U-604037, Submittal of Third Ten-Year Interval Inservice Inspection Program Plan

From kanterella
Jump to navigation Jump to search
Submittal of Third Ten-Year Interval Inservice Inspection Program Plan
ML11269A017
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/15/2011
From: Bradley Davis
Exelon Nuclear, Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-604037
Download: ML11269A017 (2)


Text

Exelon.

Nuclear Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604037 10 CFR 50.55a September 15, 2011 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Submittal of Third Ten-Year Interval Inservice Inspection Program Plan In accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (B&PV), Section Xl, IWA-1400(c), "Owner's Responsibility," Exelon Generation Company, LLC is hereby providing a copy of the Third Ten-Year Interval Inservice Inspection (ISI) Program Plan for Clinton Power Station, Unit 1. The program plan is attached for information only and does not require NRC approval. The third interval began on July 1, 2010, and complies with the 2004 Edition, No Addenda, of the ASME B&PV Code.

There are no regulatory commitments contained within this letter.

If you have any questions concerning this matter, please contact me at (217) 937-2800.

Respectfully, Brian W. Davis Regulatory Assurance Manager Clinton Power Station JLP/blf

Attachment:

Clinton Power Station, Unit 1 ISI Program Plan for the Third Ten-Year Inspection Interval cc:

Illinois Emergency Management Agency -

Division of Nuclear Safety

U.S. Nuclear Regulatory Commission U-604037 ATTACHMENT Clinton Power Station, Unit 1 ISI Program Plan for the Third Ten-Year Inspection Interval