Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML081430019 + (Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- DCL-08-032, Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems + (Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- ML081340542 + (Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- ML081060097 + (Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- ML081420363 + (Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- ML081120112 + (Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- ML081350609 + (Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- ML081130785 + (Three-Month Response to NRC Generic Letter 08-001, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- SBK-L-08058, Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Energy Core Cooling, Decay Heat Removal, and Containment Spray Systems. + (Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Energy Core Cooling, Decay Heat Removal, and Containment Spray Systems.)
- PLA-6367, Three-Month Response to NRC Generic Letter 2008-01 + (Three-Month Response to NRC Generic Letter 2008-01)
- NL-08-0481, Three-Month Response to NRC Generic Letter 2008-01 + (Three-Month Response to NRC Generic Letter 2008-01)
- ML081540223 + (Three-Month Response to NRC Generic Letter 2008-01)
- ML081560218 + (Three-Month Response to NRC Generic Letter 2008-01)
- ML082840372 + (Three-Month Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal and Containment Spray Systems)
- ML20079N138 + (Three-Sixteen a & B Demonstration Quad-Cities Nuclear Station Mississippi River)
- Information Notice 2005-15, Three-Unit Trip and Loss of Offsite Power at Palo Verde Nuclear Generating Station + (Three-Unit Trip and Loss of Offsite Power at Palo Verde Nuclear Generating Station)
- ML23026A278 + (Three-Year Collective Total Effective Dose Equivalent Per Reactor-Year for 2019-2021 Monitoring Years)
- ML20079B081 + (Three-Yr Business Plan Performance Improvement Initiatives & Projects)
- ML20071P149 + (Three-Yr Business Plan Performance Improvement Initiatives & Projects)
- ML20247M304 + (Three-dimensional Buckling Analysis for AP600 Standard Plant Containment Vessel. Rept Undtd)
- BSEP 08-0060, Three-month Response to GL-08-001, Managing Gas Accumulation in Emergency Core Cooling; Decay Heat Removal, and Containment Spray Systems + (Three-month Response to GL-08-001, Managing Gas Accumulation in Emergency Core Cooling; Decay Heat Removal, and Containment Spray Systems)
- ML113500389 + (Threshold Determination Regarding the Proposed Corporate Restructuring Involving Edf Inc. - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Calvert Cliffs Independent Spent Fuel Storage Installation (Isfsi); Nine Mile Point Nuclear s)
- ML112450212 + (Threshold Determination Under 10 CFR 50.80 - (TAC Nos. ME6269 - ME6287))
- ML111670731 + (Threshold Determination Under 10 CFR 50.80 - Request for Additional Information)
- ML25318A240 + (Threshold Matter Regarding Paragon Energy Solutions LLC - XCOM1373)
- ML20211K214 + (Threshold for Reportable Event)
- ML20114C053 + (Throttled Valve Cavitation & Erosion)
- ML051360296 + (Through 04/13/2005, Quad Cities - Meeting with Exelon Generation Company, LLC, on Steam Dryer Design, Analyses, and Plans for Intallation and Startup Testing of New Steam Dryers at Quad Cities)
- 05000414/LER-2025-004, Through Wall Leak in Letdown Piping + (Through Wall Leak in Letdown Piping)
- ENS 54031 + (Through Wall Leak on Standby Liquid Control System Piping)
- ENS 50711 + (Through Wall Seepage Affecting Rhr System)
- Information Notice 2001-05, Through-Wall Circumferential Cracking of Reactor Pressure Vessel Head Control Rod Drive Mechanism Penetration Nozzles at Oconee Nuclear Station Unit 3 + (Through-Wall Circumferential Cracking of Reactor Pressure Vessel Head Control Rod Drive Mechanism Penetration Nozzles at Oconee Nuclear Station Unit 3)
- ENS 52738 + (Through-Wall Leakage Identified on Reactor Coolant System Pressure Boundary During Testing)
- ENS 54971 + (Through-Wall Leakage Identified on Reactor Coolant System Pressure Boundary During Testing)
- 05000354/LER-2013-003, Through-wall Flaw Discovered on RHR Shutdown Cooling Return Vent Line + (Through-wall Flaw Discovered on RHR Shutdown Cooling Return Vent Line)
- ML20262K488 + (Thrust Block 54 Make Up Line)
- ML19316A232 + (Thrust Movement Monitoring Program for Oconee 1,2 & 3 to Main Steam Bypass to Condenser)
- ML24026A116 + (Thu 0835 NDE for Buried Piping Rehabilitation Polyurea Liners - Framatome)
- ML24026A117 + (Thu 0855 Field Trial of AI-assisted DMW Analysis at Clinton - NDE-TIE - Jan 25, 2024)
- ML24026A119 + (Thu 0855 TVA Ai_Ml Experience)
- ML24026A118 + (Thu 0855 Thiago Field Trial of AI-assisted DMW Analysis at Clinton - NDE-TIE - Jan 25, 2024)
- ML24026A120 + (Thu 0925 Ai ML - NRC Perspective - NRC)
- ML24026A121 + (Thu 0945 Ai ML - NRC Research Progress - ORNL)
- ML21307A105 + (Thurs - NRC Presentation for Counterpart Meeting)
- Information Notice 1992-83, Thurst Limits for Limitorque Actuators and Potential Overstressing of Motor-Operated Valves + (Thurst Limits for Limitorque Actuators and Potential Overstressing of Motor-Operated Valves)
- ML12346A148 + (Ti 182 Phase II Request for Information)
- ML13119A386 + (Ti 182 RFI 2013003_AS Doc)
- ML13282A490 + (Ti 186 (Drm))
- ML13276A553 + (Ti 186 (Rmm))
- ML13101A438 + (Ti 186 Notice of Inspection)
- ML16125A507 + (Ti 191 Issue Matrix)