Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 44588 + (Unit 2 Manual Reactor Trip Due to Jellyfish Intrusion)
- 05000282/FIN-2012002-08 + (Unit 2 Manual Reactor Trip During Shutdown for Outage 2R27)
- ENS 46482 + (Unit 2 Manual Reactor Trip During Startup)
- 05000254/FIN-2010004-01 + (Unit 2 Manual Scram)
- ENS 48496 + (Unit 2 Manual Scram Due to Loss of the Integrated Control System)
- ENS 45391 + (Unit 2 Manually Scrammed After Trip of an Operating Condensate Pump and Rapidly Lowering Rvwl)
- ENS 48651 + (Unit 2 Manually Tripped After Two Shutdown Control Rods Unexpectedly Dropped During Surveillance Testing)
- ML19260D874 + (Unit 2 Monthly Operating Rept for Jan 1980.Supporting Documentation for Both Units Encl)
- 05000455/FIN-2008002-03 + (Unit 2 Notice of Unusual Event Due to Loss of Both System Auxiliary Transformers)
- ML033090442 + (Unit 2 Notification of Full Compliance with Order EA-03-038, Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel)
- ML20101L787 + (Unit 2 Offsite Dose Calculation Manual)
- 05000413/FIN-2012009-02 + (Unit 2 Offsite Power Circuits Inoperable Due to Improper Unit 1 Zone G Modification)
- ML19308C395 + (Unit 2 Operating Procedure 2101-1.1, Nuclear Plant Limits & Precautions, Revision 4)
- ML19224B175 + (Unit 2 Operating Procedure 2102-1.1,Revision 19:unit Heatup)
- ML19224B177 + (Unit 2 Operating Procedure 2102-1.2,Revision 6:approach to Criticality)
- ML19224B180 + (Unit 2 Operating Procedure 2102-1.3,Revision 14:unit Startup)
- ML19224B182 + (Unit 2 Operating Procedure 2103-1.1,Revision 9:filling & Venting Reactor Coolant Sys)
- ML19208A123 + (Unit 2 Operating Procedure 2103-1.3,Revision 3, Pressurizer Operation)
- ML19224B183 + (Unit 2 Operating Procedure 2103-1.3,Revision 3:pressurizer Operation)
- ML19208A124 + (Unit 2 Operating Procedure 2104-1.2,Revision 13, Makeup & Purification Sys)
- 05000368/LER-2004-001, Unit 2 Operation Prohibited by Technical Specifications Due to an Inoperable Channel of Wide-Range Containment Water Level Instrumentation + (Unit 2 Operation Prohibited by Technical Specifications Due to an Inoperable Channel of Wide-Range Containment Water Level Instrumentation)
- ML20262H624 + (Unit 2 Penetration Area El 78 Ft Fire Barriers Valve Cont Ctrs & 480V Press Htr Bus Arrangement:Electrical. Sheet 1 of 1)
- ML20262H627 + (Unit 2 Penetration Area Trays El 78 Ft Arrangement: Electrical)
- ML20260J888 + (Unit 2 Penetration Pipe Spools,Table of Dimensions)
- ENS 43173 + (Unit 2 Performed a Ts Required Shutdown)
- ML20024C688 + (Unit 2 Plant Sys Operational Log for 790202-04)
- ML20024C696 + (Unit 2 Plant Sys Operational Log for 790206-11)
- ML20198J564 + (Unit 2 Pressure & Temp Limits Rept)
- 05000457/FIN-2014003-02 + (Unit 2 Pressure Transmitter 2PT-458 Returned to Service Isolated)
- 05000457/FIN-2014004-04 + (Unit 2 Pressurizer Pressure Transmitter 458 Returned to Service with Instrument Isolated)
- 05000317/FIN-2007004-04 + (Unit 2 Pressurizer Safety Valve LOW Lift Setting)
- ENS 49744 + (Unit 2 Pyro Panel Non-Functional Due to Unknown Equipment Problems)
- 05000259/FIN-2009005-04 + (Unit 2 RCIC System Inoperable Beyond the Technical Specification Allowed Outage Time)
- ML22116A127 + (Unit 2 RFI for an NRC Triennial Heat Exchanger/Sink Performance Inspection and RFI IR 05000454/2022002 05000455/2022002)
- 05000272/LER-2020-002, Unit 2 RHR Availability for Emergency Core Cooling in Mode 4 + (Unit 2 RHR Availability for Emergency Core Cooling in Mode 4)
- 05000368/LER-2005-001, Unit 2 Re Reactor Coolant System Pressure Boundary Leakage Due to Primary Water Stress Corrosion Cracking of Pressurizer Heater Sleeves + (Unit 2 Re Reactor Coolant System Pressure Boundary Leakage Due to Primary Water Stress Corrosion Cracking of Pressurizer Heater Sleeves)
- 05000366/LER-2005-002, Unit 2 Re Secondary Containment Bypass Leakage Requirements Exceeded + (Unit 2 Re Secondary Containment Bypass Leakage Requirements Exceeded)
- 05000364/LER-2004-001, Unit 2 Re Technical Specification 3.7.8 Violation Due to Operation with One Train of Service Water Inoperable + (Unit 2 Re Technical Specification 3.7.8 Violation Due to Operation with One Train of Service Water Inoperable)
- ML20245G138 + (Unit 2 Reactor Containment Bldg Integrated Leak Rate Test)
- ENS 43198 + (Unit 2 Reactor Manually Scrammed Due to Decreasing Condenser Vacuum)
- ENS 49977 + (Unit 2 Reactor Pressure Boundary Leakage and Unit Shutdown)
- 05000237/LER-2007-002, Unit 2 Reactor Scram Due to Loss of Feedwater + (Unit 2 Reactor Scram Due to Loss of Feedwater)
- ML062400423 + (Unit 2 Reactor Trip Due to Loss of Reactor Coolant Pump)
- 05000364/LER-2007-001, Unit 2 Reactor Trip During Unit 1 Main Generator Differential Lockout Relay Testing + (Unit 2 Reactor Trip During Unit 1 Main Generator Differential Lockout Relay Testing)
- ENS 46971 + (Unit 2 Reactor Trip Following the Loss of the "B" Main Feedwater (Mfw) Pump)
- 05000306/FIN-2011004-08 + (Unit 2 Reactor Trip due to Mis-operation of Substation Breakers)
- 05000306/FIN-2011003-03 + (Unit 2 Reactor Trip during Severe Weather)
- 05000364/LER-2004-004, Unit 2 Reactor Trips Due to Unblocking of Source Range Permissive Interlock + (Unit 2 Reactor Trips Due to Unblocking of Source Range Permissive Interlock)
- 05000324/FIN-2014002-01 + (Unit 2 Recirculation Loop Flow Exceeding Mismatch Limit)
- ML20063C358 + (Unit 2 Refueling 19 ISI Summary Rept for Form NIS-1)