Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22353A643 + (Target Rock Vendor Inspection Announcement Letter)
- ML18240A173 + (Target Rock'S Response to the U.S. Nuclear Regulatory Commission'S Inspection Report No. 99900060/2018-201 and Notice of Nonconformance)
- Target Set Inspection (Brunswick 2020) + (Target Set)
- Target Set Inspection (Cooper 2019) + (Target Set)
- Target Set Inspection (Dresden 2021) + (Target Set)
- Target Set Inspection (Duane Arnold 2020) + (Target Set)
- Target Set Inspection (Farley 2019) + (Target Set)
- Target Set Inspection (Fermi 2019) + (Target Set)
- Target Set Inspection (Harris 2020) + (Target Set)
- Target Set Inspection (LaSalle 2020) + (Target Set)
- Target Set Inspection (Millstone 2021) + (Target Set)
- Target Set Inspection (North Anna 2021) + (Target Set)
- Target Set Inspection (Oconee 2019) + (Target Set)
- Target Set Inspection (Saint Lucie 2020) + (Target Set)
- Target Set Inspection (Sequoyah 2020) + (Target Set)
- Target Set Inspection (Summer 2021) + (Target Set)
- Target Set Inspection (Surry 2019) + (Target Set)
- Target Set Inspection (Turkey Point 2019) + (Target Set)
- Target Set Inspection (Vogtle 2020) + (Target Set)
- Target Set Inspection (Watts Bar 2020) + (Target Set)
- Target Set Inspection (Wolf Creek 2019) + (Target Set)
- Target Set Inspection (South Texas 2019) + (Target Set)
- Target Set Inspection (Byron 2021) + (Target Set)
- ML13295A659 + (Target Set Inspection - Cover Letter)
- IR 05000336/2010201 + (Target Set Inspection 05000336-10-201 & 05000423-10-201)
- ML102710110 + (Target Set Inspection Report)
- ML14041A153 + (Target Set Inspection Report - Cover Letter)
- ML13319A566 + (Target Set Inspection Report - Cover Letter)
- ML110200034 + (Target Set Inspection Report - Cover Letter)
- IR 05000269/2019413 + (Target Set Inspection Report 05000269/2019413, 05000270/2019413 and 05000287/2019413)
- IR 05000280/2019411 + (Target Set Inspection Report 05000280/2019411 and 05000281/2019411)
- IR 05000321/2010201 + (Target Set Inspection Report 05000321-10-201 and 05000366-10-201)
- IR 05000335/2013201 + (Target Set Inspection Report 05000335-13-201 and 05000389-13-201 - Cover Letter)
- IR 05000348/2013201 + (Target Set Inspection Report 05000348/2013201; and 05000364/2013201 - Cover Letter)
- IR 05000395/2021403 + (Target Set Inspection Report 05000395/2021403)
- IR 05000461/2013203 + (Target Set Inspection Report 05000461/2013-203 - Cover Letter)
- ML14043A348 + (Target Set Inspection Report Cover Letter)
- ML19346E605 + (Target Set Request for Information for Week of November 4, 2019)
- ENS 55904 + (Target Tissue Missed)
- ML053220395 + (Tarp Procedure Non-Compliance (QA Observation 200-0161))
- ML19341A449 + (Task 1 - Analytical Approach,Site-Specific Characteristics at AR Nuclear One)
- ML20127C662 + (Task 1 - Establish Most Probable Hydrogen Generation Event)
- ML20138C444 + (Task 1 Rept on Vols & Characteristics of Highly Radwastes to Be Shipped in Future. Related Handwritten Info Encl)
- ML20330A203 + (Task 10 Attachment - PNNL-SA-151947)
- ML19221A618 + (Task 100: Examination of Controlled Depressurization to Achieve Long-Term Cooling Status in Tmi)
- ML19221A634 + (Task 100:forwards Status Rept on Diagnostic Instrument.Rept Will Be Updated Daily)
- ML19221A625 + (Task 103:determine Events within TMI Primary Sys Insofar as They Might Indicate Core Configuration)
- ML19221A592 + (Task 107:Removal of Airborne Radioactivity from Containment)
- ML19221A590 + (Task 108:Particle Bed Investigation)
- ML19221A589 + (Task 109:assessment of RCS Behavior in Percolating Mode Before Large Amounts of Noncondensibles Buildup)
- ML19221A624 + (Task 10B:Fuel Temp Thermocouple Readings During Pressure Transients from 790409-12)