Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058M082 + (Transient Analysis Methodology for Wolf Creek Generating Station Technical Evaluation)
- ML19332A170 + (Transient Analysis of Coolant Flow & Heat Transfer in LMFBR Piping Sys)
- ML20059K003 + (Transient Analysis of Pius Advanced Reactor Design W/ TRAC-PF1/MOD2 Code, Presented at 931026-28 Meeting in Bethesda,Md)
- ML20211D993 + (Transient Assessment Program Rept for Rancho Seco Trip,Loss of Integrated Control Sys Power on 851226,Transient Assessment Program RS-86-01)
- ML20211E015 + (Transient Assessment Program Rept for Rancho Seco Reactor Trip on High Pressure,Followed by Cooldown Transient on 851002,Transient Assessment Program RS-86-05)
- ML20211E032 + (Transient Assessment Program Rept for Rancho Seco Reactor Trip on 810617,Transient Assessment Program RS-82-04)
- ML20211E000 + (Transient Assessment Program Rept on Crystal River Unit 3 Reactor Trip of 810616)
- ML20211E065 + (Transient Assessment Program Rept,Davis-Besse Unit 1 Reactor Trip on High Flux,840302)
- ML19305A847 + (Transient Assessment Rept,Reactor Trip on 800226, Preliminary Rept)
- ML19317H489 + (Transient Boron Concentration Analysis in TMI-2 Mini-Decay Heat Removal Sys (Mdhrs))
- ML20203H366 + (Transient Clearing of Air in Loop Seal)
- 05000293/FIN-2011003-01 + (Transient Combustible Loading in SLC Room in Excess of the Fire Hazards Analysis Limit)
- ML051520149 + (Transient Combustible Materials in Containment & Turbine Building Without Administrative Controls)
- 05000416/FIN-2011002-01 + (Transient Combustible Stored in the Fire Exclusion Zone Near the Independent Spent Fuel Storage Installation)
- 05000247/FIN-2009005-04 + (Transient Combustibles Stored on the ISFSI pad)
- ML19308C024 + (Transient Committee Rept on 780320 Transient at Rancho Seco. Total Nonnuclear Instrumentation Y Power Supply Loss Caused by Inoperable Fuse.New Procedures Written for Loss of NNI-X & NNI-Y Power)
- ML20027D224 + (Transient Core Debris Bed Heat Removal Experiments & Analysis)
- ML19312E269 + (Transient Critical Heat Flux & Blowdown Heat Transfer Studies)
- ML19343B005 + (Transient Critical Heat Flux and Blowdown Heat Transfer Studies)
- ML20059A428 + (Transient Drainage (Ponding Analysis))
- Information Notice 1986-04, Transient Due to Loss of Power to Intergrated Control System at a Pressurized Water Reactor Designed by Babcock & Wilcox + (Transient Due to Loss of Power to Intergrated Control System at a Pressurized Water Reactor Designed by Babcock & Wilcox)
- ML20214T168 + (Transient Fire Environment Cable Damageability Test Results: Phase 1)
- 05000261/FIN-2013005-02 + (Transient Materials Not Removed from Containment Prior to Reactor Startup)
- 05000266/FIN-2012004-06 + (Transient Materials Not Removed from Containment Prior to Reactor Startup)
- ML23037A947 + (Transient Methodologies SE and Graphite Meeting Summary)
- ML20008E772 + (Transient Natural Convection in an Internally Heated Fluid Layer.Topical Report June 1975-June 1976)
- ML20056H045 + (Transient Power Distribution Methodology)
- ML20035F373 + (Transient Power Distribution Methodology)
- ML17193A277 + (Transient Pressure Rises Affecting Fracture Toughness Requirements for Bwrs)
- ML20023B021 + (Transient Reactor Analysis Code-BWR Heat Transfer:Model Description & Steady-State Experimental Assessment)
- ML19211A448 + (Transient Reponse of Beams to Correlated Random Excitation Applied at Boundaries)
- ML19321A569 + (Transient Response of B&W Designed Reactors)
- Information Notice 1994-90, Transient Resulting in a Reactor Trip and Multiple Safety Injection System Actuations at Salem + (Transient Resulting in a Reactor Trip and Multiple Safety Injection System Actuations at Salem)
- ML19209B815 + (Transient Shipment Rule Value/Impact Analysis)
- ML17304A769 + (Transient Temp Study for Auxiliary Feedwater B Pump Room)
- ML17304A771 + (Transient Temp Study for Containment Spray Pump Room)
- ML17304A774 + (Transient Temp Study for Electrical Penetration Rooms, Quality Class Q:Safety-Related)
- ML17304A770 + (Transient Temp Study for HPSI Pump Room)
- ML20024D431 + (Transient Testing Program for Model Boiler-2 Facility, Revised Proposal)
- ML19350D740 + (Transient Testing of an IN-CORE Impedance Flow Sensor in a 9-ROD Heated Bundle)
- ML19343C922 + (Transient Testing of an IN-CORE Impedance Flow Sensor in a 9-ROD Heated Bundle)
- ML20125B291 + (Transient W/Failure to Scram)
- ML20009D193 + (Transient W/Failure to Scram Emergency Procedure)
- Regulatory Guide 1.203 + (Transient and Accident Analysis Methods (Formerly Draft Regulatory Guide DG-1096, December 2000, and Draft Regulatory Guide DG-1120, December 2002))
- ML19239A055 + (Transient and Event Checklist ES-301-5)
- ML19224C385 + (Transients & Natural Circulation in Westinghouse Plants)
- ML25343A276 + (Transit Subsidy Program Pia)
- ML20247G411 + (Transit Time Flow Meter Calculations)
- ML19284A505 + (Transition Boiling Heat Transfer in Forced Vertical Flow, Final Rept June 1977-June 1978)
- ML20002D806 + (Transition Briefing Book)
- ML23192A826 + (Transition Core Modeling for Ee and ATF Using Polaris - Parcs)
- ML070090262 + (Transition Letter and Attachment (1/3/07))