Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 0CAN111404, Units 1 and 2 - Renew Quality Assurance Program Approval for Radioactive Material Packages + (Units 1 and 2 - Renew Quality Assurance Program Approval for Radioactive Material Packages)
- ML13246A103 + (Units 1 and 2 - Report Per 10 CFR 50.46, Changes to or Errors in an Evaluation Model)
- ML043230288 + (Units 1 and 2 - Request for Additional Information Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors)
- NOC-AE-04001793, Units 1 and 2 - Request for Additional Information Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors. + (Units 1 and 2 - Request for Additional Information Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors.)
- ML091180301 + (Units 1 and 2 - Request for Additional Information (RAI) Regarding Revisions to Emergency Action Levels)
- NL-14-0330, Units 1 and 2 - Request for Extension of Flood Hazard Reevaluation Report Due Date Requested by NRC Letter Dated March 12. 2012 + (Units 1 and 2 - Request for Extension of Flood Hazard Reevaluation Report Due Date Requested by NRC Letter Dated March 12. 2012)
- ML14335A623 + (Units 1 and 2 - Request for Technical Specification Amendment Adoption of Previously NRC-Approved Generic Technical Specification Changes and Other Changes)
- ML071280396 + (Units 1 and 2 - Request for Withdrawal of Topical Report DPC-NE-2001 P-A, Fuel Mechanical Reload Analysis Methodology for Mark-BW Fuel, October 1990)
- ML041320209 + (Units 1 and 2 - Response to Inspection Reports 50-313/01-06 and 50-368/01-06)
- NL-15-0187, Units 1 and 2 - Response to NRC Regulatory Issue Summary 2014-13 + (Units 1 and 2 - Response to NRC Regulatory Issue Summary 2014-13)
- ML14206A920 + (Units 1 and 2 - Response to NRC Request for Additional Information, Set 31, Dated June 30, 2014, Related to the License Renewal Application)
- ML082320061 + (Units 1 and 2 - Response to NRC Request for Additional Information Concerning NRC Bulletin 2007-01: Security Officer Attentiveness)
- RS-14-079, Units 1 and 2 - Response to NRC Requests for Additional Information, Set 11, Dated February 18,2014 Related to the License Renewal Application + (Units 1 and 2 - Response to NRC Requests for Additional Information, Set 11, Dated February 18,2014 Related to the License Renewal Application)
- NL-16-0242, Units 1 and 2 - Response to Preliminary Finding from NRC Inspection Report 05000424/2016404 and 05000425/2016404 + (Units 1 and 2 - Response to Preliminary Finding from NRC Inspection Report 05000424/2016404 and 05000425/2016404)
- ML040210789 + (Units 1 and 2 - Response to RAI Regarding Operational Quality Assurance Program, Inspection Program Changes and Clarifications)
- ML083460212 + (Units 1 and 2 - Response to Request for Additional Information for Proposed License Amendment Request Deletion of Main Control Room/Emergency Switchgear Room Bottled Air System from Technical Specifications)
- NL-22-0650, Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program + (Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program)
- NL-16-0784, Units 1 and 2 - Response to Request for Additional Information for TSTF-312. Enclosure 2 Excerpts from Calculation SM-96-1064-001 + (Units 1 and 2 - Response to Request for Additional Information for TSTF-312. Enclosure 2 Excerpts from Calculation SM-96-1064-001)
- ML070530143 + (Units 1 and 2 - Response to Request for Additional Information (RAI) for Technical Specifications (TS) Change 06-03)
- ML16214A025 + (Units 1 and 2 - Response to Request for Additional Information for TSTF-312)
- ML17255A824 + (Units 1 and 2 - Response to Request for Voluntary Response to Petition Re High Energy Line Break in Main Stream Isolation Value Room)
- NL-19-1532, Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors + (Units 1 and 2 - Response to Requests for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures. Systems and Components for Nuclear Power Reactors)
- ML23011A280 + (Units 1 and 2 - Response to Requests for Additional Information (Rals) Regarding License Amendment Request 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk Informed .)
- NL-16-0086, Units 1 and 2 - Response to Third Request for Additional Information Regarding SNC License Amendment Request for TSTF-523, Revision 2 + (Units 1 and 2 - Response to Third Request for Additional Information Regarding SNC License Amendment Request for TSTF-523, Revision 2)
- ML040760899 + (Units 1 and 2 - Review of Draft Safety Evaluation for Duke Topical Report DPC-NE-1005P, Nuclear Design Methodology Using CASMO-4/SIMULATE-3 Mox)
- ML043580225 + (Units 1 and 2 - Revised Physical Security Plan)
- 0CAN101301, Units 1 and 2 - Revision 16 of the ANO Security Plan + (Units 1 and 2 - Revision 16 of the ANO Security Plan)
- ML073340942 + (Units 1 and 2 - Revision to Correspondence Mailing List for Nuclear Management Company, LLC and Contact Information for Electronic Distribution of Correspondence)
- NOC-AE-04001809, Units 1 and 2 - Revision to Plant Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan + (Units 1 and 2 - Revision to Plant Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan)
- ML043100113 + (Units 1 and 2 - Revision to Plant Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan)
- NOC-AE-04001783, Units 1 and 2 - Revision to South Texas Project Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan + (Units 1 and 2 - Revision to South Texas Project Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan)
- ML042580028 + (Units 1 and 2 - Revision to South Texas Project Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan)
- ML13276A048 + (Units 1 and 2 - Second Progress Update on Improved Flood Mitigation System Project)
- NOC-AE-05001842, Units 1 and 2 - Semiannual Fitness for Duty Program Performance Report for the Second Half of 2004 + (Units 1 and 2 - Semiannual Fitness for Duty Program Performance Report for the Second Half of 2004)
- ML050380400 + (Units 1 and 2 - Semiannual Fitness for Duty Program Performance Report for the Second Half of 2004)
- NL-16-2494, Units 1 and 2 - Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from . + (Units 1 and 2 - Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from .)
- ML17349A991 + (Units 1 and 2 - Staff Review of Mitigating Strategies Assessment Report of the Impact of the Re-Evaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC Nos. MF7843 and MF7844, .)
- L-2018-067, Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table + (Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table)
- RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality + (Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality)
- RS-10-023, Units 1 and 2 - Supplement to Request for License Amendment Request to Adopt TSTF-490 + (Units 1 and 2 - Supplement to Request for License Amendment Request to Adopt TSTF-490)
- RS-11-094, Units 1 and 2 - Supplement to the Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations + (Units 1 and 2 - Supplement to the Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations)
- RS-14-336, Units 1 and 2 - Supplemental Commitment Related to the October 31, 2014 Response to NRC Request for Additional Information, Set 42, Dated October 10, 2014, Related to License Renewal Application + (Units 1 and 2 - Supplemental Commitment Related to the October 31, 2014 Response to NRC Request for Additional Information, Set 42, Dated October 10, 2014, Related to License Renewal Application)
- RS-13-242, Units 1 and 2 - Supplemental Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate + (Units 1 and 2 - Supplemental Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate)
- ML042570142 + (Units 1 and 2 - Supplemental Response to the Design Basis Threat Order Physical Security Plans - NRC Order EA-03-086)
- ML042590061 + (Units 1 and 2 - Supplemental Response to the Design Basis Threat Order Physical Security Plans - NRC Order EA-03-086)
- RS-15-060, Units 1 and 2 - Supplemment and Response to Request for Additional Information Regarding the License Amendment Request to Install New Low Degraded Voltage Relays and Timers on the 4.16kV Engineered Safety Features (ESF) Buses + (Units 1 and 2 - Supplemment and Response to Request for Additional Information Regarding the License Amendment Request to Install New Low Degraded Voltage Relays and Timers on the 4.16kV Engineered Safety Features (ESF) Buses)
- ML042860054 + (Units 1 and 2 - Technical Specification Change No. 04-01 - New Specification for Loss of Power Instrumentation for Emergency Diesel Generator and Auxiliary Feedwater Actuation)
- ML042430463 + (Units 1 and 2 - Technical Specification (TS) Change No. 04-03, Reactor Coolant System (RCS) and Emergency Core Cooling System (ECCS) Enhancements)
- ML042430467 + (Units 1 and 2 - Technical Specification (TS) Change No. 02-01, Revision 1 - Nominal Trip Setpoints for Reactor Protection System (RPS) and Engineered Safety Features (ESF) Instrumentation)
- ML072360294 + (Units 1 and 2 - Technical Specifications (TS) Change 06-03 Ultimate Heat Sink (UHS) Temperature Increase and Elevation Changes - Request for Information (RAI) No. 2 Supplement)
- ML051190262 + (Units 1 and 2 - Technical Specifications (TS) Change 02-01, Revision 1, Response to Request for Additional Information (RAI))