ML071350660

From kanterella
Jump to navigation Jump to search

Second Round of Draft RAI on the 9/15/07 Amendment Request
ML071350660
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/15/2007
From: Tam P
NRC/NRR/ADRO/DORL/LPLIII-1
To: Scarpello M, Simpson S, Vasey R
American Electric Power Co, Indiana Michigan Power Co
tam P, NRR/ADRO/DORL, 415-1451
References
TAC MD3161
Download: ML071350660 (2)


Text

From: Peter Tam To: Scarpello, Michael; Simpson, Sue; Vasey, Bob Date: 05/15/2007 10:14:31 AM

Subject:

D.C. Cook Unit 2 - Second Round of Draft RAI on the 9/15/06 Amendment Request (TAC MD3161)

Bob:

We have reviewed your 4/20/07 response and determined that we need additional information (see below) to complete our review. Consistent with our review process set forth in NRR Office Instruction LIC-101, Rev. 3, we would like to first discuss this information need with you in a conference call:

(1) The response to Request 2 states that out-of-tolerance is defined as exceeding the band established around a desired value.... However, the licensee has not defined how this band is established. Provide the information about what uncertainties are included in the out-of-tolerance band, basis for their inclusion, and how it is calculated.

(2) The response to Request 2 states that "An as-found condition that exceeds the calibration tolerance......." However, the licensee has not defined how the calibration tolerance is determined. Provide the information about the uncertainties included in the calibration tolerance band, basis for their inclusion, and how it is calculated.

(3) The response to Request 2, on page 3, first full paragraph provides the example of Unit 1 calibration tolerance but did not state that the same value has been used for Unit 2 also and how it was determined. Provide the calibration tolerance band for Unit 2.

(4) The response to Request 2, on page 3, first full paragraph states that the out-of-Tolerance evaluation may include changes to the acceptance criteria, changes to switch design or calibration method (including the setpoint value), or the replacement of poorly performing components, but did not provide any detail on how it is determined and who makes that determination and how soon this evaluation is completed. Provide the missing information.

This e-mail aims solely to prepare you and others for the proposed conference call. It does not formally request for additional information, and does not convey any formal NRC staff position.

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation e-mail: pst@nrc.gov Tel.: 301-415-1451 CC: Garg, Hukam; Jin-Sien Guo Mail Envelope Properties (4649C047.51D : 12 : 35330)

Subject:

D.C. Cook Unit 2 - Second Round of Draft RAI on the 9/15/06 Amendment Request (TAC MD3161)

Creation Date 05/15/2007 10:14:31 AM From: Peter Tam Created By: PST@nrc.gov

Recipients Action Date & Time aep.com Transferred 05/15/2007 10:15:14 AM mkscarpello (Michael Scarpello) rgvasey (Bob Vasey) sdsimpson (Sue Simpson) nrc.gov OWGWPO02.HQGWDO01 Delivered 05/15/2007 10:14:40 AM HCG CC (Hukam Garg) Opened 05/15/2007 10:21:02 AM JSG CC (Jin-Sien Guo)

Post Office Delivered Route aep.com OWGWPO02.HQGWDO01 05/15/2007 10:14:40 AM nrc.gov Files Size Date & Time MESSAGE 3148 05/15/2007 10:14:31 AM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened