U1 entered
Technical Specification 3.0.3, and initiated actions to reduce power via
control rod insertion in preparations to enter startup within the following
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. Entry into
Tech Spec 3.0.3 was a result of both
HPCI and
RCIC injection systems being
inoperable at the same time.
During startup from the U1 refueling outage, RCIC and HPCI full flow testing was unable to be completed at rated reactor pressure prior to the expiration of the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> allowance per Tech Spec Surveillances 4.7.3.b* and 4.5.1.b.3** respectively. This occurred due to testing issues encountered while attempting to perform the rated pressure pump valve and flow tests.
U1 HPCI testing was completed satisfactorily at 0830, and HPCI was restored to operable. Plant shutdown was terminated at 0830 [EDT] as conditions for 3.0.3 no longer existed.
The licensee will notify the NRC Resident Inspector.