ML20100G597

From kanterella
Jump to navigation Jump to search
Second Round Interrogatories on 213-A to Applicants/ Emergency Response Personnel & Request for Production of Documents.Certificate of Svc Encl.Related Correspondence
ML20100G597
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/03/1984
From: Eddleman W
EDDLEMAN, W.
To:
CAROLINA POWER & LIGHT CO.
References
CON-#484-481 82-468-01-OL, 82-468-1-OL, OL, NUDOCS 8412070329
Download: ML20100G597 (2)


Text

RELATED CORRESPONDENCE 3 Deccmbsr 1984 y

UNITED STATES OF AMERICA NUCLEAR BEGULATOBY COMMISNION 00aTEc unu

+.,...

BEFORE THE ATOMIC SAFETY AND LICENbM*1:05 Glenn O. Bright Dr. James H. ' Carpentter ~: n ~YEk.

James L. Kelley, ChdWeiiit$is -

4 j

dRANC.4 In the Matter of CAROLINA POWER AND LIGHT CO. et al.

)

(Shearon Harris Nuclear Power Plant,

)

Unit 1)

)

ASLBP No. 82-1468-01

)

OL Second Round Interrogatories on 213-A hush *

  • N u[tf$n"oE' N 0mEnEs*

an General Interrogatory:

Please urovide new or sunnlemental answers to all general interrogatories in the lith set for which your answer (s) would now be different or are now different, to those questions.

213-A-4.

Are there any innlementing procedures for part(s) of the Emergency Response plan (offsite plan) in suonort of the Shearon Harris Nuclear Power plant which are not included in the plan?

213-A-5.

Please identify any and all procedures used or recuired for the Harris offsite plan, which are not ( a) fully set forth (b) referenced, in that offsite plan.

213-A-6.

Are there any procedures for implementing any part(s) of the Harris offsite plan, which are necessary to implement atry part(s)

]

of that plan, which are not (a) listed by title and part(s) it implesme'nte (b) fully set forth in the plan?

(c) Please identify all such nrodcedures and each part of the plan which each is necessary to innlement.

I REQUEST FOR PRODUCTION OF DOCUMENTS: Please produce all documents

.I which the identification of is requested above, at a mutually agreeable time and place, for inspection and conying.

6h ells Eddleman N.B. This reauest is filed under agreement with CP&L counsel allowing for'a second round of disexuovery on this contention fDbb obbo

.h

-.G

. JDR

,=2 1

UNITED STATES OF AMIRICA NUCLIAR REGULATORY C0!cdISSION In the matter of CAROL!hA POWEP k LIGHT CO. Et al. )

Docket 50-h00 Shearon Harris Nuclear Power Plant, Unit 1*

)

0.L.

CEICIFICATIOF SERVICE I hereby certify that ecpies of-W.E. 2d round interrogatories /

.i.

]

_ rsona=h fnw nvndur + i nn ne ant iman+, on contention 213-A f

HAVE been served this 3

day of Decenber 196L, by deposit in the US Wil, first-class postage prepaid, upon all parties whose names are listed below, except those whose nanes are Parked with an asterisk, for whom service was acconplished by Ju1Ees Jays Kelley, Glenn Bright and Janas Carpenter (1 copy each)

Atenic Safety and Licensing Board US Nuclear 9egulatory Connission Washin6 ton DC 20555 GeorEe F. Trowbridge (atterney for Applicants)

Shaw, Pittman, Potts & Trowbridge N uthanne G. Miller 1600 M St. NW ASLB Panel WashinEton, DC 20036 USNRC Washington DC 2055 5 Office of the Executive Legal Director

{

Spence W. Perry Attn Docke ts 50-400/h010 L.

piqa fo"C St. SU

  • da ngton DC 20555

'N Washingt n DC 20740 Docketing and Service Section (3x)

D*" E'*d CEA!L'E/FLP Attn Docke ts 50-h00/hC1 0.L.

Office of the Secretary Raleigh,J707 Vaveross NC 27606 USNRC L

Washington DC 20555 Dr. Linda W. Little (E plan only) covernor's waste Mst. Bd.

Steve Rochlais 513 Albenarle Bldg.

John Runkle, FE;iA-Suit'e. 700 325 N. sa11aburv St.

CCNC 307 Granville Rd 1371 Peachtree St.NE

  • aleigh, NC 2'7611 M

Chapel Hill Ne 2751k Atinnts GA 30309 Bra dley W. Jones Robert Gruber USNRC Region II Travi s Payne Exec. Director 101 Marietta St.

Edelstein & Payne Public Staff Atlanta GA 30303 mex 12607 Box 991 Raleigh NC 27605 Raleigh NC 27602 Richard Wilson, M.D.

Certified by _

_dh-729 Hunter St.

Apex NC 27502 I

_ _ _ _ -.