- ML16141A865 + (SE Granting Request for Relief 92-14,per 10CFR50.55a(g)(6)(i))
- ML15218A130 + (SE Granting Request for Relief 93-04,per 10CFR50.55(g)(6)(i).Requests for Relief 93-02,93-05 & 93-06, Authorized,Per 10CFR50.55a(a)(3)(ii))
- ML18153A051 + (SE Granting Third 10-yr Interval ISI Program Plan Requests for Relief SR-009 Through SR-017,subj to Requirement for Relief Request SR-014)
- ML20035H531 + (SE Granting Util Request for Relief Form ASME Section XI Core Requirements Re First 10-Yr Interval ISI)
- ML18153A921 + (SE Granting Util Requests for Relief & Proposed Alternative Exams for Plant,Units 1 & 2,second 10-yr Interval Inservice Insp Program)
- ML19329E319 + (SE Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC Nos. MF4540, MF4541 and MF4542; EPID No. L-2014-JLD-0044))
- ML20058F031 + (SE Informing That Changes to Pdms Requirements & Commitments List of 930115,does Not Constitute Unreviewed Safety Question,Nor Do They Involve Significant Hazard or an Environmental Impact)
- ML17263A944 + (SE Informing That Proposed EAL Changes for Plant Consistent W/Guidance in NUMARC/NESP-007 & Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50)
- ML22173A064 + (SE Input for Columbia PTLR LAR)
- ML060830105 + (SE MC5483 and MC5483, Relief Request RR-04-ON-013)
- ML15261A483 + (SE Not Accepting Topical Rept DPC-NE-3000, Thermal- Hydraulic Transient Analysis Methodology. TER Also Encl)
- ML22173A067 + (SE PVNGS Adoption of TSTF-567 SE)
- ML16139A435 + (SE Providing Reasonable Assurance of Continued Structural Reliability of Subject Sys Re Licensee Alternative Insp Schedule)
- IR 05000255/1990017 + (SE Re 10CFR50.59 Facility Change Packages Associated W/Steam Generator Replacement Program & Open Items Noted in Insp Rept 50-255/90-17.Cutting & Closing of Transfer Opening Acceptable.Final Acceptability Subj to Test Rept Review)
- ML17263A559 + (SE Re Amend 54 Requirements for Containment Isolation Boundaries for License DPR-18)
- ML17291B023 + (SE Re Applicability of Topical Rept NEDO-32205,rev 1, 10CFR50 App G,Equivalent Margin Analysis for Low Upper Shelf Energy in BWR/2 Through BWR/6 Vessels)
- ML17059A324 + (SE Re BWR Owners Group Response to GL 89-19, Request for Action Re Resolution of USI A-47, Safety.... Loss of Power Event Highly Unlikely to Cause Overfill Event by Affecting Feedwater Control Circuitry)
- ML20044C300 + (SE Re Compliance W/Gdc 17.Unit 2 Design Complies W/ Requirements of GDC & Acceptable.Licensee Should Employ Bus Differential Scheme)
- ML18039A473 + (SE Re Corrective Action Plan for Resolution of CREVS Issues for Plant)
- ML18064A828 + (SE Re Cracking of Inconel 600 Components at Plant)
- ML17202U899 + (SE Re Evaluation of Responses to NRC Bulletin 90-002. Responses Acceptable)
- ML17157C376 + (SE Re Hydrostatic Testing of Offgas Radwaste Piping.Nrc Agrees W/Licensee Disposition of Ncr.No Exemption Necessary)
- ML20035B694 + (SE Re ISI Program Plan That Identified Certain Parts of Licensee Program That Were Deficient.Staff Concluded That Program Must Be Modified Before Being Considered Acceptable)
- ML16342A234 + (SE Re Indications in Safety Injection Accumulator Tanks. Existing Indications in Stainless Steel Cladding of Safety Injection Accumulator Tanks Can Be Left as Is W/O Grinding or Repair)
- ML17290A652 + (SE Re Inservice Testing Program Relief Requests.Relief Requests RP-8,RP-9 & RV-22 Granted.Alternative Proposed in Relief Request RP-10 Authorized & Relief Request RV-13 Extended Until End of IST Interval)
- ML20056H265 + (SE Re Inservice Testing Program Requests for Relief)
- ML20217N938 + (SE Re New & Revised Relief Requests Submitted by 970130,0307 & 25 Ltrs in Relation to Third 10-yr Pump & Valve IST Program)
- ML18011B113 + (SE Re Reactor Auxiliary Bldg Emergency Exhaust Sys.Advises That 2 Gph Leak Rate Limit for ECCS Equipment Outside RAB Emergency Exhaust Sys Boundary Reasonable & Detectable)
- ML20058M929 + (SE Re SEP Topics III-2 & III-4.A, Wind & Tornado Loadings & Tornado Missiles. Licensee Estimated Reactor Core Damage Frequency Reduced Signficantly Such That Likelihood of Core Damage Reasonably Low)
- ML18065A798 + (SE Re Third 10-yr Interval ISI Program Plan Requests for Relief PR-02 & PR-04 for Plant.Licensee Proposed Alternative to Use Code Case N-522 in Lieu of code-required Pressure Tests Authorized)
- ML20056E091 + (SE Re Util 930614 Response to Bulletin 93-03, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in Bwrs. Util Justification for Not Implementing Addl Short Term Actions Acceptable)
- ML18302A303 + (SE Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order Ea-13-109 (CAC Nos. MF4364 and MF4365; EPID No. L-2014-JLD-0055)
- ML17202V100 + (SE Rejecting GE Methodology for Determining Rates of Generations of Oxygen by Radiolytic Decomposition (NEDO-22155).Rept Underpredicts Generation of Radiolytic Hydrogen for Boiling/Nonboiling Cases)
- ML060620500 + (SE Related to Amendment No. 163 - Non-Proprietary)
- ML20151T798 + (SE Related to NRC Bulletin 96-003,BWROG Topical Rept NEDO-32686, Util Resolution Guidance for ECCS Suction Strainer Blockage)
- ML20036A702 + (SE Summary Rept 1992)
- ML20148A319 + (SE Summary Rept for Fermi 2, Rev 1)
- ML20056C718 + (SE Supporting Amend 10 to License NPF-82)
- ML20127E352 + (SE Supporting Amend 157 to License DPR-46)
- ML20078S902 + (SE Supporting Amend 51 to License NPF-85)
- ML20127D390 + (SE Supporting Amend 67 to License DPR-45)
- ML20058D233 + (SE Supporting Amends 148 & 178 to Licenses DPR-71 & DPR-62, Respectively)
- ML20210Q446 + (SE Supporting Amends 161 & 156 to Licenses DPR-19 & DPR-25, Respectively)
- ML20198H994 + (SE Supporting Approval of Application Re Long Island Power Authority Aquisition of Long Island Lighting Co,Subject to Discussed Condition)
- ML20035A228 + (SE Supporting Conclusions in Licensee 901127 Rept That Analysis of as-built Configuration That Demonstrated Const Error Causing Insignificant Impact on Responses of Both D5/D6 Bldgs Acceptable,As Built)
- ML20035H182 + (SE Supporting Implementation of Reg Guide 1.97 Re Instrumentation to Follow Course of Accident,Per GL 82-33)
- ML20029D666 + (SE Supporting Proposed EAL Changes in EIP-ZZ-00101,Rev 15)
- ML20198J066 + (SE Supporting Proposed Merger of Atlantic Energy Inc,& Dp&L, Affecting Plant)
- ML16342C717 + (SE Supporting Request for Relief from Stop Valve Control & Interlock Requirements of Section Iii,Subsection NC-7142 of ASME Boiler & Pressure Vessel Code)
- ML17158A034 + (SE Supporting Rev 0 to Licensing Topical Rept NE-092-001, Power Uprate W/Increased Core Flow)
- ML23024A009 + (SE and Transmittal Letter for Threshold Determination, Energysolutions Merger/Restructuring)