Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML102070404 + (Revised Power Reactor Security Rule Letter)
- ML20137Q790 + (Revised Power Sys Mgt Business Dept Plan for Qualifying Class 1E Devices)
- IR 05000528/1994035 + (Revised Pp 2 & 14 to Insp Rept 50-528/94-35,50-529/94-35 & 50-530/94-35,correcting Any Ambiguity Re Submittal of TS Limits for Plant by Util)
- ML20134J414 + (Revised Pp of Proposed TS Changes Re Intermediate Range Trip Setpoints & Allowable Values for Units 1 & 2)
- ML102510015 + (Revised Prairie Island Indian Communitys Rebuttal Statement of Position on the Safety Culture Contention)
- ML102510008 + (Revised Prairie Island Indian Communitys Rebuttal Statement of Position on the Safety Culture Contention)
- ML102510007 + (Revised Prairie Island Indian Communitys Initial Statement of Position on Safety Culture Contention)
- ML20067B721 + (Revised Prairie Island Large Break LOCA Calculation Using WCAP-10924,Vol 1,Addenda 4 Model Changes)
- IR 05000282/2015004 + (Revised Prairie Island Nuclear Generating Plant, Units 1 and 2, NRC Integrated Inspection Report 05000282/2015004; 05000306/2015004, October 1, 2015 Through December 31, 2015)
- ML19165A078 + (Revised Pre-Application Meeting for the Model No. TN-32 Transportation Package with Tn Americas LLC)
- ND-18-1243, Revised Preliminary Amendment Request (Par): Passive Core Cooling System (Pxs) Gutter Drain Line Vents (PAR-18-022R1) + (Revised Preliminary Amendment Request (Par): Passive Core Cooling System (Pxs) Gutter Drain Line Vents (PAR-18-022R1))
- ML20154K244 + (Revised Preliminary Assessment of United Nuclear Corp Wood River Junction,Ri)
- ML20202E098 + (Revised Preliminary Evaluation of Us DOE Approach to Performance Assessment at West Valley Demonstration Project)
- ML20236G811 + (Revised Preservice Insp Plan for Nuclear Piping Sys & Component Supports)
- ML20236G816 + (Revised Preservice Insp Plan for Nuclear Piping Sys & Reactor Pressure Vessel)
- ML20247B199 + (Revised Pressure Temp Limits Rept for Byron Unit 2)
- ML21285A281 + (Revised Pressure and Temperature Limits Report)
- ML17313A128 + (Revised Pressure and Temperature Limits Report (PTLR))
- WBL-19-026, Revised Pressure and Temperature Limits Report (PTLR) + (Revised Pressure and Temperature Limits Report (PTLR))
- WBL-21-056, Revised Pressure and Temperature Limits Report (PTLR) + (Revised Pressure and Temperature Limits Report (PTLR))
- WBL-20-066, Revised Pressure and Temperature Limits Report (PTLR) + (Revised Pressure and Temperature Limits Report (PTLR))
- WBL-23-018, Revised Pressure and Temperature Limits Report (PTLR) + (Revised Pressure and Temperature Limits Report (PTLR))
- NRC-05-0080, Revised Primary Correspondence Recipient for Fermi 2 + (Revised Primary Correspondence Recipient for Fermi 2)
- ML20072V053 + (Revised Procedure 2000, Reactor Operation)
- ML20091A991 + (Revised Procedure 4000, Containment Bldg Pressure Test)
- ML20091A957 + (Revised Procedure 7202, Control Rod Drop Time)
- ML20237K695 + (Revised Procedure 8833XR-1, Diablo Canyon Rupture Restraint General Repair Procedure. Related Info Encl)
- ML20084K899 + (Revised Procedure AP/O/A/5500/31, Estimate of Failed Fuel Based on I-131 Concentration)
- ML20237K548 + (Revised Procedure ESD 223, Installation & Insp of Pipe Supports. Related Info Encl)
- ML20210E859 + (Revised Procedure ESD 240, Field Procedure for Nonconformance Reporting)
- ML20210E866 + (Revised Procedure ESD-268, Field Procedure for Deficient Condition Notices)
- ML20116D273 + (Revised Procedure GP-R-212110R, Procedures Generation Package for Vermont Yankee Nuclear Power Plant)
- ML20237F664 + (Revised Procedure PT-18, Control Room Charcoal Booster Fans Test)
- ML20072T458 + (Revised Procedure Qualification Record PQR-311, as Welded. Info Re Facilities Encl)
- ML20238A886 + (Revised Procedure Qualification Record PQR 467 Providing Weld Test Results for Plant.Related Info Encl.Copyrighted Matl)
- ML20236G539 + (Revised Procedure SEP-8, Emergency Equipment Maint Procedure)
- ML20128H189 + (Revised Procedure for Reporting Comply in Respect to Regulation 10CFR21)
- ML20071N092 + (Revised Procedure to Electrical Separation Test)
- ML20137J232 + (Revised Procedures Generation Package,Sequoyah Nuclear Plant)
- ML20072A633 + (Revised Procedures Including Rev 8 to AP-660, Turbine Trip & Rev 2 to EOP-10, Post-Trip Stabilization)
- ML20118B550 + (Revised Procedures Including,Rev 21 to AP-380,Engineered Safeguards Actuation & Rev 17 to AP-770, Emergency Diesel Generator Actuation)
- ML20106B714 + (Revised Procedures Including,Rev 4 to AR-921, Hydrogen Panel Annunciator Response & Rev 4 to AR-952, Wdb Annunciator Response)
- ML20141A647 + (Revised Procedures Notification of Do Not Use, Including Rev 10 to MP 701.1,Rev 5 to MP 701.3,Rev 6 to MP 701.4,Rev 5 to MP 743.1 & Rev 2 to MP 771.8)
- ML20141F562 + (Revised Procedures Notification of Do Not Use, Including Rev 5 to MP 723.4,rev 2 to MP 760.7 & Rev 4 to MP 773.4)
- ML20141H203 + (Revised Procedures Notification of Do Not Use, Including Rev 3 to MP 702.3,Rev 4 to MP 738.1,Rev 0 to MP 770.15 & Rev 2 to MP 790.12)
- RS-03-184, Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery + (Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery)
- ML19354D439 + (Revised Procedures,Including Rev 11 to Bzp 200-A1, Pwr... Action Levels (Eals) & Rev 2 to Bzp 210-A1, PWR Emergency Action Level (EAL) Philosophy)
- ML19324C262 + (Revised Procedures,Including Rev 13 to AP-380, Engineered Safeguards Actuation & Rev 10 to EP-290, Inadequate Core Cooling)
- ML20101R198 + (Revised Procedures,Including Rev 13 to Annunciator Response (AR) AR-303, ESC Annunciator Response, Rev 16 to AR-403, PSA H Annunciator Response, Rev 10 to AR-504, ICS L Annunciator Response & Rev 11 to AR-602, Tgf N..)
- ML20076F776 + (Revised Procedures,Including Rev 15 to Annunciator Response (AR) AR-302, Esb Annunciator Response & Rev 20 to AR-305, Es E Annunciator Response)
- ML20063H814 + (Revised Procedures,Including Rev 16 to Qep 120-0, Technical Director Index 58 & Rev 3 to Qep 120-T10, Key Point History Listing)