Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19305C616 + (Steam Generator Tube Rupture Iodine Transport Mechanisms, Monthly Rept for Feb,1980)
- ML20005B282 + (Steam Generator Tube Rupture Iodine Transport Mechanism, Monthly Progress Rept for May 1981)
- ML20209J014 + (Steam Generator Tube Rupture Iodine Transport Mechanisms. Task 1:Experimental Studies)
- ML19341A904 + (Steam Generator Tube Rupture Iodine Transport Mechanisms, Monthly Progress Rept for June 1980)
- ML19323D418 + (Steam Generator Tube Rupture Iodine Transport Mechanisms, Monthly Progress Rept for Apr 1980)
- ML19318B857 + (Steam Generator Tube Rupture Iodine Transport Mechanisms, Progress Rept for May 1980)
- ML19341A130 + (Steam Generator Tube Rupture Iodine Transport Mechanisms, Monthly Progress Rept for Aug 1980)
- ML19296D989 + (Steam Generator Tube Rupture Iodine Transport Mechanisms, Monthly Progress Rept for Jan 1980)
- ML19323B327 + (Steam Generator Tube Rupture Iodine Transport Mechanisms, Monthly Progress Rept for Mar 1980)
- ML20030B704 + (Steam Generator Tube Rupture Iodine Transport Mechanism, Monthly Progress Rept for June 1981)
- ML19257C459 + (Steam Generator Tube Rupture Iodine Transport Mechanisms, Monthly Progress Rept for Dec 1979)
- ML19257A584 + (Steam Generator Tube Rupture Iodine Transport Mechanisms, Monthly Progress Rept for Nov 1979)
- ML19341D589 + (Steam Generator Tube Rupture Transport Mechanism, Monthly Progress Rept for Jan 1981)
- ML16148A459 + (Steam Generator Tube Rupture at Oconee Unit 2, Technical Review Rept)
- ML13302A168 + (Steam Generator Tube Rupture, Emergency Operating Instruction)
- ML19312E579 + (Steam Generator Tube Rupture, Revised Emergency Procedures)
- ML13311A634 + (Steam Generator Tube Rupture, Revision 0)
- DCL-07-104, Steam Generator Tube Service-Induced Indications in Thirteenth Refueling Outage + (Steam Generator Tube Service-Induced Indications in Thirteenth Refueling Outage)
- ML13330B471 + (Steam Generator Tube Sleeve Evaluation,San Onofre Unit 1)
- 05000389/LER-2001-003, Steam Generator Tube That Exceeded Plugging Criteria Remained In-Service + (Steam Generator Tube That Exceeded Plugging Criteria Remained In-Service)
- ML19289E678 + (Steam Generator Tube Thermal Stress Evaluation, Suppl 1 to App 2)
- ML20205T123 + (Steam Generator Tube W/55% Through Wall Defect Safety Evaluation for Structural Integrity)
- Information Notice 2005-29, Steam Generator Tube and Support Configuration + (Steam Generator Tube and Support Configuration)
- ENS 48380 + (Steam Generator Tube to Tube Wear)
- ML041240281 + (Steam Generator Tubes Degraded)
- ML041310366 + (Steam Generator Tubes Degraded - Update)
- ML042040158 + (Steam Generator Tubes Inservice Inspection - Response to NRCs Request for Additional Information for the Cycle 5 Refueling Outage)
- ML033180464 + (Steam Generator Tubes Plugged During Ninth Inservice Inspection)
- LR-N03-0293, Steam Generator Tubesheet Inspection Information + (Steam Generator Tubesheet Inspection Information)
- ML030980685 + (Steam Generator Tubesheet Inspection Information)
- W3F1-2003-0016, Steam Generator Tubesheet Inspection Information + (Steam Generator Tubesheet Inspection Information)
- L-2003-085, Steam Generator Tubesheet Inspection Practices + (Steam Generator Tubesheet Inspection Practices)
- ML031060249 + (Steam Generator Tubesheet Inspections)
- ML20059L719 + (Steam Generator Tubing ISI Rept for Eleventh Refueling Outage)
- 2CAN038706, Steam Generator Tubing Inservice Insp Rept for Fifth Refueling Outage.Minor Tube Wall Degradation Indications Observed in Steam Generators a & B.No Plugged or Defective Tubes Found + (Steam Generator Tubing Inservice Insp Rept for Fifth Refueling Outage.Minor Tube Wall Degradation Indications Observed in Steam Generators a & B.No Plugged or Defective Tubes Found)
- ML20154H945 + (Steam Generator Tubing Inservice Insp Rept for 2R4 Refueling Outage)
- 1CAN028703, Steam Generator Tubing Inservice Insp Rept for Seventh Refueling Outage + (Steam Generator Tubing Inservice Insp Rept for Seventh Refueling Outage)
- ML20096H270 + (Steam Generator Tubing Inservice Insp Rept for Tenth Refueling Outage)
- ML20246D535 + (Steam Generator Tubing Insp Results)
- 1CAN060601, Steam Generator Tubing Inspection Report + (Steam Generator Tubing Inspection Report)
- ML20154A635 + (Steam Generator U-Bend Tube Fatigue Evaluation)
- ML20205S907 + (Steam Generator U-Bend Tube Fatigue Evaluation)
- ML20246D764 + (Steam Generator Update Tube Bundle Structural Integrity Presentation)
- ML20261J762 + (Steam Generator Upper Restaint Installation Notes)
- ML051820267 + (Steam Generator Voltage Based Alternate Repair Criteria for Axial Outside Diameter Stress Corrosion Cracking - Cycle 6 Ninety Day Report)
- ML040220171 + (Steam Generator Voltage Based Alternate Repair Criteria for Axial Outside Diameter Stress Corrosion Cracking (ODSCC) - Cycle 5 Ninety Day Report)
- ML19329F921 + (Steam Generator Water Hammer Demonstration Test)
- ML18142A694 + (Steam Generator Water Hammer Prevention)
- ML19294B465 + (Steam Generator Water Hammer Technical Evaluation, W/ 800109 Forwarding Ltr)
- ML20126B253 + (Steam Generator Water Hammer Technical Evaluation for Facility. Eg&G to Id Operations Ofc,Doe,Encl)
- ML19259D226 + (Steam Generator Water Hammer Technical Evaluation)