Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML032100454 + (Unit 1, Tech Spec Pages for License Amendment 219 Modifying Technical Specification 2.1.6)
- ML041740355 + (Unit 1, Technical Specification Amendment Implementation Period)
- ML023640018 + (Unit 1, Technical Specification Pages for Amendment 42 Missed Surveillances)
- ML041530590 + (Unit 1, Technical Specifications, Reflect Ownership Change)
- RBG-46102, Unit 1, Twelfth Fuel Cycle Core Operating Limits Report (COLR) + (Unit 1, Twelfth Fuel Cycle Core Operating Limits Report (COLR))
- CNRO-2011-00003, Unit 1, Updated Schedule of Submittal of Future License Renewal Applications + (Unit 1, Updated Schedule of Submittal of Future License Renewal Applications)
- NL-06-2088, Unit 1, Vogtle Electric Generating Plant - Units 1 & 2, Revised Page to Enclosure 2 in Response to NRC Request for Additional Information Re Inservice Inspection Alternatives for Reactor Pressure Vessel Examinations + (Unit 1, Vogtle Electric Generating Plant - Units 1 & 2, Revised Page to Enclosure 2 in Response to NRC Request for Additional Information Re Inservice Inspection Alternatives for Reactor Pressure Vessel Examinations)
- RBG-47251, Unit 1, Withdrawal of License Relief Request + (Unit 1, Withdrawal of License Relief Request)
- ML20082H124 + (Unit 1,Cycle 3 Startup Test Rept, Dtd Jul 1991)
- ML20210J176 + (Unit 1,Cycle 9 Alternate Plugging Criteria 90 Day Rept)
- ML20072H342 + (Unit 1,Independent Design Verification Program Final Rept, Fifth Text Submittal)
- ML20206K373 + (Unit 1,Inservice Insp - Exam Summary,880815 to 880914,Refueling Outage 12, Insp Period 2,Second Interval)
- ML20072E367 + (Unit 1,Refueling 21 ISI Summary Rept)
- RBG-32405, Unit 1,Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989 + (Unit 1,Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989)
- ML051230191 + (Unit 1- 2004 Annual Nonradiological Environmental Operating Report (Aneor))
- RBG-47706, Unit 1- Seismic Mitigating Strategies Assessment Report + (Unit 1- Seismic Mitigating Strategies Assessment Report)
- ML11235A636 + (Unit 1-2011-08 Draft Written)
- 05000259/LER-2025-002, Unit 1/2 480V Load Shed Logic Division I/Ii Inoperable Longer than Allowed by Technical Specifications + (Unit 1/2 480V Load Shed Logic Division I/Ii Inoperable Longer than Allowed by Technical Specifications)
- 05000254/FIN-2011002-02 + (Unit 1/2 EDG Output Breaker Failure to Unit 2)
- 1CAN101202, Unit 1: Cycle 24 Core Operating Limits Report (Colr), Revision 5 + (Unit 1: Cycle 24 Core Operating Limits Report (Colr), Revision 5)
- ML19065A256 + (Unit 1: Final Confirmatory Survey Summary and Results for the Non-Impacted Land Areas (License DPR-40, Docket No. 50-285))
- RBG-47720, Unit 1: Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools + (Unit 1: Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools)
- ML062000075 + (Unit 1; Dresden,Units 2 and 3;LaSalle, Units 1 and 2;Limerick, Units 1 and 2; Oyster Creek, Peach Botton, Units 2 and 3; Quad Cities, Units 1 and 2; TMI, Unit 1; and Zion, Units 1 and 2 - Use of Protected Telecommunications)
- ML16222A787 + (Unit 1; and Quad Cities Nuclear Power Station, Units 1 and 2 - Review of Certified Fuel Handler Training and Retraining Program)
- 05000254/FIN-2009002-03 + (Unit 1F Drywell Cooler Improper Restoration From Maintenance)
- ML20024C488 + (Unit 2)
- ENS 40557 + (Unit 2 Automatic Feedwater Isolation System (Afis) Declared Inoperable)
- ENS 41293 + (Unit 2 Manually Tripped to Remove Failing Condensate Pump from Service)
- 05000282/FIN-2012003-01 + (Unit 2 Reactor Trip Due to Operation of LOW Pressure Turbine Outside ITS Design)
- RA21-029, Unit 2 - 2020 Annual Radioactive Effluent Release Report + (Unit 2 - 2020 Annual Radioactive Effluent Release Report)
- WBL-22-021, Unit 2 - 2021 Annual Radiological Environmental Operating Report + (Unit 2 - 2021 Annual Radiological Environmental Operating Report)
- PLA-8076, Unit 2 - 21st Refueling Outage Owners Activity Report (PLA-8076) + (Unit 2 - 21st Refueling Outage Owners Activity Report (PLA-8076))
- NL-12-0067, Unit 2 - 2R15 Inservice Inspection Report Summary + (Unit 2 - 2R15 Inservice Inspection Report Summary)
- L-12-458, Unit 2 - 2R16 Steam Generator F* (F Star) Report + (Unit 2 - 2R16 Steam Generator F* (F Star) Report)
- ML23341A002 + (Unit 2 - Acceptance of the License Renewal Application)
- ML091960112 + (Unit 2 - Additional Information Regarding WBN Unit 2 Corrective Action Programs)
- ML091120183 + (Unit 2 - Additional Information Regarding WBN Unit 2 Corrective Action Programs)
- WBL-24-020, Unit 2 - Annual Non-Radiological Environmental Operating Report - 2023 + (Unit 2 - Annual Non-Radiological Environmental Operating Report - 2023)
- AEP-NRC-2021-47, Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections + (Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections)
- ML102290075 + (Unit 2 - Change to Developmental TS Section 4.2.2, Control Rod Assemblies)
- AEP-NRC-2019-13, Unit 2 - Changes Made to the Donald C. Cook Nuclear Plant Security Plan, Revision 17 + (Unit 2 - Changes Made to the Donald C. Cook Nuclear Plant Security Plan, Revision 17)
- ML052380128 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
- ML052070143 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
- ML052020047 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
- ML051930163 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
- ML050630231 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
- ML050630569 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
- ML052940199 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
- ML051890489 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
- ML053000226 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
- ML052520245 + (Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors)