Valve BNHV8812A RWST to RHR Pump A IsolatiValve BNHV8812A RWST to RHR Pump A Isolation is manually closed in OFN RP-017, Control Room Evacuation, in response to a control room fire. Simulated timing assumed approximately 1 minute to close the valve. Discussions with the MOV engineer revealed that the valve takes 600 turns to close. Operations Standing Order 1 limits the number of hand wheel turns to 60 per minute. At a closure rate of 60 turns per minute, it will take a minimum of 10 minutes to close the valve, rather than the assumed 1-minute. The additional 9 minutes necessary to close the valve will delay the completion of subsequent steps. Most significantly, the time to establish charging flow increases from 20 minutes to a minimum of 29 minutes. Thermal hydraulic analysis documented in SA-08-006 assumed the charging flow will be established within 28 minutes. Therefore the time to establish charging flow exceeds that assumed in the thermal hydraulic analysis by at least 1 minute. Compensatory actions have been put in place in order to accomplish this task within the time allowed by the thermal hydraulic analysis.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector.  +
20:00:00, 19 August 2009  +
45,277  +
20:33:00, 19 August 2009  +
20:00:00, 19 August 2009  +
Valve BNHV8812A RWST to RHR Pump A IsolatiValve BNHV8812A RWST to RHR Pump A Isolation is manually closed in OFN RP-017, Control Room Evacuation, in response to a control room fire. Simulated timing assumed approximately 1 minute to close the valve. Discussions with the MOV engineer revealed that the valve takes 600 turns to close. Operations Standing Order 1 limits the number of hand wheel turns to 60 per minute. At a closure rate of 60 turns per minute, it will take a minimum of 10 minutes to close the valve, rather than the assumed 1-minute. The additional 9 minutes necessary to close the valve will delay the completion of subsequent steps. Most significantly, the time to establish charging flow increases from 20 minutes to a minimum of 29 minutes. Thermal hydraulic analysis documented in SA-08-006 assumed the charging flow will be established within 28 minutes. Therefore the time to establish charging flow exceeds that assumed in the thermal hydraulic analysis by at least 1 minute. Compensatory actions have been put in place in order to accomplish this task within the time allowed by the thermal hydraulic analysis.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 19 August 2009  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:11:29, 2 March 2018  +
20:33:00, 19 August 2009  +
false  +
0.0229 d (0.55 hours, 0.00327 weeks, 7.5339e-4 months)  +
20:00:00, 19 August 2009  +
Time to Establish Charging Flow Exceeded Thermal Hydraulic Analysis  +