Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Second Round Questions Re Structural Engineering". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20058J088  + (Second Revised Final Deficiency Rept Re Crane Co Main Steam Atmospheric Dump Valves Welded W/O Required Preheat. Initially Reported on 810220.Valves Will Be post-weld Heat Treated & Requalified for Impact Requirements)
  • ML20070E247  + (Second Revised Final Deficiency Rept Re Johnson Machine Works Welds on Revolving Platform Trucks.Initially Reported on 811106.Also Reportable Per Part 21.New Welding Magnetic Particle or Dye Penetrant Tested & Training Initiated)
  • ML20040G621  + (Second Revised Final Deficiency Repts 50-438/81-23 & 50-439/81-25 Re Expansion Anchor Failures,Initially Reported on 810310.Lower Strength Concerete Safety Implications Expanded & Addl Info Provided Re Unaffected Anchors)
  • NOC-AE-02001427, Second Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval  + (Second Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval)
  • ML023090358  + (Second Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval)
  • ML21300A131  + (Second Revised Review Schedule Letter for GE-HITACHI LTR NEDC-33922P, Revision 0, BWRX-300 Containment Evaluation Method)
  • ML14085A335  + (Second Revised Scheduling Order)
  • ML100570166  + (Second Revision to Draft RAIs for SFP K-Infinity LAR)
  • ML19343C760  + (Second Round 2 Questions Re QA Areas)
  • ML20079S399  + (Second Round Discovery to Staff on Eddleman Contention 65)
  • ML20093D833  + (Second Round Interrogatories & Request for Production of Documents.W/Certificate of Svc.Related Correspondence)
  • ML20096F422  + (Second Round Interrogatories & Request for Production of Documents to NRC Re Contentions 215 & 224.Certificate of Svc Encl.Related Correspondence)
  • ML20004E175  + (Second Round Interrogatories Re Lack of Evidence to Support Intervenor Contentions.Certificate of Svc Encl)
  • ML20003C149  + (Second Round Interrogatories Requesting Info Re Seismic Parameters to Be Applied to Assess Liquefaction at Site & Bases for Disagreement W/Nrc Use of Earthquake Magnitude of 5.0 to 5.5.Certificate of Svc Encl)
  • ML20100G597  + (Second Round Interrogatories on 213-A to Applicants/ Emergency Response Personnel & Request for Production of Documents.Certificate of Svc Encl.Related Correspondence)
  • ML19347D288  + (Second Round Questions Q040.126 Through Q040.147 Re Diesel Generator Automatic Start Signal)
  • ML19329D497  + (Second Round Questions Re Accident Analysis)
  • ML19345H314  + (Second Round Questions Re Assumptions & Results of Containment LOCA Analyses)
  • ML19326B133  + (Second Round Questions Re Bypass Leakage,Tech Specs for Leak Rate & Containment Leak Rate)
  • ML19344A332  + (Second Round Questions Re Environ Qualification of safety- Related Equipment,Response Time Testing & post-accident Monitoring Equipment Requirements)
  • ML19345H313  + (Second Round Questions Re Fracture Toughness of All RCPB Base Metal,Heat Affected Zones & Welds)
  • ML19340A335  + (Second Round Questions Re Interim Rept & Suppl 1, Reactor Bldg Dome Delamination)
  • ML18031A235  + (Second Round Questions Re Performance Criteria Regarding Flood Protection,Identification of Doors Providing Flood Protection & Tech Specs Insuring That Doors Will Be Closed During Flood)
  • ML19345H312  + (Second Round Questions Re Radioactive Gaseous Effluent Monitoring Instrumentation)
  • ML19345H310  + (Second Round Questions Re Relevant Geophysical Data)
  • ML19319D103  + (Second Round Questions Re Structural Engineering)
  • ML18081B068  + (Second Round RAI for Limerick, 10 CFR 50.69)
  • CNL-25-065, Second Round Request for Additional Information - TVA Request for Approval of Revision 44 to TVA Fleet Quality Assurance Program Description  + (Second Round Request for Additional Information - TVA Request for Approval of Revision 44 to TVA Fleet Quality Assurance Program Description)
  • ML21019A567  + (Second Round Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device)
  • ML24190A080  + (Second Round Request for Additional Information)
  • ML19224D250  + (Second Round Request for Addl Info Required to Complete Evaluation of Application for OL)
  • ML20027A582  + (Second Round Request for Addl Info to Continue Review of Fsar.W/Encl Questionnaire Covering Class 1E Equipment & Failure of High Water Level Trip)
  • ML20115E497  + (Second Round of Comments on U.S. Department of Energy West Valley Demonstration Projects Final Study Document: Vitrification Facility Air Emissions During Open-Air Demolition, Measured Vs Predicted, WVDP-579, Rev. 0 (Docket No. 05000201 (Po)
  • ML071350660  + (Second Round of Draft RAI on the 9/15/07 Amendment Request)
  • ML19329E938  + (Second Round of Interrogatories & Document Requests to Intervening Parties.Incorporates by Ref Directions & Definitions Accompanying Applicant 720804 Initial Interrogatories & Request for Documents)
  • ML20031E751  + (Second Round of Interrogatories & Request for Production of Documents Directed to Rockford League of Women Voters. Certificate of Svc Encl)
  • ML18045A594  + (Second Round of Interrogatories & Request for Production of Documents Directed to Util.Requests Info Re Steps Taken by Rd Story When Filter Was Replaced & Circumstances Re locked-open Valve Condition.Certificate of Svc Encl)
  • ML20053D617  + (Second Round of Interrogatories & Requests for Admissions. Certificate of Svc Encl)
  • ML19338C247  + (Second Round of Interrogatories Directed to Coulee Region Energy Coalition.Requests Completion of Prior Answers to First Round.Requests Explanations Re Low Electrical Demand Growth & Alternative Energy Sources Alleged in Contentions)
  • ML20079J363  + (Second Round of Interrogatories Re Palmetto Alliance & Carolina Environ Study Group Emergency Planning Contentions 1,3,6-9,11,14,15 & 18.Certificate of Svc Encl.Related Correspondence)
  • ML20076L330  + (Second Round of Interrogatories Re Pressurized Thermal Shock.Related Correspondence)
  • ML18045A541  + (Second Round of Interrogatories Requesting Info on Criteria Used to Differentiate Between Single Incidents & Chains of Incidents,Continuing Violations,Witnesses & Bases of Item of Noncompliance.Certificate of Svc Encl)
  • ML14254A166  + (Second Round of Request for Additional Information Concerning Request to Adopt National Fire Protection Association Standard NFPA-805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric..)
  • ML14083A023  + (Second Round of Request for Additional Information Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mellla+))
  • ML13281A010  + (Second Round of Request for Additional Information Regarding License Amendment Request for Adoption of NFPA 805)
  • ML22262A308  + (Second Round of Requests for Additional Information for the WCAP-18446-P/WCAP-18446-NP, Revision 0, Incremental Extension of Burnup Limit for Westinghouse and Combustion Engineering Fuel Designs)
  • ML19289F996  + (Second Round of Util Interviews Re TMI Incident)
  • ML23065A219  + (Second Safety Pre-Application Meeting Summary)
  • ML20212H494  + (Second Sampling Event in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization)
  • IR 05000528/1975001  + (Second Ser/Qa Insp Repts 50-528/75-01,50-529/75-01 & 50-530/75-01 on 750701.No Deficiencies Noted.Major Areas Inspected:Qa Activities)
  • ML20010C149  + (Second Set Interrogatories Directed to La Consumer League, Inc.Certificate of Svc Encl.Related Correspondence)