Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML040510008 + (Time Extension Request for Violation Response)
- NG-09-0663, Time Limited Aging Analysis Evaluations for the Duane Arnold License Renewal Project + (Time Limited Aging Analysis Evaluations for the Duane Arnold License Renewal Project)
- ML20259D247 + (Time Post DBA Dose Rate Study Accident Dose Map with Dose Table - Site Plan)
- ML17207A637 + (Time Response Testing of Resistance Temp Detectors)
- ML20207B262 + (Time Scales for Dissolution of Calcite Fracture Fillings & Implications for Saturated Zone Radionuclide Transport at Yucca Mountain,Nv)
- ML032060520 + (Time Scheduling Order, Dated 08/26/02)
- ML20097B429 + (Time Step and Mesh Size Dependencies in the Heat Conduction Solution of a SEMI-IMPLICIT,FINITE Difference Scheme for Transient TWO-PHASE Flow)
- ML20024C675 + (Time Vs Pressure Graph of Reactor Trip & Cooldown on 720423)
- ML20062E041 + (Time for Comm Consideration of Petition for Review of ALAB-502 Filed by Ecology Action of Oswego, & Any Answers Thereto,Is Extended to 781222)
- ML19256A902 + (Time for Commission Consideration of Petition Filed by Ecology Action of Oswego for Review of Decision ALAB-502 Is Extended to 790202)
- ML19256A365 + (Time for Commission Consideration of Petition Filed by Ecology Action of Oswego Seeking Review of Decision ALAB-507 Is Extended to 790112)
- ML19261A333 + (Time for Filing Direct Briefs on Review of Decision ALAB-500 Is Extended Until 790112.Reply Briefs Are Due within 10 Days After That Date)
- ML20062G151 + (Time for Filing of Applicant CPLs Testimony Is Extended to 790116;same Time for Filing Testimony Shall Also Apply to Intervenors & St of Nc)
- ML19261C394 + (Time for NRC Review of 790201 Denial of Enforcement Action Extended Until 790413)
- ML19270G912 + (Time for NRC to Elect to Review ALAB-535 & ALAB-539 Is Extended Until 790604)
- ML20150D073 + (Time in Which Comm May Determine to Review ALAB-489 & ALAB-500 Is Extended to 781208)
- 05000263/LER-2014-004, Time to Energize Loads Greater than Surveillance Requirement + (Time to Energize Loads Greater than Surveillance Requirement)
- ENS 45277 + (Time to Establish Charging Flow Exceeded Thermal Hydraulic Analysis)
- ML19224A400 + (Time within Which Commission May Determine to Review Decision ALAB-509 Is Extended Until 790112)
- WM 07-0051, Time-Limited Aging Analysis Questions and Responses Related to License Renewal Application + (Time-Limited Aging Analysis Questions and Responses Related to License Renewal Application)
- 1CAN051401, Time-Limited Aging Analysis Regarding Reactor Vessel Internals Loss of Ductility for Arkansas Nuclear One, Unit 1 at 60 Years Arkansas Nuclear One Unit 1 + (Time-Limited Aging Analysis Regarding Reactor Vessel Internals Loss of Ductility for Arkansas Nuclear One, Unit 1 at 60 Years Arkansas Nuclear One Unit 1)
- ML17256B190 + (Time-Limited Aging Analysis for the Reactor Vessel Internals Loss of Ductility at 60 Years)
- ML062500411 + (Time.Doc. Re Meeting Attended with the Salem Operations Leadership Team)
- Information Notice 1985-16, Time/Current Trip Curve Discrepancy of ITE/Siemens-Allis Molded Case Circuit Breaker + (Time/Current Trip Curve Discrepancy of ITE/Siemens-Allis Molded Case Circuit Breaker)
- ML13052A781 + (Timeline - Summary of Events)
- ML021970088 + (Timeline Graph)
- ML051030030 + (Timeline for Cook Containment Issue)
- ML053130201 + (Timeline for Enforcement Actions)
- ML19276F244 + (Timeline for Issuance of Regulatory Guide for Volcanic Hazards and Anticipated Stakeholder Involvement)
- ML23045A233 + (Timeline for MRB)
- WO 18-0047, Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term + (Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term)
- ML053070457 + (Timeline of Key Events Related to Reactor Vessel Head Boric Acid Wasteage Rev. 5)
- ML053070366 + (Timeline of Key Events Related to Reactor Vessel Head Boric Acid Wastage Rev. 4)
- ML053070368 + (Timeline of Key Events Related to Reactor Vessel Head Boric Acid Wastage Rev.3, 3-13-02)
- ML080280180 + (Timeline on Byron Thermal Power Issue from P. Lougheed (Riii) to A. Stone (Riii), Et Al)
- 05000313/FIN-2013011-07 + (Timeliness of Emergency Action Level Determination)
- ML071080296 + (Timeliness of Submittals)
- Information Notice 1985-80, Timely Declaration of an Emergency Class, Implementation of an Emergency Plan, and Emergency Notifications + (Timely Declaration of an Emergency Class, Implementation of an Emergency Plan, and Emergency Notifications)
- L-20-010, Timely License Renewal Protection Exemption Request + (Timely License Renewal Protection Exemption Request)
- 05000317/FIN-2007005-01 + (Timely NRC Notification of SRO License Restriction)
- ML23046A029 + (Timely Renewal Exemption 5 Day Memorandum)
- ML24324A005 + (Timely Renewal Letter XCOM1124-07)
- ML23248A260 + (Timely Renewal Letter XSOU8856-01)
- ML20339A628 + (Timely Renewal Letter for Export License PXB227.00)
- ML25175A280 + (Timely Renewal Letter for PXB216.03 (Amendment PXB216.04))
- ML21236A047 + (Timely Renewal Letter for XSNM3773)
- ML21131A050 + (Timely Renewal Letter to Baker Hughes Oilfield Operations LLC PXB169.03)
- ML22203A076 + (Timely Renewal Letter to Baker Hughes Oilfield Operations LLC PXB237.01)
- ML22046A019 + (Timely Renewal Letter to Diversified Scientific Services Inc. XW008-05)
- ML19357A258 + (Timely Renewal Letter to Eaton Corporation XCOM1291-02)
- ML21328A024 + (Timely Renewal Letter to Framatome Inc. XSNM3697-02)