w --
n =4 o.,
GEORGIA TECl! RESEARCil REACTOlt l Chapter Procedure 7202 !
9 Approved 7-17-81 l Instrumentation Control Rod Drop Tine Latest Rev. 4-25-84 l
& Surveillance Page 1 of 5 I. - GENERAL REQUIREMENT A. Frequency.
Monthly B. Technical Specification or other reference See 3.2c., and 4.2c.
II. PREREQUISITES A. Reactor shutdown. Core is cold and xenon free.
B. A-licensed reactor operator to perform the rod withdrawals.
C. Containment Integrity exists (see Tech. -Spec. ,,'.
definition 1.26). -
III. PROCEDURAL INSTRUCTIONS A. Roset all control interlocks.
B. Drive the Regulating Rod f rom IN to OUT and record the following times (in seconds) or positions (in inches) on the data card in the Control Room files.
- 1. DOM 4 limit switch position.
- 2. Time to drive to the UP limit.
- 3. UP limit switch position.
- 4. Time to drive to the DON 4 limit.
r C. Set up initial conditions for the Universal Counter as described on pages 3 and 4 of this procedure.
D .~ Prior to mea'surement of the shim blade drop times, perform the following steps to evaluate the reactor shutdown margin. Note: These steps should be omitted if the core is not cold and xenon free.
1.'. Raise the regulating rod to the full OUT position.
! K0 60 G PM i
o GE0fGIA TECH RESEARCH REACTOR
- Chapter Procedure 7202 9 Approved 7-17-81 Instrumentation Control Rod Drop Time Latest Rev. 4-25-84
& Surveillance Page 2 of 5
- 2. Raise shim' blade No. 3 to the full OUT position.
- 3. Raise either shim blade 1, 2 or 4 until 0.015 k/k reactivity has been added (refer to the blade worth calibration' curves.)
- 4. Verify that the reactor is subcritical. Log this verification in the console logbook.
E. Shim Blade Drop Time. Drive a selected blade fr'om D%N limit to UP limit (determine Aux. Switch setting). Reset counter and press MANUAL SCRAM Switch. Record values for.the following positions and times.
- 1. DOWN limit switch position.
- 2. - Auxiliary DohN limit. switch position. ..
~
- 3. . UP limit switch position.
- 4. Drive time to UP limit.
- 5. Two drop times in milliseco'nds, as determined by the Universal Counter.
F. Repeat E l-5 for the remaining shim blades. . . .
IV. ACCEPTANCE CRITERIA A. Regulating Rod
- 1. Limit switch positions.
DOWN limit between 0.0 and 0.2 inch.-
UP-limit between 11.8 and 12.0 inch.
- 2. Drive ti1ne
- ~Between 45.5 and 48.5 seconds..
?
6..
6
. - - - , , . . . . . _ , . . , , , , , , , . _ - - - - - , , - , - , , . , , . . , , , . , -- n - . . , _
GECICIA TECII RESEARCil REACNR
~ Chapter Procedure 7202 9 Approved 7-17-81 Instrumentation Control Rod Drop Time Latest Rev. 4-25-84
& Surveillance Page 3 of S B. Shim Blades
- 1. Limit switch position UP limit between 54 and 57 degrees.
- 2. Drive time Between 30 and 345 seconds
- 3. Drop time ,
Between~430 and 500 milliseconds and time is not i20 msec different from previous months time.
C. Advise Reactor Supervisor if any acceptance criteria are not met-9 5
i l
l l
t s .
I
GEORGIA TECH RESEARCil REACTOR Chapter Procedure 7202
, 9 Approved 7-17-81
- Instrumentation Control Rod Drop Time Latest Rev. 4-25-84
& Surveillance Page 4 of 5 V. UNIVERSAL COUNTER - PREPARATION These steps outline the set-up required for the Universal Counter instrument necessary to perform the measurements specifled on the previous pages.
A. Initial Set-Up
- 1. . Remove LCRM input signal to the Universal Counter at rear of chassis.
- 2. Select "TI A to B" function. .
- 3. " Fast / Norm /liold" switch to Hold.'
- 4. " Time Base / Multiplier" switch to 1 millisecond.
- 5. " Time Base" toggle to X1.
6.. Channel A " Attenuation" to XI. ,
- 7. Channel A "AC-DC" to DC. .
- 8. Channel A " Slope" to minus.
- 9. "SEP-C04" to Separate. -.
- 10. Channel B " Attenuation" to XI.
- 11. Channel B "AC-DC" to DC.
- 12. Channel B " Slope" to positive.
- 13. Channel B " Level" to 0.
B. Regulating Rod The Universal Counter is not used for any regulating rod measurements.
C. Shim Safety _ Rods
- 1. When the auxiliary limit switch position is being determined, first trigger the counter CN by moving the Channel A " Level" control f rom -0.5 to +0.5 7
then back to -0.5.- Drive the blade up until the s switch resets and the counter stops. Then change the Channel A slope to positive. Again, turn the
--y-- - .- g ,m.,,-n-,.ww- ,-- , -y , - - -_y , - -
GEORGIA TECil RESEARCll REACTOR
. Chapter Procedure 7202 9 Approved 7-17-81 Instrumentation Control Rod Drop Time _ Latest Rev. 4-25-84
& Surveillance Page 5 of 5 level control to start the counter. Drive the blade down until the switch actuates and the counter stops. Read the blade position.
- 2. Drive the blade to the up limit position.
- 3. Reset the counter and firmly press the SCIW4 button. The counter will display the drop time in milliseconds.
- 4. Drive the blade from the down limit to the up t
limit and determine the drive time.
- 5. Repeat step 3 'above to determine the second drop time.
D. Return to Normal Operating Mode.
- 1. " Fast / Norm /llold" switch to Norm. , .
- 2. Function switch on STOP. -
- 3. " Time Base / Multiplier" to 1 second.
- 4. Connect LCRM signal lead to ' counter.
?..
-