Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "SER Re Request for Relief from Inservice Testing Requirements". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19242D918  + (SER Re Operation of Facility.Suppl 1 to NUREG-75/100)
  • ML19290C376  + (SER Re Operation of Facility.Suppl 2)
  • ML19242D919  + (SER Re Operation of Facility.Suppl 2 to NUREG-75/100)
  • ML19296A605  + (SER Re Operation of Facility.Suppl 5)
  • ML19263E486  + (SER Re Operation of Fftf, Suppl 1)
  • ML19220A404  + (SER Re Operation of TMI-2.Suppls 1 & 2 Encl)
  • ML19289A056  + (SER Re Order for Mod of License Related to Error in Westinghouse ECCS Evaluation Model.When Final Calculations Are Submitted,Operation Will Conform to 10CFR50.46)
  • ML20028D402  + (SER Re Override of Containment Purge Isolation Valves During Postulated Accident.Electrical Instrumentation & Control Design Aspects Acceptable Except for Listed Changes)
  • ML20148C610  + (SER Re Potentially Serious Degradation of Offsite Power Sys. Licensee Mod Would Change Loads from Being block-started to Being sequentially-started.Mod Acceptable)
  • ML19269E976  + (SER Re Preliminary Design of BSAR-205)
  • ML19290B954  + (SER Re Preliminary Design of Balance of Plant SSAR (Bopssar) & Its Relationship to RESAR-41 Std Ref Sys)
  • ML20148P056  + (SER Re Preliminary Design of Westinghouse RESAR-414)
  • ML20212R342  + (SER Re Progress Made by Licensee in Area of Plant Maint.New Maint Organization Functioning W/No Major Weaknesses.Region III Will Continue to Monitor Maint at Plant to Assure Continued Control & Progress)
  • ML20245A825  + (SER Re Proposed Changes to Administrative Controls Section of Tech Specs Concerning Min Shift Crew Composition,Unit Staff Qualifications,Training,Plant Safety Review Committee & Safety Review Committee Composition.Changes Unacceptable)
  • ML20138P639  + (SER Re Proposed Mods to Maint Program.Licensee Should Identify Actions to Be Completed Prior to or After Restart. Region Should Actively Monitor Licensee Progress)
  • ML20195D417  + (SER Re Pump & Valve Inservice Testing Program)
  • ML20154C720  + (SER Re QA Program for Operations Described in FSAR Through Amend 85 Plus)
  • ML20204K056  + (SER Re Recombiner Capability Requirements,Per Generic Ltr 84-09.Exemption Request Granted)
  • ML17199S850  + (SER Re Regulation of Expansion Gap Fire on 860120 at Facility)
  • ML20214E423  + (SER Re Reliability & Operability of Tdi Diesel Engines as Source for Emergency Power.Engines Will Continue to Provide Reliable Svc Until Next Refueling Outage)
  • ML20117E326  + (SER Re Reliability of Tdi Divs I & II Diesel Generators.Tdi Diesel Engines Will Provide Reliable Standby Source of Onsite Power Per GDC 17)
  • ML18065A900  + (SER Re Relief Requests for Third 120-month Internal Inservice Testing Program.One Request Denied,Three Requests Approved for Interim Period & Remaining Requests Approved)
  • ML18092B538  + (SER Re Repair of Svc Water Sys Piping.Weld Overlay Repairs Together W/Radiograph Insps & Supporting Engineering Analysis Constitute Acceptable Repair Method for Pitting Degradation in Svc Water Sys Fan Cooler Piping)
  • ML20236N333  + (SER Re Request for Interpretation of EDG TS 4.8.1.1.2.e for Farley Nuclear Plant,Units 1 & 2)
  • ML14191A416  + (SER Re Request for Relief from ASME Code Requirements. Relief Request 15 Granted & Relief Requests 16-18 Denied)
  • ML13331A417  + (SER Re Request for Relief from Inservice Testing Requirements)
  • ML20127P693  + (SER Re Review of 850417 & 0501 Applications for Amend to License SNM-1895,authorizing Installation of Neutron Detectors in Reactor Vessel & Performance of Preoperational Tests.Amend Issuance Recommended Subj to Listed Conditions)
  • ML20133B480  + (SER Re Review of Tech Spec 3/4.7.1, Standby Svc Water Sys. Recommends Action Paragraph Be Modified to Read as Listed. SALP Input Encl)
  • ML20248E323  + (SER Re Revised Radiological Contingency Plan Dtd 890524. Concludes That Effectiveness of Subj Plan Not Reduced by Revs)
  • ML20207T424  + (SER Re SPDS Based on Documentation & 850513-15 Audit.Spds Does Not Fully Meet Requirements of Suppl 1 to NUREG-0737. Five Listed Variables Should Be Added to Spds.Interim Implementation Acceptable)
  • ML20215B872  + (SER Re Safety & Relief Valve Testing,Per NUREG-0737,Item II.D.1 or Multi-Plant Action F-14.Info Demonstrates Ability of RCS Porvs,Porv Block Valves,Safety Valves & Associated Piping to Function Under Expected Operating Conditions)
  • ML20198S178  + (SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2)
  • ML16342C318  + (SER Re Second 10-year Interval Inservice Inspection Program Plan & Associated Requests for Relief for Diablo Canyon Power Plant,Units 1 & 2)
  • ML14192A579  + (SER Re Seismic Qualification of Auxiliary Feedwater Sys.Sys Seismically Qualified & Able to Provide safety-related Function Following SSE)
  • ML20236X537  + (SER Re Seismic Qualification of Plant Auxiliary Feedwater Sys.Nrr Request for Addl Info Encl)
  • ML20235G965  + (SER Re Setpoint Methodology for Rosemont Replacement Transmitters.Licensee Proposed Methodology Not Adequate to Allow Approval to Be Used in Application of Units)
  • ML20141J174  + (SER Re Spds.Sys Insufficiently Human Factored to Allow User to Rapidly & Reliably Evaluate All Critical Safety Functions Required by NRC)
  • ML17255A488  + (SER Re Stagnant Flow Scenarios & Pressurized Thermal Shock Based on Info Submitted w/821122 Ltr.Risk Associated W/Pressurized Thermal Shock Acceptable Based on Involvement W/Westinghouse Owners Group)
  • ML17058A835  + (SER Re Station Blackout Evaluation for Facility)
  • ML20062C444  + (SER Re Station Blackout.Plant Does Not Conform W/Station Blackout Rule)
  • ML19254D195  + (SER Re Steam Generator Water Hammer)
  • ML20209H955  + (SER Re Tdi Diesel Generator Owners Group Findings & Recommendations for Operabilty/Reliabilty of Tdi Emergency Diesel Generators)
  • ML13322B054  + (SER Re Tdi Generator Crankshaft Cranking Problem at Plant. Licensee Must Demonstrate That Eddy Current Insp Procedure Is Capable of Detecting 10 Mil Deep Flaws)
  • ML17215A336  + (SER Re Thermal Shield Recovery Program)
  • ML17309A314  + (SER Re Thermal Sleeve Problems in Westinghouse Plants. Viewgraphs Encl)
  • ML20154Q973  + (SER Re Topical SAR for NAC-C28 Storage/Transport Cask Submitted by Nuclear Assurance Corp. Cask Design Acceptable Per 10CFR72 Requirements)
  • ML20198N951  + (SER Re Util 820715 & 830113 Responses to NRC 820104 Request for Addl Info Re Multi-Plant Action B-24.Licensee Will Be Required to Provide Formal Documentation of Mods & Schedule for Completing Design Changes)
  • ML20205T508  + (SER Re Util 820917,830701 & 0922 Applications for Amends to Licenses DPR-77 & DPR-79,changing Tech Specs to Permit Increase in Flow Rate of Air from Containment During Normal Operation.Changes Unacceptable)
  • ML20215G017  + (SER Re Util 830202,1216,840113 & 850528 Responses to Generic Ltr 82-33 Re Conformance to Reg Guide 1.97,Rev 2,as Applied to Emergency Response Facilities.Design Acceptable.Salp Input Encl)
  • ML20215G113  + (SER Re Util 830414,850315,0620,0906 & 860121 Responses to Reg Guide 1.97.Design Acceptable W/Respect to Conformance to Reg Guide 1.97,Rev 2,w/exception of Containment Sump Water Temp)
  • ML20155F994  + (SER Re Util 830415 & 860206 Responses to Generic Ltr 82-33 Concerning How Facility Meets Guidelines of Reg Guide 1.97 as Applied to Emergency Response Facilities.Applicant Conforms to Reg Guide Except for Listed Variables)