ML20236G539

From kanterella
Jump to navigation Jump to search
Revised Procedure SEP-8, Emergency Equipment Maint Procedure
ML20236G539
Person / Time
Site: University of Missouri-Columbia
Issue date: 10/02/1987
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
Shared Package
ML20236F854 List:
References
SEP-8, NUDOCS 8711030068
Download: ML20236G539 (3)


Text

__. ._

'.4 .  !

.H

'SEP-8

' EMERGENCY EQUIPMENT MAINTENANCE PROCEDURE

Purpose:

This procedure states how the operational readiness of emergency equipment

- and suppliest required by the Emrgency Procedures is to-be maintained, calibrated, tested, and periodically-inventoried.

Health Physics' Emergency Equipment:

Health Physics' Emergency Equipment and supplies required by the Site Emergency Procedures shall be maintained in two designated readily accessible ]

locations. The two. locations are the MURR Emergency Equipment Cabinets in the copy-machine' room _and the Backup Emergency Equipment Cabinet at RPDB in room 10. The 4 inventory check lists for.each . location are attached to this procedure and shall be ]

used to verify . quarterly that the contents of the cabinet meet at least the ]

required levels. All maintenance and inventory records on emergency equipment ]

shall be maintained in the Health Physics Office.

The civil defense kits stored at each location contain a G-M survey meter, an '!

ion chamber meter (500 R/hr range), and a set of self-reading pocket dosimeters.

These kits are exchanged routinely by Missouri SEMA for updated kits of instruments ]

which have been calibrated by SEMA. The self-contained breathing apparatus sets are inspected annually by the Columbia Fire Department. The emergency Health Physics' ]

equipment is supplemented by the Health Physics' instruments and equipment- used for I daily routine evaluations and is maintained and calibrated by the Operational Health' Physics' Program. j Off-Gas Monitoring Equipment:

l The off-gas stack monitor has three channels: gas, particulate, and iodine. i The three chanrels shall be calibrated semiannually by the Reactor Chemistry group ] '

using Reactor Chemistry Standard Operating Procedures:

RC/III-2 Calibration of Stack Particulate Monitor RC/III-3 Calibration of Stack Iodine Monitor RC/III-4 Calibration of Stack Gas Monitor The operability of the off-gas monitor is checked as part of the start-up check-list for normal reactor start-ups.

Fire-Fighting Equipment: l The fire hydrant in the reactor site is checked operable routinely by the ] l Columbia Fire Department. The fire extinguishers shall be checked annually by ] j the University of Missouri Physical Plant. ,

l 8711030068 871002 6 DR ADOCK 050 Rev. 2/10/87 App' l / x-L____. _

, SEP48 (Cont'd) Page 2 of 3 EMERGENCY LOCKER INVENTORY MURR COPY ROOM Date BY Number Number ]

Required Desired ]

O () 3 self-contained breathing apparatus:

(1) Inspection Dates ID

]

]

]

L (2) Inspection Dates ~

ID l' (3) Inspection Dates ID ]

l 1 () 2 flashlights - new batteries installed ]

l 1 () 1 first aid kit ]

5 () 5 "D" cell batteries replaced with new batteries ]

3 () 5 boxes swipes ]

0 () 1 box paper towels ]

0 () 1 box absorbent paper ]

2 () 4 bars face soap ]-

3 () 6 " Radioactive Material" tags ]

0 () 2 rolls tape ]

O () 1 roll " Radioactive Material" tape ]

2 () 2 full face respirators 3 2 () 5 half face respirators ]

8 () 10 spare filters for respirators ]

0 () Assorted plastic bags ]

2 () 4 NuCon permasigns ]

0 () NuCon permasign insets ]

1 () 1 box rubber gloves ]

4 () 7 sets protective clothing ]

0 () 20 ft. yellow and magenta rope ]

1 () 1 Civil Defense instrument kit -

date kit placed in cabinet .

]

REMARKS:

Rev . 10/ 2/ 8 / App'd +

s m -

[ ..

. ;' " SEP-8 (Cont'd) Page 3 of.3

. EMERGENCY LOCKER INVENTORY RESEARCH PARK DEVELOPMENT BUILDING F (RPDB)

Date By L -Number. Number. ]

Required Desired _" l 0' () 3 self-contained breathing apparatus:

{

(1) Inspection Dates ID 4 1 (.) 2 flashlights - new batteries installed: ]

1 ( ') 1 -first aid kit ]

5 (' ) . 5 "D" cell batteries replaced with new batteries l

'3 () 5 boxes swipes l 0 () 1 box paper towels l 0 (- ) l' box absorbent paper ')

2 () 4 bars face soap )

3- () 6 " Radioactive Material" tags l 0 () 2 rolls tape l 0 () 1 roll " Radioactive Material" tape ' <

2 '( ) 2 full face respirators 2- () '5- half face respirators 8 () 10 spare filters for respirators 0 () Assorted plastic bags 2 () .4 NuCon permasigns 0 () HuCon permasign insets 1 () I box rubber gloves 4 ( -) 7 sets protective clothing O' () 20 ft, yellow and magenta rope 1 () 1 Civil Defense instrument kit -

date kit placed in cabinet .

REMARKS:

Rev. 10/2/B7 App'd V , c _~

p

_