Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20262E717 + (Shroud and Top Guide Fabrication Data.Sheet 2 of 2)
- ML20262E751 + (Shroud as Built Dimensions)
- ML20262E747 + (Shroud as Built Dimensions)
- ML20262E758 + (Shroud. Sheet 1 of 3)
- ML20262E762 + (Shroud. Sheet 2 of 3)
- ML20262E767 + (Shroud. Sheet 3 of 3)
- ML20262E803 + (Shroud.Sheet 1 of 5)
- IR 015000202/2000001 + (Shumaker Trucking and Excavating Contractors, Inc., - NRC Form 591M Part 1, Inspection Report 03039150/2020001)
- IR 015000202/1950001 + (Shumaker Trucking and Excavating Contractors Inc. - NRC Form 591M, Materials Inspection Report 03039150/2025001)
- ML20262J966 + (Shut Down Cooling Piping, as-built.Sheet 1)
- ENS 44205 + (Shut Down Initiated Due to Inoperable Steam Generator Flow Channels)
- ENS 44418 + (Shut Down Required by Technical Specifications)
- ENS 50007 + (Shutdown Action Initiated Because Hpci and Rcic Were Simultaneously Inoperable)
- ML25184A390 + (Shutdown Actions LAR Updated Audit Questions (EPID L-2025-LLA-0011 & L-2024-LLA-0171))
- ML20153H045 + (Shutdown Assessment of Vermont Yankee Nuclear Power Facility, Interim Rept to State of Vt General Assembly)
- ML20259B101 + (Shutdown Bypass Detailed Schematic Diagrams (38 of 50). Subassembly a)
- ML20259B273 + (Shutdown Bypass, Detailed Schematic Diagrams (28 of 50). Subassembly C)
- ML20259B045 + (Shutdown Bypass,Detailed Schematic Diagrams (17 of 50). Subassembly B)
- ML20259B381 + (Shutdown Bypass,Detailed Schematic Diagrams (6 of 50). Subassembly a)
- ML18144A704 + (Shutdown Cooling Flow)
- ML18065A115 + (Shutdown Cooling Heat Exchanger)
- ENS 42252 + (Shutdown Cooling Inoperability Due to Small Discharge Header Leak)
- ENS 48410 + (Shutdown Cooling Isolation Capability Lost)
- ML20087C511 + (Shutdown Cooling Not Being Available)
- ENS 51807 + (Shutdown Cooling Pipe Void)
- 05000528/FIN-2013002-05 + (Shutdown Cooling Piping Failure)
- 05000285/FIN-2013013-22 + (Shutdown Cooling Piping and Pipe Supports Calculation Has Incorrect Acceptance Criteria for Anchor Displacement)
- 05000249/LER-1980-048-03, Shutdown Cooling Sys Inboard Isolation Valve Did Not Close During Shutdown,While Testing Group 2 & 3 Isolation Circuitry.Caused by Breaker Door Interlock Out of Adjustment.Interlock Adjusted + (Shutdown Cooling Sys Inboard Isolation Valve Did Not Close During Shutdown,While Testing Group 2 & 3 Isolation Circuitry.Caused by Breaker Door Interlock Out of Adjustment.Interlock Adjusted)
- 05000416/LER-1983-130-03, Shutdown Cooling Sys Isolated Twice When Suction Valve Received Isolation Signals.First Isolation Caused by Personnel Error.Second Caused by Use of Alligator Clips + (Shutdown Cooling Sys Isolated Twice When Suction Valve Received Isolation Signals.First Isolation Caused by Personnel Error.Second Caused by Use of Alligator Clips)
- ENS 52327 + (Shutdown Cooling System Declared Inoperable)
- 05000237/LER-2009-004, Shutdown Cooling System Isolation During Cooldown Due to Temperature Instrumentation Failure + (Shutdown Cooling System Isolation During Cooldown Due to Temperature Instrumentation Failure)
- ENS 47209 + (Shutdown Cooling Temporarily Isolated)
- ML20127E755 + (Shutdown DHR Analysis,Point Beach Case Study, Draft Rept)
- ML20127E373 + (Shutdown DHR Analysis,Quad Cities Case Study, Draft Rept)
- ML20205H842 + (Shutdown Decay Heat Removal Analysis of a Westinghouse 3-LOOP Pressurized Water Reactor.Case Study)
- ML20205K063 + (Shutdown Decay Heat Removal Analysis of a Babcock and Wilcox Pressurized Water Reactor.Case Study)
- ML20236N215 + (Shutdown Decay Heat Removal Analysis of a Combustion Engineering Pressurized Water Reactor.Case Study)
- ML20235U476 + (Shutdown Decay Heat Removal Analysis of a General Electric BWR4/MARK I.Case Study)
- ML20205Q986 + (Shutdown Decay Heat Removal Analysis of a Westinghouse 2-LOOP Pressurized Water Reactor.Case Study)
- ML20205R862 + (Shutdown Decay Heat Removal Analysis of a General Electric BWR3/MARK I.Case Study)
- ML20246P408 + (Shutdown Decay Heat Removal Analysis:Plant Case Studies and Special Issues.Summary Report)
- ML19211C009 + (Shutdown Decommissioning Activities Report)
- ENS 44456 + (Shutdown Due to Emergency Diesel Generator Shorting Ring Cracks)
- 05000482/LER-2020-001, Shutdown Due to Inoperable Containment Purge Isolation Valves + (Shutdown Due to Inoperable Containment Purge Isolation Valves)
- ENS 43736 + (Shutdown Due to Inoperable Steam Driven Auxiliary Feedwater Pump)
- ENS 46197 + (Shutdown Due to Planned Emergency Diesel Generator Outage Exceeding Allowed Time)
- ML20263H208 + (Shutdown Equipment List. Sheet 1)
- ML20263H113 + (Shutdown Equipment List. Sheet 1)
- ML20261C999 + (Shutdown Equipment List. Sheet 1)
- ML20261C928 + (Shutdown Equipment List. Sheet 1)
- ML20261C800 + (Shutdown Equipment List. Sheet 1)