Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-14-0342, Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites + (Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites)
- NL-14-0184, Units 1 and 2, Six-Month Status Report of the Implementation of Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) + (Units 1 and 2, Six-Month Status Report of the Implementation of Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051))
- 0CAN021103, Units 1 and 2, Spent Fuel Storage Radioactive Effuent Release Report for 2010 + (Units 1 and 2, Spent Fuel Storage Radioactive Effuent Release Report for 2010)
- 0CAN021203, Units 1 and 2, Spent Fuel Storage Radioactive Effluent Release Report for 2011 + (Units 1 and 2, Spent Fuel Storage Radioactive Effluent Release Report for 2011)
- 0CAN021404, Units 1 and 2, Spent Fuel Storage Radioactive Effluent Release Report for 2013 + (Units 1 and 2, Spent Fuel Storage Radioactive Effluent Release Report for 2013)
- L-2015-184, Units 1 and 2, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 17 + (Units 1 and 2, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 17)
- L-HU-06-014, Units 1 and 2, Summary of Nuclear Property Insurance + (Units 1 and 2, Summary of Nuclear Property Insurance)
- LR-N09-0295, Units 1 and 2, Supplement to License Amendment Request S09-06, Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code Components + (Units 1 and 2, Supplement to License Amendment Request S09-06, Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code Components)
- NL-12-1192, Units 1 and 2, Technical Specification Revision Request for TS 3.7.14, Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System + (Units 1 and 2, Technical Specification Revision Request for TS 3.7.14, Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System)
- ML033250556 + (Units 1 and 2, Technical Specifications, Re Completion Time from 24 Hours to 7 Days for One Inoperable Instrument Bus Inverter)
- 0CAN021204, Units 1 and 2, Third Five-Year Surveillance of the First Ventilated Storage Cask + (Units 1 and 2, Third Five-Year Surveillance of the First Ventilated Storage Cask)
- NL-07-0339, Units 1 and 2, Unit 1 Cycle 21 Core Operating Limits Report - Revision 1, Unit 2 Cycle 18 Core Operating Limits Report - Revision 1 + (Units 1 and 2, Unit 1 Cycle 21 Core Operating Limits Report - Revision 1, Unit 2 Cycle 18 Core Operating Limits Report - Revision 1)
- ML14028A199 + (Units 1 and 2, Unsatisfactory Blind Quality Assurance Drug Testing Samples)
- NL-21-0042, Units 1 and 2, Vogtle Electric Generating Plant - Units 1 and 2, Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System + (Units 1 and 2, Vogtle Electric Generating Plant - Units 1 and 2, Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System)
- EPID:L-2021-LLA-0109 + (Units 1 and 2, Vogtle Electric Generating Plant - Units 1 and 2, Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System)
- ML092450037 + (Units 1 and 2, and Watts Bar, Units 1 and 2, Notification of Submittal of Latest Revision of TVAs Organization Topical Report, TVA-NPOD89-A on 09/14/09, Instead of the Originally Planned Date 08/29/09)
- 0CAN102102, Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis + (Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis)
- 0CAN041301, Units 1 and 2: Response to an Apparent Violation in Inspection Report Nos. 05000313-13-503 and 05000368-13-503; EA-12-275 + (Units 1 and 2: Response to an Apparent Violation in Inspection Report Nos. 05000313-13-503 and 05000368-13-503; EA-12-275)
- 0CAN091305, Units 1 and 2: Unsatisfactory Blind Quality Assurance Drug Testing Samples + (Units 1 and 2: Unsatisfactory Blind Quality Assurance Drug Testing Samples)
- ML063170443 + (Units 1 and 2: and Watts Bar Nuclear Plant, Unit 1, Response to Bl 05-002 Emergency Preparedness and Response Actions for Security Based Events)
- NL-16-2707, Units 1 and 2; Fourth 10-year Interval In-service Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements (NL-16-2707) + (Units 1 and 2; Fourth 10-year Interval In-service Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements (NL-16-2707))
- ML19098A034 + (Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins)
- IR 05000368/2020010 + (Units 1 and 2; River Bend Station; and Waterford Unit 3 - NRC Confirmatory Order (EA-17-132 and EA-17-153) Follow-up Inspection Report 05000416/2020011,05000313,0500368/2020010,5000458/2020010,05000382/2020011)
- ML16225A633 + (Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Relief Request for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (TAC Nos. MF7754-MF7760))
- ML082280073 + (Units 1& 2 - NRC Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operator Licensing Examinations)
- ML20261A342 + (Units 1&2 Control Bldg-Control RM Reflected Ceiling Plan)
- ML041200439 + (Units 1&2, Request for Additional Information, Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. TAC Nos MB9560, MB9561, MB9558, and MB9559)
- ONS-2017-009, Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events + (Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events)
- ENOC-09-00021, Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses + (Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses)
- ML091200167 + (Units 1, 2 & 3; North Anna, Units 1 & 2 and Surry Power, Units 1 & 2 - Submittal of Dominions Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, & Independent Spent Fuel Storage Installation (Isfsi))
- ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 + (Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006)
- ML23177A252 + (Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary)
- ML041260467 + (Units 1, 2 and 3 - APS Commitment for CEDM Nozzle Inspections for First Revised NRC Order EA-03-009)
- ML040780813 + (Units 1, 2 and 3 - Liquid Release Update to the 2002 Annual Radioactive Effluent Release (Arer) Report)
- ML043070611 + (Units 1, 2 and 3 - Response to NRC Request for Additional Information Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors)
- ML061770163 + (Units 1, 2 and 3 - Technical Specifications (TS) Changes TS-431 & TS-418 Extended Power Uprate (EPU) - Revised Response to NRC Round 2 Requests for Additional Information SPLB-A.1, SPLB-A.2, & SPLB-A.3)
- ML030440385 + (Units 1, 2 and 3 - Technical Specifications (TS) Change 405 Supplement 1 - Decay Time)
- ML030980556 + (Units 1, 2 and 3 Annual Occupational Radiation Exposure Report (Aorer) - January Through December 2002)
- ML050740440 + (Units 1, 2 and 3, 90-Day Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors)
- ML060060427 + (Units 1, 2 and 3, Review Issues for Digital Upgrade of Rps/Esps)
- ML060960056 + (Units 1, 2 and 3; North Anna, Units 1 & 2 and ISFSI; Surry, Units 1 & 2 and ISFSI - Proof of Financial Protection and Guarantee of Payment of Deferred Premiums)
- ML023290371 + (Units 1, 2, & 3 - Emergency Plan Implementing Procedures EPIP-2 Revision 25, EPIP-3 Revision 28, EPIP-4 Revision 27, EPIP-5 Revision 32, EPIP-6 Revision 22, EPIP-7 Revision 20, EPIP-12 Revision 0)
- ML071150366 + (Units 1, 2, & 3 - Fire Protection Program - Post-Fire Operator Manual Actions)
- ML061070632 + (Units 1, 2, & 3 - GENE-0000-0052-3661-01-NP, Test Report 1, Browns Ferry Nuclear Plant; Unit 1, Scale Model Test)
- ML071150369 + (Units 1, 2, & 3 - Submittal of Unit 1 Periodic Inspection Program for License Renewal Procedure in Fulfillment of License Renewal Commitment)
- ML032320267 + (Units 1, 2, & 3 - TS Change 410 - Mode Change Limitations Using Consolidated Line Item Improvement Process)
- ML081760295 + (Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Confirmation of Commitment Completions)
- ML061070627 + (Units 1, 2, & 3 - Technical Specifications Change Nos. TS-418 and TS-431 - Request for Extended Power Uprate (EPU) Operation - Steam Dryer Scale Model Test Report)
- ML062090071 + (Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 6 Request for Additional Information)
- ML071130078 + (Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Supplemental Response to Requests for Additional Information (RAI))
- ML061040397 + (Units 1, 2, & 3 - Technical Specifications (TS) Change TS-447 - Follow-up to Second Request for Additional Information (RAI) - Extension of Channel Calibration Surveillance Requirement Performance Frequency & Allowable Value Revision)