Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18144A704 + (Shutdown Cooling Flow)
- ML18065A115 + (Shutdown Cooling Heat Exchanger)
- ENS 42252 + (Shutdown Cooling Inoperability Due to Small Discharge Header Leak)
- ENS 48410 + (Shutdown Cooling Isolation Capability Lost)
- ML20087C511 + (Shutdown Cooling Not Being Available)
- ENS 51807 + (Shutdown Cooling Pipe Void)
- 05000528/FIN-2013002-05 + (Shutdown Cooling Piping Failure)
- 05000285/FIN-2013013-22 + (Shutdown Cooling Piping and Pipe Supports Calculation Has Incorrect Acceptance Criteria for Anchor Displacement)
- 05000249/LER-1980-048-03, Shutdown Cooling Sys Inboard Isolation Valve Did Not Close During Shutdown,While Testing Group 2 & 3 Isolation Circuitry.Caused by Breaker Door Interlock Out of Adjustment.Interlock Adjusted + (Shutdown Cooling Sys Inboard Isolation Valve Did Not Close During Shutdown,While Testing Group 2 & 3 Isolation Circuitry.Caused by Breaker Door Interlock Out of Adjustment.Interlock Adjusted)
- 05000416/LER-1983-130-03, Shutdown Cooling Sys Isolated Twice When Suction Valve Received Isolation Signals.First Isolation Caused by Personnel Error.Second Caused by Use of Alligator Clips + (Shutdown Cooling Sys Isolated Twice When Suction Valve Received Isolation Signals.First Isolation Caused by Personnel Error.Second Caused by Use of Alligator Clips)
- ENS 52327 + (Shutdown Cooling System Declared Inoperable)
- 05000237/LER-2009-004, Shutdown Cooling System Isolation During Cooldown Due to Temperature Instrumentation Failure + (Shutdown Cooling System Isolation During Cooldown Due to Temperature Instrumentation Failure)
- ENS 47209 + (Shutdown Cooling Temporarily Isolated)
- ML20127E755 + (Shutdown DHR Analysis,Point Beach Case Study, Draft Rept)
- ML20127E373 + (Shutdown DHR Analysis,Quad Cities Case Study, Draft Rept)
- ML20205H842 + (Shutdown Decay Heat Removal Analysis of a Westinghouse 3-LOOP Pressurized Water Reactor.Case Study)
- ML20205K063 + (Shutdown Decay Heat Removal Analysis of a Babcock and Wilcox Pressurized Water Reactor.Case Study)
- ML20236N215 + (Shutdown Decay Heat Removal Analysis of a Combustion Engineering Pressurized Water Reactor.Case Study)
- ML20235U476 + (Shutdown Decay Heat Removal Analysis of a General Electric BWR4/MARK I.Case Study)
- ML20205Q986 + (Shutdown Decay Heat Removal Analysis of a Westinghouse 2-LOOP Pressurized Water Reactor.Case Study)
- ML20205R862 + (Shutdown Decay Heat Removal Analysis of a General Electric BWR3/MARK I.Case Study)
- ML20246P408 + (Shutdown Decay Heat Removal Analysis:Plant Case Studies and Special Issues.Summary Report)
- ML19211C009 + (Shutdown Decommissioning Activities Report)
- ENS 44456 + (Shutdown Due to Emergency Diesel Generator Shorting Ring Cracks)
- 05000482/LER-2020-001, Shutdown Due to Inoperable Containment Purge Isolation Valves + (Shutdown Due to Inoperable Containment Purge Isolation Valves)
- ENS 46197 + (Shutdown Due to Planned Emergency Diesel Generator Outage Exceeding Allowed Time)
- ML20263H208 + (Shutdown Equipment List. Sheet 1)
- ML20263H113 + (Shutdown Equipment List. Sheet 1)
- ML20261C999 + (Shutdown Equipment List. Sheet 1)
- ML20261C928 + (Shutdown Equipment List. Sheet 1)
- ML20261C800 + (Shutdown Equipment List. Sheet 1)
- ML20261C674 + (Shutdown Equipment List. Sheet 1)
- ML20260D717 + (Shutdown Equipment List. Sheet 1)
- ML20260D522 + (Shutdown Equipment List. Sheet 1)
- ML20260D454 + (Shutdown Equipment List. Sheet 1)
- ML20260D267 + (Shutdown Equipment List. Sheet 1)
- ML20263F743 + (Shutdown Equipment List. Sheet 1 of 13)
- ML20263F782 + (Shutdown Equipment List. Sheet 1 of 9)
- ML19318C862 + (Shutdown Heat Removal Sys Reliability in Thermal Reactors)
- 05000247/LER-1983-015-03, Shutdown Initiated When Containment Spray Pump 21 Operability Criteria Not Met & Diesel Generator 23 Out of Svc for Maint.Pump 21 Removed from Svc Due to High Vibrations + (Shutdown Initiated When Containment Spray Pump 21 Operability Criteria Not Met & Diesel Generator 23 Out of Svc for Maint.Pump 21 Removed from Svc Due to High Vibrations)
- ENS 55693 + (Shutdown Initiated in Accordance with Technical Specifications)
- ML13004A231 + (Shutdown Margin Calculation)
- ML20129H872 + (Shutdown Margin Calculations)
- ML20129H952 + (Shutdown Margin Calculations)
- ML20129H879 + (Shutdown Margin Calculations)
- 05000354/LER-2023-002, Shutdown Margin Less than Expected Resulting in a Condition Prohibited by Technical Specifications + (Shutdown Margin Less than Expected Resulting in a Condition Prohibited by Technical Specifications)
- Information Notice 1987-21, Shutdown Order Issued Because Licensed Operators Asleep While on Duty + (Shutdown Order Issued Because Licensed Operators Asleep While on Duty)
- 05000263/FIN-2008006-01 + (Shutdown Panel Requirements Removed from Improved Technical Specifications (Section 1R05.1b.(1)))
- ML18348A633 + (Shutdown Plant Briefly Over Weekend to Continue Minor Mechanical Repairs. Two Clutch Coils and One Seal Replaced on Reactor Control Drive Mechanism)
- ENS 40588 + (Shutdown Required by Technical Specifications Due to Inoperable Isolation Instrumentation)