Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Units 1&2 Control Bldg-Control RM Reflected Ceiling Plan". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20261A342  + (Units 1&2 Control Bldg-Control RM Reflected Ceiling Plan)
  • ML041200439  + (Units 1&2, Request for Additional Information, Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. TAC Nos MB9560, MB9561, MB9558, and MB9559)
  • ONS-2017-009, Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events  + (Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events)
  • ENOC-09-00021, Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses  + (Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses)
  • ML091200167  + (Units 1, 2 & 3; North Anna, Units 1 & 2 and Surry Power, Units 1 & 2 - Submittal of Dominions Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, & Independent Spent Fuel Storage Installation (Isfsi))
  • ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006  + (Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006)
  • ML23177A252  + (Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary)
  • ML041260467  + (Units 1, 2 and 3 - APS Commitment for CEDM Nozzle Inspections for First Revised NRC Order EA-03-009)
  • ML040780813  + (Units 1, 2 and 3 - Liquid Release Update to the 2002 Annual Radioactive Effluent Release (Arer) Report)
  • ML043070611  + (Units 1, 2 and 3 - Response to NRC Request for Additional Information Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors)
  • ML061770163  + (Units 1, 2 and 3 - Technical Specifications (TS) Changes TS-431 & TS-418 Extended Power Uprate (EPU) - Revised Response to NRC Round 2 Requests for Additional Information SPLB-A.1, SPLB-A.2, & SPLB-A.3)
  • ML030440385  + (Units 1, 2 and 3 - Technical Specifications (TS) Change 405 Supplement 1 - Decay Time)
  • ML030980556  + (Units 1, 2 and 3 Annual Occupational Radiation Exposure Report (Aorer) - January Through December 2002)
  • ML050740440  + (Units 1, 2 and 3, 90-Day Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors)
  • ML060060427  + (Units 1, 2 and 3, Review Issues for Digital Upgrade of Rps/Esps)
  • ML060960056  + (Units 1, 2 and 3; North Anna, Units 1 & 2 and ISFSI; Surry, Units 1 & 2 and ISFSI - Proof of Financial Protection and Guarantee of Payment of Deferred Premiums)
  • ML023290371  + (Units 1, 2, & 3 - Emergency Plan Implementing Procedures EPIP-2 Revision 25, EPIP-3 Revision 28, EPIP-4 Revision 27, EPIP-5 Revision 32, EPIP-6 Revision 22, EPIP-7 Revision 20, EPIP-12 Revision 0)
  • ML071150366  + (Units 1, 2, & 3 - Fire Protection Program - Post-Fire Operator Manual Actions)
  • ML061070632  + (Units 1, 2, & 3 - GENE-0000-0052-3661-01-NP, Test Report 1, Browns Ferry Nuclear Plant; Unit 1, Scale Model Test)
  • ML071150369  + (Units 1, 2, & 3 - Submittal of Unit 1 Periodic Inspection Program for License Renewal Procedure in Fulfillment of License Renewal Commitment)
  • ML032320267  + (Units 1, 2, & 3 - TS Change 410 - Mode Change Limitations Using Consolidated Line Item Improvement Process)
  • ML081760295  + (Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Confirmation of Commitment Completions)
  • ML061070627  + (Units 1, 2, & 3 - Technical Specifications Change Nos. TS-418 and TS-431 - Request for Extended Power Uprate (EPU) Operation - Steam Dryer Scale Model Test Report)
  • ML062090071  + (Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 6 Request for Additional Information)
  • ML071130078  + (Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Supplemental Response to Requests for Additional Information (RAI))
  • ML061040397  + (Units 1, 2, & 3 - Technical Specifications (TS) Change TS-447 - Follow-up to Second Request for Additional Information (RAI) - Extension of Channel Calibration Surveillance Requirement Performance Frequency & Allowable Value Revision)