ML19239A055
ML19239A055 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 08/23/2019 |
From: | FirstEnergy Nuclear Operating Co |
To: | NRC/RGN-III/DRS/OLB |
DeMarshall J | |
Shared Package | |
ML17215A921 | List: |
References | |
Download: ML19239A055 (3) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Crew-A Facility: Perry Date of Exam: Feb. 2019 Operating Test No.: 2019-1 A E Scenarios P V 1 2 4* x T M P E O I L N Crew Crew Crew Crew T N I T Position Position Position Position A I C L M S A B S A B S A B S A B A T U R T O R T O R T O R T O N Y (*)M(*)
O C P O C P O C P O C P T P E R I U RX 2 7 1 3 1 1 0 SRO-I
- 1 NOR 1 1 2 1 1 1 I/C 3,4,5, 3,4,5, 5,6 13 4 4 2 7,8,9 9,10 MAJ 6 6,8 8,10 5 2 2 1 TS 4,5 2,3 4 0 2 2 RX 2 1 1 1 0 RO #1 NOR 1 2 2 1 1 1 I/C 3,7,9 3,5 4,9,11 8 4 4 2 MAJ 6 6,8 8,10 5 2 2 1 TS 0 0 2 2 Rx 7 1 1 1 0 RO #2 NOR 1 1 1 1 1 I/C 4,5,8 4,5,9, 7 4 4 2 10 MAJ 6 6,8 3 2 2 1 TS 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
- Surrogate will be utilized in Scenario #4 NUREG 1021, Rev. 11 Page 26 of 33 FENOC Facsimile
ES-301 Transient and Event Checklist Form ES-301-5 Crew-B Facility: Perry Date of Exam: Feb. 2019 Operating Test No.: 2019-1 A E Scenarios P V 1 2 x x T M P E O I L N Crew Crew Crew Crew T N I T Position Position Position Position A I C L M S A B S A B S A B S A B A T U R T O R T O R T O R T O N Y (*)M(*)
O C P O C P O C P O C P T P E R I U RX 2 7 2 1 1 0 SRO-U
- 1 NOR 1 1 2 1 1 1 I/C 3,4,5, 3,4,5, 11 4 4 2 7,8,9 9,10 MAJ 6 6,8 3 2 2 1 TS 4,5 2,3 4 0 2 2 RX 2 1 1 1 0 RO #3 NOR 1 1 1 1 1 I/C 3,7,9 3,5 5 4 4 2 MAJ 6 6,8 3 2 2 1 TS 0 0 2 2 Rx 7 1 1 1 0 RO #4 NOR 1 1 1 1 1 I/C 4,5,8 4,5,9, 7 4 4 2 10 MAJ 6 6,8 3 2 2 1 TS 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
NUREG 1021, Rev. 11 Page 26 of 33 FENOC Facsimile
ES-301 Transient and Event Checklist Form ES-301-5 Crew-C Facility: Perry Date of Exam: Feb. 2019 Operating Test No.: 2019-1 A E Scenarios P V 1 2 x x T M P E O I L N Crew Crew Crew Crew T N I T Position Position Position Position A I C L M S A B S A B S A B S A B A T U R T O R T O R T O R T O N Y (*)M(*)
O C P O C P O C P O C P T P E R I U RX 2 7 2 1 1 0 SRO-U
- 2 NOR 1 1 2 1 1 1 I/C 3,4,5, 3,4,5, 11 4 4 2 7,8,9 9,10 MAJ 6 6,8 3 2 2 1 TS 4,5 2,3 4 0 2 2 RX 2 1 1 1 0 RO #5 NOR 1 1 1 1 1 I/C 3,7,9 3,5 5 4 4 2 MAJ 6 6,8 3 2 2 1 TS 0 0 2 2 Rx 7 1 1 1 0 RO #6 NOR 1 1 1 1 1 I/C 4,5,8 4,5,9, 7 4 4 2 10 MAJ 6 6,8 3 2 2 1 TS 0 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
NUREG 1021, Rev. 11 Page 26 of 33 FENOC Facsimile