Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML092380151 + (Submittal of Technical Specifications Bases Revision 50 Update)
- BVY 08-070, Submittal of Technical Specifications Proposed Change No. 273, Supplement 3, Response to Additional RAI Related to Degraded Grid Protection + (Submittal of Technical Specifications Proposed Change No. 273, Supplement 3, Response to Additional RAI Related to Degraded Grid Protection)
- ML082030155 + (Submittal of Technical Specifications Revision Request to Adopt TSTF-448, Rev. 3 Control Room Habitability Program)
- RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication + (Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication)
- ML16060A210 + (Submittal of Technical Specifications for the Armed Forces Radiobiology Research Institute Facility)
- ML11221A162 + (Submittal of Technical Specifications for the Washington State University Research Nuclear Reactor)
- ML073240693 + (Submittal of Tennessee Radioactive Waste License-for-Delivery, No. T-GA003-L07)
- ML15029A601 + (Submittal of Tennessee Storm Water Multi-Sector General Permit TNR050015 - Notice of Intent (Noi) Updated)
- ML110900187 + (Submittal of Tennessee Storm Water Multi-Sector General Permit for Industrial Activities Permit No. TNR050015 Sector 0 Exceedance of the Benchmark Monitoring Requirement)
- CP-200801342, Submittal of Tenth Refueling Outage (2RF10) Steam Generator Inspection 180 Day Report + (Submittal of Tenth Refueling Outage (2RF10) Steam Generator Inspection 180 Day Report)
- CP-200800928, Submittal of Tenth Refueling Outage (2RF10) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval) + (Submittal of Tenth Refueling Outage (2RF10) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval))
- ML063620017 + (Submittal of Terms and Conditions for Smalltooth Sawfish Contained in Draft Biological Opinion for Continued Operation of St. Lucie Nuclear Power Plant)
- ML25159A004 + (Submittal of Terra Innovatum Documents (Wave 1) for Solo Micro-Modular Reactor Pre-Submittal Engagement)
- ML25257A009 + (Submittal of Terra Innovatum Documents (Wave 2) for Solo Micro-Modular Reactor Pre-Submittal Engagement)
- ML25257A008 + (Submittal of Terra Innovatum Documents (Wave 2) for Solo Micro-Modular Reactor Pre-Submittal Engagement)
- ML23025A409 + (Submittal of Terrapower Fuel and Control Assembly Qualification Topical Report)
- ML23080A045 + (Submittal of Terrapower Plume Exposure Pathway Emergency Planning Zone Methodology Topical Report)
- ML23321A036 + (Submittal of Terrapower Plume Exposure Pathway Emergency Planning Zone Methodology Topical Report, Revision 1)
- ML24101A362 + (Submittal of Terrapower Topical Report, Principal Design Criteria for the Natrium Advanced Reactor, Revision 1)
- ML23024A281 + (Submittal of Terrapower Topical Report, Principal Design Criteria for the Natrium Advanced Reactor)
- ML22277A824 + (Submittal of Terrapower, LLC Topical Report, Regulatory Management of Natrium Nuclear Island and Energy Island Design Interfaces)
- ML091870828 + (Submittal of Test Results for Gas-Water Transport Tests)
- ML031060076 + (Submittal of Test Results for Withdrawal of Surveillance Capsule X from Reactor Vessel)
- NG-09-0507, Submittal of Tests, Experiments, Fire Plan and Commitment Changes for 07/14/07 Through 06/01/09 + (Submittal of Tests, Experiments, Fire Plan and Commitment Changes for 07/14/07 Through 06/01/09)
- ML052170351 + (Submittal of Texas A&M University AGN-201M Reactor Answer to the July 19, 2005 Generic Order (EA-05-007) Issued by Office of Nuclear Reactor Regulation)
- RA08-070, Submittal of Third 10-Year Inservice Testing (IST) Interval Program Plan + (Submittal of Third 10-Year Inservice Testing (IST) Interval Program Plan)
- ML070800741 + (Submittal of Third Inservice Inspection (ISI) Interval Program Plan)
- BW090029, Submittal of Third Inservice Inspection (ISI) Interval Program Plan + (Submittal of Third Inservice Inspection (ISI) Interval Program Plan)
- ML090330171 + (Submittal of Third Interval Inservice Inspection (ISI) Owners Activity Reports)
- DCL-2007-548, Submittal of Third Quarter 2007 Report on Discharge Monitoring, in Accordance with Order 90-09 + (Submittal of Third Quarter 2007 Report on Discharge Monitoring, in Accordance with Order 90-09)
- DCL-2012-541, Submittal of Third Quarter 2012 Report on Discharge Monitoring + (Submittal of Third Quarter 2012 Report on Discharge Monitoring)
- ML062850221 + (Submittal of Third Reactor Vessel Surveillance Capsule Report, WCAP-16629-NP, Rev 0)
- B18847, Submittal of Third Reactor Vessel Surveillance Report + (Submittal of Third Reactor Vessel Surveillance Report)
- ML090820492 + (Submittal of Third Ten-Year Inservice Inspection Interval Relief Requests 09-001-11, 09-002-11 and 09-003-11)
- SBK-L-11132, Submittal of Third Ten-Year Interval Inservice Inspection and Second Ten-Year Containment Inservice Inspection Program + (Submittal of Third Ten-Year Interval Inservice Inspection and Second Ten-Year Containment Inservice Inspection Program)
- ML060740319 + (Submittal of Third Ten-Year Interval Inservice Inspection Plan and Inservice Inspection Pressure Test Plan)
- ML051860132 + (Submittal of Third Ten-Year Interval Inservice Inspection Plan and Inservice Inspection Pressure Test Plan)
- ML051890143 + (Submittal of Third Ten-Year Interval Inservice Inspection Plan for Steam Generator Tubing)
- U-604037, Submittal of Third Ten-Year Interval Inservice Inspection Program Plan + (Submittal of Third Ten-Year Interval Inservice Inspection Program Plan)
- ML14167A014 + (Submittal of Thirty-Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 72.210 for Storage of Spent Fuel)
- ML100960045 + (Submittal of Thirty-Day Notification and Lab Analysis for the Exceedance of the Benchmark Monitoring Requirement for Total Recoverable Iron for Storm Water Outfall Nos. 1, 2, 15, and 17)
- ML071770136 + (Submittal of Thirty-Day Report for Loss-Of-Coolant Accident Evaluation Model Changes)
- ML020800631 + (Submittal of Three Mile Island Unit 1 Cycle 14 Startup Report)
- ML15084A135 + (Submittal of Three Mile Island Unit 2 (Docket 72-20) Safety Analysis Update Report 72-20/2015-01 (EM-FMDP-15-015))
- ML25058A495 + (Submittal of Three Mile Island, Unit 2 - Safety Analysis Update Report STI-NLF-RPT--309)
- ML110730141 + (Submittal of Three Mile Island, Unit 2, Safety Analysis Update Report (EM-FMDP-11-024))
- ML13171A100 + (Submittal of Three Revised Specifications from Developmental Revision G of Technical Specification)
- ML19003A292 + (Submittal of Tier 1 and Integrated Final Safety Analysis Report, Revision 0)
- ML16113A020 + (Submittal of Title 10, Code of Federal Regulations 50.59 Summary Report)
- ML21355A202 + (Submittal of Tn Americas LLC Updated Licensing Plans)
- ML19360A054 + (Submittal of Tn Americas LLC Updated Licensing Plans)