U-604037, Submittal of Third Ten-Year Interval Inservice Inspection Program Plan
| ML11269A017 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/15/2011 |
| From: | Bradley Davis Exelon Nuclear, Exelon Generation Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| U-604037 | |
| Download: ML11269A017 (2) | |
Text
Exelon.
Nuclear Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604037 10 CFR 50.55a September 15, 2011 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Submittal of Third Ten-Year Interval Inservice Inspection Program Plan In accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (B&PV), Section Xl, IWA-1400(c), "Owner's Responsibility," Exelon Generation Company, LLC is hereby providing a copy of the Third Ten-Year Interval Inservice Inspection (ISI) Program Plan for Clinton Power Station, Unit 1. The program plan is attached for information only and does not require NRC approval. The third interval began on July 1, 2010, and complies with the 2004 Edition, No Addenda, of the ASME B&PV Code.
There are no regulatory commitments contained within this letter.
If you have any questions concerning this matter, please contact me at (217) 937-2800.
Respectfully, Brian W. Davis Regulatory Assurance Manager Clinton Power Station JLP/blf
Attachment:
Clinton Power Station, Unit 1 ISI Program Plan for the Third Ten-Year Inspection Interval cc:
Illinois Emergency Management Agency -
Division of Nuclear Safety
U.S. Nuclear Regulatory Commission U-604037 ATTACHMENT Clinton Power Station, Unit 1 ISI Program Plan for the Third Ten-Year Inspection Interval