tank.
ECCS injection via the
Boron Injection flow path occurred during planned Safety Injection system Engineered Safety Features Actuation System (
ESFAS) testing. The
Boron Injection flow path should have been isolated and should not have resulted in any injection flow to the Unit 2
RCS. Since the injection was not a part of the pre-planned test this is reportable under 10 CFR 50.72(b)(2)(iv), System Actuation.
All other systems responded as expected in accordance with the ESFAS testing procedure. The unintended ECCS injection flow was isolated and flow through the Boron Injection path was verified to be stopped at 1232 EST. The Unit 2 Pressurizer level and pressure remained below any limits and no safety limits were challenged.
NRC Resident Inspector has been notified.